Skip to main content

🇻🇳 178 profiles · Engineering review

178+ Audited Factories Ready

Instant Quote from Vietnam'sBest Audited Factories

Configure your part and get an instant price estimate matched to our physically verified, 50-point Dolphin Audited factory network. No CAD file needed to start.

Upload Your CAD Files → Get a Real Quote

Or use the instant estimator below — no file needed.

178+ Audited Factories|50-Point Dolphin Audit|16+ FTA Markets|2–4 hr quote turnaround

Select Manufacturing Process

Our team will match your selection to the best Dolphin-audited factory in our network.

Live Estimate

Auto-updating
🇻🇳 Vietnam (Dewin) Best Value
$—
—
🇨🇳 China (est. incl. S301)
$—
—
—
Est. annual savings (×12 runs)

* Estimate only. Exact pricing from audited factory within 2–4 hrs.

How we match your factory

  • ①Process capability match (machines + tooling verified on-site)
  • ②Certification match (ISO 9001 / IATF 16949 / AS9100D as needed)
  • ③Dolphin Audit QCLDM score — Tier 1 or Tier 2 only
  • ④Current capacity + lead time availability
  • ⑤COO eligibility for your target export market

FTA advantage by market

🇺🇸 United States$0 Section 301
🇪🇺 EU (EVFTA)0% on most goods
🇬🇧 UK (UKVFTA)Reduced duties
🇯🇵 Japan (CPTPP)Reduced duties
🇦🇺 Australia (CPTPP)0% on most goods
View all 16+ FTAs →

Verified Client Outcomes

★★★★★

"The factory photos and audit reports gave us confidence we'd never had with a typical sourcing agent."

— Vishnu S., Texas Technology

★★★★★

"Seeing real CMM inspection records and 1,700+ factory photos before signing made the decision easy."

— Greg W., DOMS

Frequently Asked Questions

Quick Sourcing Inquiry