Our Factories, On Film.
Nothing Hidden.
Every factory in our network has been visited in person by our audit team. We film what we find — production floors, equipment, QC systems, warehouses. 653+ real video clips. 1,700+ real photos. No stock footage. No fake factory shots.
5 Areas Captured on Every Factory Visit
Our audit team follows a standardized filming route through every factory — capturing what matters for buyers, not what the factory wants to show.
Factory Gate
Exterior, signage, access points — verifying the physical facility
Workshop Floor
Active production areas — see the real operation, not an empty showroom
Equipment
Machine brands, models, age, and capacity — not a spec sheet
QC Lab
Inspection tools, CMMs, sampling systems — real quality evidence
Products
Finished goods, packaging, labeling — what actually ships
Every Video is Part of a 50-Point Dolphin Audit
Our videos are not marketing — they are audit evidence. Every filming visit is paired with our 50-point Dolphin audit scoring system (QCLDM), which evaluates quality systems, capabilities, leadership, documentation, and manufacturing environment.
Learn About the Dolphin Audit →Watch Our Latest Factory Videos
Published on our official YouTube channel — factory tours, sample walkthroughs, and on-the-ground visits filmed by the DEWIN team in Vietnam.
Published June 2026
Published June 2026
Published June 2026
Published March 2026
Published February 2026
Published December 2025
Published December 2025
YouTube Short
Video Tour Episodes — Factory by Factory
Each episode features one audited factory. Shot on-site by our Vietnam team. What you see is what you source.

Equipment
Equipment
Equipment📸 Filmed by DEWIN audit team · 115 photos · 24 video clips · Dolphin audit verified
Precision Casting — Bueno Technology
Walk through the wax injection area, casting floor, CNC finishing line, and quality inspection room. 24 video clips across 5 production zones. 50-point Dolphin audit verified.
Full QC room inspection on camera
📸 Filmed by DEWIN audit team · 156 photos · 14 video clips · Dolphin audit verified
Die Casting — Hitech Mould
High-pressure aluminum die casting from mold setup through CNC finishing and surface treatment. 156 real photos and 14 walkthrough clips by our on-site team.
156 photos — one of our most documented

Products
Factory
Equipment📸 Filmed by DEWIN audit team · 109 photos · 17 video clips · Dolphin audit verified
Fastener Manufacturing — Lidovit
Cold heading, threading, heat treatment, and warehouse operations all filmed in detail. Factory KPI board, digital barcode warehouse, and hardness testing all on screen.
Digital warehouse + KPI management system

Workshop
Factory
Products📸 Filmed by DEWIN audit team · 60 photos · 16 video clips · Dolphin audit verified
Precision Casting — Kobayashi Casting
Japanese-managed precision casting facility in Vietnam. Wax injection machine, hardness testing, and a clean, documented inspection area — all on film.
Japan-standard QC in a Vietnam facility

Factory
Factory
Factory📸 Filmed by DEWIN audit team · 67 photos · 37 video clips · Dolphin audit verified
Metal Fabrication — Greenfield Technology
Our most video-rich metal fabrication factory. 37 clips covering laser cutting, welding, grinding, bending, and final inspection. A complete end-to-end view.
37 video clips — most in this category

Equipment
Equipment
Factory📸 Filmed by DEWIN audit team · 194 photos · 51 video clips · Dolphin audit verified
Outdoor Power Equipment — Ming Chuan
Major OEM manufacturer for outdoor power products. 51 videos and 194 photos covering injection molding, ISO-compliant finished goods warehouse, and full production flow.
51 video clips — highest in our network
More Factories with Video Documentation
99+ of our 178+ audited factories have video walkthroughs. Browse all by category or process.

Vietmachine Producing And Trading (Ichimens)
22 videos · 113+ photos

Lidovit
17 videos · 109+ photos

Kobayashi Casting
16 videos · 60+ photos

Minh Quang Mechanical Manufacturing
16 videos · 90+ photos
Want a Custom Factory Video Tour?
Tell us what you're sourcing and our on-ground team will visit matching factories, film the production areas you need to see, and deliver a complete video + audit report — including Dolphin audit scores — within 5 business days.
Request a Factory Video Tour →Real factories · 50-point Dolphin audit · 5-day delivery







