The Capabilities
of a Nation.
From 5-axis CNC to 3,000-ton die casting. Explore the processes supported by our network of 178+ audited factories. No estimates, no marketing spec-sheets—just the verified machinery on the ground in Vietnam.
How We Verify Every Factory
Equipment brands, machine counts, and inspection capability are verified in person by our on-site team — not taken from factory brochures or online profiles.
QCLDM Scoring — Factory Tier Classification
| Tier | Score | Rating | Suitable For |
|---|---|---|---|
| Tier 1 | 90–100/100 | ⭐⭐⭐ | Top-rated factories. Recommended for high-precision, high-volume, or regulated programs (automotive, medical, aerospace). |
| Tier 2 | 80–89/100 | ⭐⭐ | Solid factories. Recommended for standard commercial programs with professional quality expectations. |
| Tier 3 | 70–79/100 | ⭐ | Developing factories. May be suitable for simple parts with close DEWIN supervision. Improvement plan in progress. |
| Probationary | 60–69 or critical fail | ⚠️ | Not currently recommended for active programs. Under review or improvement plan. |
DEWIN recommends Tier 1 and Tier 2 factories for new programs. Tier 3 available with additional supervision.
Vietnam's FTA Network — Every Process Benefits
Parts manufactured in Vietnam with proper Certificate of Origin can access preferential tariff rates in 60+ countries through Vietnam's active FTAs. DEWIN manages COO documentation for every shipment.
CNC Machining
Multi-axis milling, turning, Swiss-type lathes, wire EDM. From single prototypes to 100K+ production runs. Vietnam's precision machining base includes Japanese-managed factories with 5S culture, in-house CMM and VMM inspection equipment.
Sheet Metal Fabrication
Fiber laser cutting up to 25mm, CNC press brakes, robotic welding, powder coating, e-coating. CNC fiber laser cutting verified vs. plasma/manual shear — non-contact process yields precision kerf and eliminates heat distortion on thin gauges.
Aluminum Die Casting
High-pressure, gravity, and low-pressure die casting. Aluminum ADC12/A380, zinc Zamak alloys, 80T–3,000T machines. Cold-chamber machine type verified to confirm suitability for aluminum alloys (vs. hot-chamber zinc).
Plastic Injection Molding
Thermoplastic and thermoset molding from 50T to 2,500T. In-house mold design, EDM, and secondary operations. Color comparison machine (colorimetry/delta-E) verified at select factories for color-critical programs.
Stamping & Pressing
Progressive die stamping, deep drawing, fine blanking. Single-hit presses to 600 SPM high-speed lines. Die maintenance logs and press tonnage records reviewed during Dolphin audit for production consistency assurance.
Precision & Investment Casting
Lost wax casting for complex geometries. Stainless steel, carbon steel, alloy steel. In-house wax injection — the dimensional accuracy foundation verified on-site. Hardness tester for alloy grade and heat treatment confirmation.
Iron & Sand Casting
Sand casting and gravity casting for larger, heavier parts. Gray iron, ductile iron, and steel. In-house CNC machining and finishing available. Spectrometer and metallurgical analysis for material grade verification.
Surface Finishing
Anodizing (Type II/III), electroplating, powder coating, e-coating, painting, passivation, and polishing. Finish type, tank concentration, and coating thickness verified during Dolphin audit — not self-reported from finish spec sheets.
Plastic & Rubber Parts
Rubber molding, O-rings, seals, gaskets, silicone parts, TPU/TPE overmolding, and custom compounds. Shore A hardness tester verified at select factories for compliance with buyer-specified material grade requirements.
Certifications Verified Across Our Network
Every factory certificate is physically verified during the Dolphin Audit. We check the IAF-accredited registrar, scope of certification, expiry date, and active shop-floor compliance.
ISO 9001:2015
Quality management system
IATF 16949
Automotive quality standard
ISO 13485
Medical device quality
ISO 14001
Environmental management
RoHS / REACH
Substance compliance
AS9100D
Aerospace quality standard
What "Physically Verified" Actually Means
How Our Capabilities Compare
Same processes as the big platforms — with full factory transparency and 50-point on-site audit
Frequently Asked Questions
DEWIN's Vietnam network supports 10+ manufacturing processes including CNC machining (59 factories), sheet metal fabrication (22 factories), aluminum die casting (24 factories), plastic injection molding (30 factories), stamping (13 factories), investment casting, iron/sand casting, surface finishing, plastic/rubber parts, and assembly. All factories are audited on-site using the 50-point Dolphin Audit.
The Dolphin Audit is DEWIN's proprietary 50-point factory assessment covering 5 pillars of 10 points each: Facility & Safety, Equipment & Capacity, Quality Systems, Workforce & Management, and Export Compliance. Our team physically visits the factory, photographs all major equipment, verifies certificates against registrar databases, and scores each criterion. Each factory receives a QCLDM score out of 100: Tier 1 (90–100) preferred suppliers, Tier 2 (80–89) approved suppliers, Tier 3 (70–79) conditional approval; factories scoring below 60 are not listed.
Vietnam has 16+ active FTAs. Key agreements include: CPTPP (Canada, Australia, Japan, Mexico, New Zealand, Singapore and more), EVFTA (EU 27 countries), RCEP (ASEAN + China + Japan + Korea + Australia + New Zealand), and UKVFTA (United Kingdom). DEWIN manages Certificate of Origin documentation (VCCI Form B and FTA-specific CO forms) for every shipment to maximize FTA benefit.
All equipment specifications are verified in person by DEWIN's on-site audit team during the Dolphin Audit Pillar 2 (Equipment & Capacity). Our team photographs machines, records make/model/year, verifies spindle count and tonnage, and checks maintenance logs. We do not rely on factory brochures or self-reported spec sheets. Real photos from our audits are shared with qualified buyers.
Across DEWIN's factory network: 80+ factories hold ISO 9001:2015, 12 hold IATF 16949 (automotive), 6 hold ISO 13485 (medical devices), 35+ hold ISO 14001 (environmental), 3 hold AS9100D (aerospace), and 100+ comply with RoHS/REACH. All certifications are physically verified during Dolphin Audit Pillar 3 — we confirm the registrar, scope, expiry, and practical QMS implementation.
Yes. DEWIN's Vietnam CNC machining network (59 audited factories) manufactures custom precision CNC components alongside spherical plain bearings, rod ends, and machined housings to ISO 2768-f (±0.005mm) tolerances. Parts undergoing substantial transformation in Vietnam qualify for VCCI Form B Certificate of Origin (0% US Section 301 tariff) and full CMM/VMM First Article Inspection (FAI).
See the Factories Behind the Capabilities
We don't just list capabilities — we show you the actual factories, their audit scores, their equipment, and their real photos. Request a factory tour or get a quote to get started.
Free consultation · Every factory audited on-site · COO documentation managed
Watch Our Manufacturing Capabilities
Real footage from our Vietnam factory network — CNC, sheet metal, casting, and more.

