Why Ag Equipment OEMs Are Moving to Vietnam
Agriculture equipment manufacturing is one of the most cost-sensitive industries in the world. Your customers — farmers and distributors — are ruthless on price. Meanwhile, Section 301 tariffs have made China-sourced steel and aluminum parts 25–100% more expensive at the border.
Vietnam offers a compelling alternative. The country has deep expertise in heavy steel fabrication, CNC machining, and casting — built over decades of serving Japanese and European machinery OEMs. DEWIN has already proven this with real ag equipment projects, including a full supply chain migration for a US skid sprayer manufacturer that achieved 100% local Vietnam sourcing.
With 0% Section 301 tariff exposure and labor costs 30–40% below China, Vietnam delivers the landed cost savings that keep your equipment competitively priced — without compromising on weld quality, material specs, or delivery timelines.
Agriculture Applications We Serve
🚜 Frames & Structural
Sprayer frames, implement frames, trailer chassis, and skid mounts. Heavy steel fabrication with certified MIG/TIG welding and precision-machined mounting surfaces.
Processes: Sheet metal, welding, CNC machining, painting
🔩 Brackets & Mounting
Implement mounting brackets, hitch plates, pivot brackets, and linkage arms. Laser cut, formed, and welded from structural steel and aluminum plate.
Processes: Laser cutting, bending, welding
💧 Hydraulic & Fluid
Hydraulic manifolds, valve blocks, cylinder mounts, and fluid distribution components. Precision machined and pressure tested for leak-free performance.
Processes: CNC machining, honing, pressure testing
⚙️ Drivetrain Components
PTO shafts, gear sets, chain sprockets, drive pulleys, and coupling adapters. Machined from alloy steel with heat treatment for wear resistance.
Processes: CNC turning, gear hobbing, heat treatment
🌾 Tillage & Ground Engage
Plow points, harrow discs, cultivator sweeps, and seed openers. Cast and forged from high-manganese and boron steel for maximum field life.
Processes: Casting, forging, heat treatment
🛡️ Tanks & Enclosures
Chemical tanks, fuel tanks, control enclosures, and hopper assemblies. Stainless steel and aluminum fabrication with welded seams and pressure testing.
Processes: Sheet metal, TIG welding, polishing
✅ Proven: Skid Sprayer Frame — China to Vietnam Migration
We helped a US sprayer manufacturer migrate their entire skid sprayer frame production from China to Vietnam in 10 months — achieving 100% local material sourcing, zero Section 301 tariff exposure, and comparable quality with full weld certification.
Quality Standards for Ag Equipment
Fabrication Quality
- ✓ AWS D1.1 / ISO 3834 weld procedures
- ✓ Certified welders (6G qualified)
- ✓ Weld inspection (visual, MT, UT)
- ✓ Dimensional inspection per drawing
- ✓ Paint thickness & adhesion testing
Material & Documentation
- ✓ Material certificates (mill test reports)
- ✓ First article inspection reports
- ✓ Weld procedure specifications (WPS)
- ✓ Surface treatment certificates
- ✓ Photo documentation at every stage
Cost Comparison: Vietnam vs US & China
| Component | US | China + Tariff | Vietnam |
|---|---|---|---|
| Welded sprayer frame (qty 100) | $1,800–2,800 ea | $900–1,400 ea | $600–950 ea |
| Steel implement bracket (qty 500) | $18–28 ea | $8–14 ea | $5–9 ea |
| Hydraulic manifold (qty 200) | $120–180 ea | $55–80 ea | $35–55 ea |
| Cast iron plow point (qty 2,000) | $15–22 ea | $6–10 ea | $4–7 ea |
Indicative pricing based on typical complexity. China prices include estimated Section 301 tariff impact. Get an exact quote for your specific parts.
See the Factories Behind Your Parts
Every factory in our network is filmed and photographed by our on-ground audit team — no stock footage. Watch a Vietnam stainless steel pipe manufacturer at work, then browse real shop-floor photos from our audited fabrication network.
Audited Fabrication & Sheet Metal Floors
Real photos taken by DEWIN auditors inside sheet metal, stamping, and fabrication factories in our Vietnam network — the shops behind frames, brackets, and welded ag structures.

Company Name Plate
Viet Thanh Mechanical Production Company Limited

Work Bench (3)
Lap Phuc Mechanical Production Trading Company Limited

Work Bench
Jinjue Hardware Plastic Company

Raw Materials (3)
Hong Dat Technology Co Ltd

Sample
Smctech Jsc

Product 4
31 Electro Machannism And Explosive One Member Limited Liabi
