Skip to main content

🇻🇳 178 profiles · Engineering review

Enterprise Solutions: Vietnam Manufacturing Excellence

Scale your production with confidence. Meet our certified suppliers, leverage our on-the-ground quality team, and access 178+ verified factories.

On-The-Ground Quality Team

Our local engineers perform rigorous Dolphin QC audits, ensuring every batch meets ISO 9001 and IATF 16949 standards before it leaves the factory floor.

178+ Certified Suppliers

Don't guess who is making your parts. See real photos, real audits, and real equipment lists from our expansive network of premium Vietnam factories.

Dedicated Supply Chain Management

We handle the complexity. From matching you with the perfect facility to managing logistics, our enterprise tier is built for global buyers wanting hassle-free Vietnam sourcing.

178+
Audited Vietnam factories
1,700+
Real on-site photos
50-pt
Dolphin Audit, 5 pillars
16+
FTAs incl. CPTPP, EVFTA, RCEP

Only Tier 1 (QCLDM 90–100) and Tier 2 (80–89) factories are quoted for customer orders. $0 US Section 301 tariff on Vietnam-origin goods.

Inside a High-Capability Vietnamese Factory

Enterprise programs need serious manufacturing depth. Watch our visit to a Defense Ministry factory with strong manufacturing capabilities — the caliber of facility Vietnam's industrial base now supports.

Visiting a Defense Ministry Factory With Strong Manufacturing Capabilities

Visiting a Defense Ministry Factory With Strong Manufacturing Capabilities

Watch on YouTube

Workshop overview at an audited Vietnam factory
Aluminum die casting machine at an audited Vietnam factory
3D CMM inspection equipment at an audited Vietnam factory
Dewin QA engineer performing on-site inspection in Vietnam

Real photos taken on-site by our team — part of 1,700+ photos across 178+ audited factories.

Built for Enterprise Procurement Requirements

The commercial and compliance structure your legal and quality teams will ask about — answered up front.

US Contracting Entity

You contract with our US-registered Delaware LLC — a US contract with US legal recourse, not a direct overseas factory agreement.

DDP Delivery

Delivered Duty Paid to your dock: one accountable party for manufacturing, QC, export documentation, customs, and freight.

On-Ground Vietnam Team

Our own engineers in Ho Chi Minh City, Binh Duong, and Hanoi run audits, in-process QC, and pre-shipment inspections in person.

Certified Supplier Network

The audited network includes factories certified to ISO 9001, ISO 13485, IATF 16949, AS9100D, and ISO 14001 — verified on-site, not self-reported.

Scope Your Enterprise Program

Upload drawings and volume requirements — our engineers respond within 24 hours with pricing, lead times, and a match from the Tier 1–2 audited network.

Quick Sourcing Inquiry