Vietnam's Die Casting Industry
Vietnam has become a serious contender in aluminum die casting, driven by investment from Japanese, Korean, and Taiwanese manufacturers who established operations in the country over the past 15 years. This technology transfer has created a mature domestic supply base with modern equipment and trained operators.
Vietnamese die casting factories now operate cold chamber machines from 200T to 2000T — capable of producing complex automotive, industrial, and consumer electronics components that previously could only be sourced from China or established Southeast Asian hubs like Thailand.
The cost advantage is substantial. Die casting involves both tooling (one-time) and per-piece costs, and Vietnam is competitive on both fronts. Tooling typically runs 40–50% less than China, while per-piece costs are 25–35% lower before the additional tariff savings. Explore our Die Casting & Sand Casting Foundries for machine tonnages and audited facility parameters across Vietnam.
High-Pressure Die Casting Shop Floors
Verified photographs of cold-chamber die casting machines (200T-2000T), trimming, and shot blasting.

Samples Shelf 9
Dai Minh Phat Production And Trading Company Limited

Sample 1
Tho Thanh Phat Die Casting Company

Sample 9
Excellence Team Vietnam Trading Co Ltd

Product 6
Gia Phat Thinh Phu Joint Stock Company

Products 2
Dysm Alumium Die Casting Co Ltd

Overview Of Workshop 3
Dysm Alumium Die Casting Co Ltd
See It in Production
Walk through a real Vietnamese plastic processing and die casting factory from our audited network — cold chamber machines, trimming, and finishing lines at work.
Capabilities
High-Pressure Die Casting
Cold chamber machines 200T–2000T. Ideal for aluminum automotive and industrial components with complex geometries and thin walls.
Tooling Design & Fabrication
In-house tool design with Moldflow simulation. H13 and premium tool steels. Multi-slide capability for complex undercuts.
CNC Post-Machining
In-house CNC milling, drilling, and tapping for critical surfaces. Keeps the entire process under one roof.
Gravity & Low-Pressure Casting
For lower volumes and thicker-walled parts. Better mechanical properties than HPDC. Ideal for structural components.
Materials & Specifications
Audited factories by alloy: aluminum die casting in Vietnam · zinc die casting in Vietnam.
Alloys
- ADC12 / A383
- A380
- A360
- AlSi10Mg
- AlSi12
- Zamak 3, Zamak 5 (Zinc)
- AZ91D (Magnesium)
Part Specs
- Tolerance: ±0.05mm
- Surface: Ra 0.8–3.2 μm
- Wall thickness: 1.0mm min
- Part weight: 10g–15kg
- Draft angle: 1–3°
Tooling
- Steel: H13, P20
- Life: 100K–500K shots
- Lead time: 4–8 weeks
- Simulation: Moldflow, MAGMA
- Slides: Up to 4-way
2026 Vietnam vs. China Die Casting Cost, Tariff & QC Comparison
Side-by-side procurement benchmarks across DEWIN's audited Vietnamese foundries and coastal Chinese die casting plants for US/EU-bound OEM components. For complete hourly machine rates and tooling models, consult our 2026 Vietnam Factory Pricing Benchmarks.
| Benchmark Parameter | Vietnam Audited Foundries | China Coastal Foundries | Verification & Compliance |
|---|---|---|---|
| Cold-Chamber Machine Range | 200T – 2,000T (Bühler, Toshiba, Lk) | 160T – 3,500T | On-site 50-Point Dolphin Audit |
| H13 Multi-Cavity Die Cost | $5,000 – $15,000 (4–8 wks to T1) | $8,000 – $20,000 (3–6 wks to T1) | Moldflow Gate & Porosity Simulation |
| US Import Duty (HTS 7616 / 8487) | 2.5% – 5.0% Standard MFN (0% Section 301) | 27.5% – 30.0% (MFN + 25% Section 301) | Chamber of Commerce Certificate of Origin |
| Dimensional & Internal QC | ±0.05 mm as-cast / ±0.01 mm CNC post-machined | ±0.05 mm as-cast / ±0.01 mm CNC post-machined | ASTM E505 X-Ray, OES Spectrometer, CMM & Helium Leak Test |
Applications
Automotive
Engine brackets, transmission housings, sensor covers, heat sinks, structural nodes
LED & Lighting
Heat sink housings, lamp bodies, driver enclosures, reflector frames
Power Tools
Motor housings, gear cases, handle frames, trigger guards
Telecommunications
Base station housings, connector bodies, antenna mounts, filter cavities
Furniture Hardware
Chair bases, table legs, cabinet hinges, decorative pulls
Industrial Equipment
Pump housings, valve bodies, pneumatic cylinder ends, manifolds
Frequently Asked Questions
What die casting alloys do you work with?
Primarily aluminum alloys: ADC12 (A383), A380, A360, AlSi10Mg, and AlSi12. We also offer zinc die casting (Zamak 3, Zamak 5) and magnesium die casting for lightweight applications.
What's the typical tooling lead time?
Die design and fabrication: 4–6 weeks for standard complexity, 6–8 weeks for complex multi-slide tools. We use P20 and H13 tool steel with 100K–500K shot life depending on alloy and complexity.
Can you do post-machining on cast parts?
Yes — most of our die casting partners have in-house CNC departments for post-machining critical surfaces, drilling, and tapping. This keeps everything under one roof for better quality control.
What's the minimum order for die casting?
Die casting is inherently a volume process due to tooling costs. Minimum practical order is typically 500–1,000 pieces to amortize tooling. For prototyping, we recommend gravity casting or CNC machining instead.
How do you inspect cast parts?
X-ray inspection, CT scanning, CMM dimensional checks, spectrometer material verification, porosity analysis, and pressure leak testing. All available at our partner factories.
What about secondary operations?
Deburring, shot blasting, vibratory finishing, CNC machining, threading, anodizing, powder coating, plating, and assembly. Our factories handle the full value chain.
Related Articles
Die Casting Complete Guide
Everything you need to know about die casting.
Die Casting Process Explained
Step-by-step breakdown of the die casting process.
Vietnam vs China Manufacturing
Full 2026 comparison for procurement teams.
Zinc Die Casting in Vietnam
Zamak alloys, tooling, and when zinc beats aluminum.
Investment Casting in Vietnam
Lost wax casting for lower-volume precision parts.
Ready for Die Cast Parts from Vietnam?
Send your 3D models — we'll provide DFM feedback, tooling quote, and per-piece pricing within 48 hours.
Get My Free Quote →
