Skip to main content

🇻🇳 178 profiles · Engineering review

🇻🇳 Based in Vietnam. Not in an office.

The People Who WalkYour Factory Floors

Behind every audited factory profile is a real team that physically visited, photographed, scored, and verified that supplier. Our Vietnam-based team makes the transparency possible.

178+
Audited Factories
1,700+
Real Factory Photos
50
Points Per Audit
16+
FTAs via Vietnam

We Don't Manage Factories From a Dashboard

Every factory profile in our network exists because someone from our team went there, walked the floor, took photos, and filled out a 50-point audit report. That's the Dewin difference.

What Our Team Does — Every Week

🚗

Factory Visits

Our auditors travel to factories across HCMC, Binh Duong, Dong Nai, Hanoi, and other manufacturing hubs — physically inspecting every new supplier.

📸

Photo & Video Documentation

Every machine, every production area, every QC station photographed. The 1,700+ photos in our database are ours — not factory marketing materials.

📋

Dolphin Audit Scoring

Our proprietary 50-point audit covers quality systems, equipment, labor compliance, environmental standards, and financial health. Every factory gets a score.

🔬

Pre-Shipment QC

QC engineers inspect production batches before shipment. Dimensional checks, surface review, AQL sampling — problems caught in Vietnam, not at your warehouse.

Where Our Team Operates

●
Ho Chi Minh City (HCMC)
Primary hub — highest density of our factory partners
●
Binh Duong Province
Key industrial zone — metalworking, precision parts, casting
●
Dong Nai Province
Heavy manufacturing — large components, assemblies
●
Hanoi & Northern Vietnam
Electronics, stamping, specialized processes

Specialized Roles, Real Expertise

Our Vietnam team isn't generalists — each person has a specific role that keeps our factory network accurate and accountable.

🏭

Factory Auditors

Conduct the 50-point Dolphin audit on every new and re-audited factory. Responsible for the accuracy of every supplier profile.

📷

Documentary Photographers

Capture every factory's equipment, layout, and production environment. The 1,700+ photos in our database are their work.

🔬

QC Engineers

Inspect pre-shipment production samples. Dimensional checks, surface finish, AQL sampling against customer specs and accepted standards.

🤝

Supplier Relations

Build and maintain long-term relationships with factory management. Negotiate capacity, track lead times, resolve issues fast.

What This Means for Global Buyers

When you source through Dewin, you're not trusting a database — you're trusting a team with real knowledge of each factory.

🎯

Right Factory, First Time

Our team knows which factories have the right equipment for your specs — not just on paper, but from walking their floor.

🛡️

Quality Before Shipment

Pre-shipment QC means your defect rate stays low. Problems are caught in Vietnam, not at your warehouse or customer site.

👁️

Total Transparency

See real photos of the actual factory making your parts. Not a logo. Not a website. The actual production environment.

Ready to Meet Our Factories?

Browse 178+ audited factory profiles — each one verified by our on-the-ground team, with real photos, equipment lists, and audit scores.

Quick Sourcing Inquiry