📍 Personalizing for North America
US/CA/MX buyers benefit from $0 Section 301 tariff exemption on Vietnam-origin parts. VCCI Form B Certificate of Origin is required to support the origin claim at US/CA/MX Customs.
Air Express: 3–5 business days, Standard Air: 5–8 business days, Sea Freight: 18–25 days (West Coast) / 25–32 days (East Coast)
Manufacturing Cost
Comparison Calculator
See exactly how much you can save by manufacturing in Vietnam. Compare landed costs across China, US domestic, and Vietnam — including tariffs, shipping, and tooling.

Enter Your Project Details
All fields are estimates — we'll give you a precise quote within 24 hours.
For die casting, injection molding, stamping
China + Tariffs
US Domestic
Vietnam (via DEWIN)
Savings vs China + Tariffs
—
—
Savings vs US Domestic
—
—
Annual Savings (best case)
—
per year at your volume
Landed Cost per Unit — Visual Comparison
Calculation Assumptions
* These are estimates based on industry averages. Actual costs depend on part complexity, material, tolerances, and volume. Get an accurate quote for your specific project.
Looking for process-by-process shop floor cost data? Read our 2026 Vietnam Factory Pricing Benchmarks for CNC, sheet metal, stamping, and casting.
Lock In Your Vietnam Production Pricing
We've pre-configured your quote with the specifications above. Choose how you'd like to proceed:
Lock In with CAD
Upload 2D/3D drawings for confirmed shop-floor pricing & DFM within 24h.
No CAD Drawing?
Get instant factory match & ballpark confirmation in 2–4 hours.
Why Vietnam Costs Less — Without Cutting Quality
✓ No Section 301 Tariffs
Vietnam is exempt from the 25–100% tariffs applied to Chinese imports. This alone saves most buyers 25–35% on landed costs.
✓ Competitive Labor Rates
Vietnam's manufacturing labor costs are 30–50% lower than China's coastal hubs, with a young, skilled workforce of 55 million.
✓ 16+ Free Trade Agreements
Vietnam benefits from CPTPP, RCEP, EVFTA, and bilateral agreements — reducing duties for exports to 60+ countries.
✓ Same Quality, Audited Factories
Our 178+ factories pass a 50-point audit. ISO 9001, IATF 16949, ISO 13485 certified. We show you the factory floor — with 9,000+ real photos.