Skip to main content

🇻🇳 178 profiles · Engineering review

🏭For Vietnam Manufacturers — No Listing Fee

Join the Dewin Verified
Factory Network

Pass our 50-point Dolphin Audit and get matched to US, EU, and CPTPP-market buyers who need exactly what your factory makes. 178+ verified factories already in the network.

178+
Verified Factories
16+
FTAs Covering Vietnam
$0
Listing Fee
50
Audit Criteria

Why Join the Dewin Network?

We connect verified Vietnam factories with international buyers who value quality, compliance, and reliability — not just the lowest price.

🌍

Access US & Global Buyers

Dewin's buyer base includes US procurement managers, European OEMs, and CPTPP-market sourcing teams. When your factory is verified in our network, you're visible to these buyers when they submit RFQs matching your capabilities.

💰

No Listing Fees

Zero cost to join. We don't charge factories subscription fees, listing fees, or commission on audits. Our fee model is buyer-side — you only transact when you receive and fulfill purchase orders.

📊

Get Your Dolphin Score

The 50-point Dolphin Audit gives you an independent, structured assessment of your factory's quality systems, equipment, and export compliance. Many factories use their QCLDM score in their own buyer presentations.

📸

Professional Factory Photos

Our audit team documents your factory with professional photos — production floor, equipment, QC area, finished goods storage. These photos appear in your factory profile and help international buyers understand your real capabilities.

🤝

Managed Buyer Relationships

Dewin manages the buyer relationship. You focus on manufacturing — we handle the sourcing process, specifications review, technical communication, COO/FTA documentation coordination, and export logistics support.

🔄

Repeat Business Programs

Once you're in our network and prove delivery reliability, buyers run repeat programs through us. Many Dewin suppliers have built multi-year relationships with US buyers who order quarterly or annually.

Vietnam's 16+ Free Trade Agreements — Your Export Advantage

As a Vietnam-based manufacturer, you have access to preferential tariff rates in the world's biggest markets — if your factory can document qualifying origin. Our Pillar 5 audit verifies your FTA documentation capability.

🌏

CPTPP

Markets: US, Canada, Australia, Japan, NZ, Mexico + others

Preferential rates for qualifying goods

🇪🇺

EVFTA

Markets: 27 EU Member States

Reduced/zero rates on 99% of goods over 10 years

🌐

RCEP

Markets: ASEAN + China, Japan, South Korea, Australia, NZ

Largest FTA by GDP — harmonized rules of origin

🇬🇧

UKVFTA

Markets: United Kingdom

Preferential rates post-Brexit

Vietnam is also a party to VKFTA, VCFTA, AHKFTA, and additional ASEAN bilateral FTAs. Dewin's Pillar 5 audit covers the most commercially significant agreements for our buyer base.

What the 50-Point Dolphin Audit Covers

The audit is structured around 5 pillars — 10 criteria each, 100 points total. Our auditor spends 2–4 hours on-site. You receive your full QCLDM score and written feedback afterward.

🏭
Pillar 01

Facility & Safety

Building safety, EHS compliance, 5S workplace organization, housekeeping, production layout, utilities.

⚙️
Pillar 02

Equipment & Capacity

Machine inventory, CNC equipment age and maintenance, production capacity vs. load, calibration, sub-contractor dependency.

🔬
Pillar 03

Quality Systems

IQC/IPQC/FQC processes, AQL sampling, non-conforming material control, CAPA documentation, ISO 9001 or equivalent.

👥
Pillar 04

Workforce & Management

Management communication, engineering team, operator training, labor turnover, production planning, customer complaint handling.

📋
Pillar 05

Export Compliance

COO documentation (VCCI Form B, FTA forms), HS code classification, anti-circumvention compliance, US/EU export track record.

QCLDM Scoring Tiers

Tier 1 — 90+Tier 2 — 80–89Tier 3 — 70–79Probationary — 45–59Not Listed — <45

Factories scoring below 60 are not listed but receive written corrective action feedback and can reapply after demonstrating improvements.

How to Join — 6 Steps

From application to your first matched RFQ — here's the full process.

01

Submit Your Application

Fill out our factory application form (link below) or email us directly. Include your factory name, location, processes, and approximate production capacity.

02

Initial Screening

Our team reviews your application within 5 business days. We check basic criteria: business registration, process match to our buyer demand, facility location accessibility, and export history.

03

Dolphin Audit Scheduling

If you pass initial screening, we schedule an on-site Dolphin Audit visit at a mutually convenient time. The audit visit typically takes 2–4 hours. There is no cost to the factory.

04

On-Site Audit & Scoring

Our auditor visits your factory, completes all 50 audit criteria, photographs your facility and equipment, and interviews your production manager. We share the audit findings with you after scoring.

05

Network Listing

Factories scoring 60+ are listed in the Dewin verified network. Your profile includes your QCLDM score, process capabilities, equipment highlights, and professional factory photos.

06

First RFQ Match

When a buyer submits an RFQ matching your capabilities, Dewin contacts you to quote. If you win, our team manages the program — providing POs, specifications, IPQC visits, and PSI before shipment.

Basic Requirements for Application

We review these during initial screening before scheduling the Dolphin Audit visit.

LocationVietnam-registered manufacturing facility with verifiable physical address
Minimum processesAt least one core manufacturing process from our buyer demand list (CNC, sheet metal, die casting, injection molding, casting, stamping, forging, extrusion, powder metallurgy, assembly)
Export experienceAt least one prior international export shipment preferred (not required for newly established factories with strong quality systems)
Business registrationValid Vietnam Enterprise Registration Certificate (Giấy chứng nhận đăng ký doanh nghiệp)
Quality systemSome form of documented quality control process (ISO 9001 preferred but not required; strong QC without ISO is acceptable)
COO capabilityAbility to produce VCCI Form B Certificate of Origin for Vietnam-origin goods

Not sure if you qualify? Contact us anyway — we assess each factory individually. Some factories that don't meet all criteria today can qualify after working on specific improvements.

What International Buyers Want from Vietnam Factories

Understanding buyer priorities helps you prepare for the Dolphin Audit and build the capabilities that win programs.

📐

Documented Dimensional Inspection

US buyers want to see CMM, VMM, or at minimum caliper station records. Factories that can produce First Article Inspection (FAI) reports and dimensional data sheets win more programs than those that only do visual inspection.

📄

COO & FTA Documentation Readiness

US buyers need to prove Vietnam origin to avoid Section 301 tariffs. Factories that understand VCCI Form B, can provide material origin declarations, and have experience with FTA certificate forms (CPTPP Form D, EVFTA EUR.1) are significantly more competitive.

🔄

PPAP / FAI Documentation Capability

US automotive, industrial, and OEM buyers increasingly require PPAP Level 2 or 3 documentation. Factories that can deliver control plans, MSA studies, and dimensional reports win higher-value programs.

📊

Transparent Capacity & Lead Times

Buyers value factories that are honest about capacity utilization and lead times. Overpromising and underdelivering destroys relationships. Our auditors score factories on production planning transparency — and buyers see this.

🛡️

No Anti-Circumvention Risk

The highest-risk issue for US buyers is a factory that transships Chinese goods labeled as Vietnamese. Our Pillar 5 audit specifically assesses whether your production genuinely transforms materials into Vietnam-origin goods. Clean factories get more business.

📸

Real Factory Photos & Video

International buyers make sourcing decisions without visiting factories. Our team documents your facility professionally. Factories with strong visual documentation — real machines, real production floors, real QC equipment — win trust faster.

Frequently Asked Questions

How do I apply to join the Dewin factory network?▼

Contact us via the form on this page or email sales@dewintech.com. We'll review your factory's process capabilities, location, and export history. If your factory meets our initial screening criteria, we schedule an on-site Dolphin Audit visit at no cost to you.

Is there a listing fee or subscription to join the Dewin network?▼

No. Dewin does not charge factories a listing fee or monthly subscription. Our business model is buyer-side. We earn by managing the sourcing program for our US and international clients — not by charging suppliers to be listed. The Dolphin Audit is conducted at no cost to the factory.

What score do I need to pass the Dolphin Audit?▼

Factories need a minimum QCLDM score of 60 out of 100 to be listed on the Dewin platform. Factories scoring 60–69 are probationary with an active corrective action plan; factories scoring 70–79 are listed as Tier 3. Factories scoring 80–89 are Tier 2 (recommended for most programs). Factories scoring 90+ are Tier 1 (recommended for precision, high-complexity, or export-compliance-critical programs). Factories scoring below 60 are not listed but can re-apply after documented improvements.

What types of factories are you looking for?▼

We primarily source for US and international buyers who need: CNC machining (milling, turning, grinding), sheet metal fabrication (laser cutting, bending, welding), die casting (aluminum, zinc), injection molding, investment casting, stamping, forging, powder metallurgy, extrusion, and surface treatment. We are particularly interested in factories with in-house quality equipment (CMM, VMM, hardness testers), ISO certifications, and documented COO/FTA experience for export to the US or EU.

What happens after I pass the Dolphin Audit?▼

Your factory is added to the Dewin verified network database with your QCLDM score, process capabilities, equipment list, and factory photos. When a US or international buyer submits an RFQ that matches your capabilities, Dewin will contact you to request a quotation. If you win the program, Dewin manages the buyer relationship and provides purchase orders, technical specifications, and quality standards. Our team will conduct IPQC visits during production and a PSI before shipment.

Ready to Apply?

Contact our Vietnam team to start your factory application. The Dolphin Audit is free. No listing fees. No subscription required.

📧 Email us at sourcing [at] dewinvietnam.com with your factory name, location, and key processes — or use the form below.

Quick Sourcing Inquiry