Custom Gear Set

January 6, 2023

Finished parts at Hoang Gia Garment, a DEWIN-audited Vietnamese factory

Cutting and drilling equipment at Win-Viet Precision Machinery, a DEWIN-audited Vietnamese factory

When developing new products with customers, we will provide customers with advice based on our experience and expertise to ensure that our final products can meet the customer’s use requirements. Recently, we helped an engineering design company develop a gear set.

 

 

 

Target Cost

The customer only had a preliminary draft of the drawing, only marked with dimensions, but no tolerance. Hence, our professional designers helped the customer improve the graphic, marked with patience, and developed a detailed material formula scheme for the customer’s reference according to our performance prediction of the use scenario. After our quotation, the customer said he needed to pay more attention to the product manufacturing and had no requirements for the product materials and performance. Hence, our quotation was higher than his target price. However, our engineers found during the test that the gear set made of materials that met the customer’s target price could not meet the customer’s use requirements. After communicating with the customer, the customer still chose to reduce costs.

Press brake forming sheet metal at Ntp Group, a DEWIN-audited Vietnamese factory

Sample Testing

However, in the spirit of being responsible for the customer and ensuring that the product can meet the customer’s use requirements, we made two samples, one is the material sample we predicted, and the other is the material sample that meets the customer’s target cost. We sent the two pieces to the customer for testing. After the customer tested, he told us that the sample that met his target price had broken during the Shipping test. The material sample we selected successfully passed all tests. The final customer chose the materials we predicted and increased the order quantity.

 

We (Dewin) will try our best to meet the target needs of customers. At the same time, we will unswervingly and responsibly put forward our suggestions in the professional field because our ultimate goal is to satisfy customers, ensure that products can be used, and create value for customers.

Video: Electrical switchgear and enclosure manufacturing lines in Vietnam. (@dewintech)

Precision Manufacturing & Sourcing Specification Matrix

Technical DimensionStandard Commercial GradeHigh-Precision OEM Export GradeDEWIN Verification Protocol
Machining & Forming ToleranceISO 2768-m (±0.10 mm nominal)ISO 2768-f (±0.01 mm – ±0.025 mm critical bores)Calibrated 3D CMM & Air/Pin Gauging
Surface Roughness & FinishRa 1.6 – 3.2 µm as-machined / standard coatRa 0.4 – 0.8 µm precision ground / MIL-A-8625 anodizedProfilometer & Coating Thickness Gauge
Material & Alloy CertificationSupplier Mill Test Report (MTR)Independent OES chemical & mechanical verificationEN 10204 3.1 + RoHS/REACH Compliance
Batch Inspection & PackagingISO 2859-1 (AQL 1.0 Major / 2.5 Minor)Zero-defect critical features + VCI export cratingPre-Shipment Inspection (PSI) Report

Frequently Asked Questions

What engineering files are required to quote custom gear set with DEWIN?

Provide 3D CAD models (STEP or IGES) along with 2D engineering drawings (PDF/DXF) specifying critical-to-quality (CTQ) tolerances, material grade, surface finish, and annual volume.

How does DEWIN verify dimensional accuracy and material compliance before shipment?

Every production lot undergoes incoming material spectrometer verification (EN 10204 3.1), First Article Inspection (FAI) via 2D/3D coordinate measuring machines (CMM), and AQL pre-shipment audits.

Can DEWIN support both low-volume prototype validation and mass production scaling in Vietnam and China?

Yes. DEWIN coordinates rapid CNC and bridge-tooling prototypes alongside high-tonnage production tooling across audited ISO 9001 and IATF 16949 partner factories in Vietnam and China.

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.

Upload CAD & Get Quote →

This article is part of DEWIN's technical manufacturing engineering knowledge base. Factory-specific details come from each factory's profile page — please verify current information there or with our team.