Skip to main content

🇻🇳 178 profiles · Engineering review

Manufacturing Standards

What We Hold Your Parts To — By Default

Every process has published default tolerances, finish expectations, and inspection options. If your drawing specifies something different, your drawing wins — always.

Your drawing overrides our defaults

The standards on these pages are what we apply when your 2D drawing or model annotations are silent. Any dimensional callout, GD&T frame, thread spec, weld symbol, or surface-finish symbol on your drawing takes precedence over the defaults listed here.

Requirements tighter than the published precision limits are reviewed by our engineers per part — geometry, material grade, and tool access all matter. Flag critical features on your drawing and we will quote them explicitly.

Standards by Process

Related

Have a drawing that needs holding to spec?

Upload it with your quote request — callouts on your drawing always govern over these defaults.

Get My Free Quote →

Quick Sourcing Inquiry