Surface Finishes & Coatings
30+ Options. One Source.
Anodizing, powder coating, plating, painting, and specialty coatings — all managed through our audited Vietnam factory network. No juggling separate finishing vendors.
Free finish recommendation with every quote · Color matching · Full coating test reports
Audited Machining & Finishing Partners
Real photos from our audited precision machining partners — most handle anodizing, plating, and powder coating in-house or at co-located finishing lines.

Machining Area
Napec Company Limited

Laboratory
Stand Dragon Technology Company Limited

After Deburring
Huynh Duc Production Trading Services Company Limited

Sample 3
Huynh Duc Production Trading Services Company Limited

Product 1
Huynh Duc Production Trading Services Company Limited

Vertical Machining Center Machine 6
Huu Hoc Mechanical Technology Company Limited
Which Finish Do You Need?
Start with your requirement — we'll point you to the right finish.
Outdoor / Corrosion
Powder coating, hot-dip galvanizing, e-coating, or marine-grade anodizing. 500–1000+ hrs salt spray.
Cosmetic / Decorative
Anodizing with color, mirror polish, chrome plating, wet painting. Consumer-grade appearance.
Wear Resistance
Hard anodizing, hard chrome, electroless nickel, or PTFE-impregnated coatings.
Electrical
Nickel, gold, or tin plating. Passivation to preserve stainless conductivity.
Medical / Food Safe
Passivation, electropolish, FDA-compliant coatings. Smooth, non-porous surfaces.
Budget-Friendly
Bead blasting, tumbling, black oxide, or zinc plating. Functional protection at minimum cost.
Chemical & Electrochemical Coatings
Specifications for every coating in our finishing network.
Anodizing (Type II)
Hard Anodizing (Type III)
Powder Coating
Wet Painting
Zinc Plating
Nickel Plating
Chrome Plating
E-Coating
Hot-Dip Galvanizing
Black Oxide
Passivation
Electroless Nickel
Mechanical Finishes
Surface preparation and texturing — often combined with chemical coatings.
Bead Blasting
Uniform matte finish. Removes tool marks. Ra 1.6–6.3 μm.
Tumbling
Deburrs edges, smooths surfaces. Ideal for high-volume small parts. Ra 0.4–1.6 μm.
Brushing
Linear grain pattern. Industrial-modern look on SS and aluminum. Ra 0.3–1.2 μm.
Polishing / Mirror
Progressive buffing to #4 satin or #8 mirror. Ra 0.05–0.2 μm.
Sandblasting
Aggressive texturing. Excellent coating adhesion. Ra 3.2–12.5 μm.
Lapping / Honing
Precision flatness for sealing faces and optical components. Ra 0.01–0.1 μm.
Coating Quality You Can Verify
Every finished part ships with documentation.
Thickness Testing
ASTM B499/B487 calibrated gauges. Every batch tested.
Salt Spray Testing
ASTM B117. 24h to 1000+ hours per your spec.
Adhesion Testing
ASTM D3359 cross-hatch. No peeling or delamination.
Color Verification
Spectrophotometer matching, ΔE < 1.0 accuracy.
Surface Finishing FAQ
What surface finishes are available?
Can you match custom colors?
How do you verify coating quality?
Do factories handle finishing in-house?
What's the typical cost of finishing?
Can you do selective masking?
Not Sure Which Finish? We'll Help.
Send us your drawings and requirements — our engineers recommend the optimal finish for your application, environment, and budget.
Or email