Skip to main content

🇻🇳 178 profiles · Engineering review

Defense & Aerospace

Aerospace-Grade Precision.
Audited Vietnam Factories.

Tight tolerances, exotic alloys, full traceability — from Vietnam's AS9100D-capable factories. DEWIN's 50-point Dolphin audit means you see the real factory before you place your first order.

AS9100D-capable · AS9102 FAI · Full lot traceability · 178+ audited factories

178+
Audited Vietnam Factories
1,700+
Real Factory Photos
50-Point
Dolphin Audit per Factory
AS9100D
Capable Factories Available

Vietnam's Aerospace Manufacturing Sector

Vietnam's aerospace and defense manufacturing capability has grown significantly over the past decade, driven by investment from Boeing, Safran, Mitsubishi Heavy Industries, and other Tier-1 aerospace primes who have established Vietnamese suppliers for non-critical structural and mechanical components. This has created a tier-2 and tier-3 supplier base with genuine aerospace-quality systems — not just ISO 9001, but AS9100D, NADCAP capability, and the documentation disciplines that aerospace programs demand.

DEWIN has identified and audited the factories in this ecosystem that are right for international buyers sourcing non-ITAR commercial components. Our 50-point Dolphin audit goes beyond standard certifications to photograph the actual machines, measure the inspection capability, and assess traceability systems — so buyers know exactly what they're getting before the first PO.

Vietnam's strategic advantages: US-allied positioning, $0 Section 301 tariffs, and a government actively investing in aerospace manufacturing as a national priority sector.

Manufacturing Capabilities

CNC

Precision CNC Machining

3- to 5-axis milling and turning on Mazak Variaxis, DMG Mori, and Haas machining centers. Titanium, Inconel, 17-4PH, 7075-T6. Tolerances to ±0.005mm. EDM, jig grinding, deep-hole drilling available.

CAST

Investment Casting

Complex geometry structural parts in stainless steel, titanium, and nickel alloys. Turbine shroud segments, structural fittings, mounting hardware. X-ray and FPI inspection available from our casting foundry network.

SM

Sheet Metal & Fabrication

Enclosures, brackets, chassis, heat shields, mounting plates. Fiber laser cutting, CNC bending, TIG and robotic MIG welding. Aluminum, stainless, and titanium sheet. Mil-spec finishes including hard anodize and chem film.

SURF

Surface Treatment

Anodizing (Type II / Type III hard coat), chemical film (MIL-DTL-5541), passivation (ASTM A967), electroless nickel, phosphate coating, Cerakote, powder coat. Per MIL-spec where required.

ASSY

Mechanical Assembly

Multi-component mechanical assemblies with bearings, fasteners, inserts, and seals installed. Functional testing and serialized packaging per customer routing sheet. Sub-assembly and kitting available.

QC

Quality & Documentation

AS9102 FAI, PPAP Level 3, CMM reports with balloon drawing, material certs (MTR/EN 10204 3.1), hardness/surface roughness verification, NDT (MT, PT, UT, X-ray), CoC. Full QMS documentation package.

Non-ITAR Commercial Components We Produce

Airframe & Structural

  • ✓Brackets & structural fittings
  • ✓Bulkhead panels
  • ✓Structural clips & angles
  • ✓Wing rib sections (commercial)

Enclosures & Avionics

  • ✓Ruggedized enclosures
  • ✓EMI/RFI shielded housings
  • ✓Heat sinks & cold plates
  • ✓Connector housings

Engine & Propulsion

  • ✓Fuel system manifolds
  • ✓Turbine shroud segments
  • ✓Engine mounting brackets
  • ✓Exhaust components

Ground & Defense

  • ✓Vehicle structural mounts
  • ✓Optical sight housings
  • ✓Communication rack frames
  • ✓Mechanical linkage assemblies

The Dolphin Audit for Aerospace Factories

For defense and aerospace-capable factories, our 50-point Dolphin audit emphasizes the quality and traceability pillars that aerospace programs demand. You get the full report, machine photos, and certification evidence before placing any order.

📋

Quality System

  • ·AS9100D / ISO 9001 status
  • ·NADCAP capability
  • ·FAI / PPAP procedures
  • ·CAPA and change control
  • ·SPC and process monitoring
🏭

Equipment & Capability

  • ·Full machine list with specs
  • ·CMM — make, model, calibration
  • ·NDT equipment and certs
  • ·Surface finish measurement tools
  • ·Clean-room or controlled environment
🔗

Traceability

  • ·Mill cert requirements
  • ·Heat number tracking
  • ·Material segregation systems
  • ·Lot record retention policy
  • ·Part serialization capability

Materials for Aerospace Applications

🔩 Aluminum Alloys

6061-T6, 7075-T6, 2024-T3, 2014-T6

Structural frames, enclosures, brackets — most common aerospace material

⚙️ Stainless Steel

304, 316L, 17-4PH, 15-5PH, A286

Fasteners, fittings, engine components, high-strength structural parts

🚀 Titanium

Ti-6Al-4V (Grade 5), Ti-6Al-4V ELI, CP Ti Grade 2

High strength-to-weight ratio structural and engine components

🔥 Nickel Superalloys

Inconel 625, Inconel 718, Hastelloy C276

High-temperature applications, exhaust and turbine-adjacent parts

🧱 Engineering Plastics

PEEK, Ultem 1010, PTFE, Delrin

Non-structural housings, brackets, seals, insulators

🪨 Composites (machining)

CFRP, GFRP (machined only)

Trimming, drilling, and finishing of customer-supplied composite panels

See the Factories Behind the Parts

Our on-ground team films and photographs every factory it audits — no stock footage, no renders. Watch a walkthrough of a defense-sector factory in Vietnam, then browse real shop-floor photos from our audited precision machining network.

Visiting a Defense Ministry Factory With Strong Manufacturing Capabilities

Visiting a Defense Ministry Factory With Strong Manufacturing Capabilities

Watch on YouTube

Verified Gallery

Audited Precision Machining Floors

Real photos taken by DEWIN auditors inside CNC machining factories across our Vietnam network — the equipment class behind aerospace-grade work.

Case Study

DOMS: Precision CNC Components Held to ±0.01 mm

How DEWIN matched DOMS with an audited Vietnam CNC factory — ±0.01 mm tolerances verified on Mitutoyo CMM, first-article approval in 5 weeks, and approx. 30% landed cost reduction vs their previous China supplier. The same tolerance discipline aerospace programs demand.

Read the case study →

Capabilities for Defense & Aerospace

⚠️ ITAR & Export Control Notice

DEWIN Vietnam manufactures non-ITAR commercial defense and aerospace components only. Items controlled under the US Munitions List (ITAR, 22 CFR 120-130) or Export Control Classification Numbers under EAR (15 CFR 730-774) require appropriate US Government authorization before manufacture offshore. Please consult your export control officer or Legal team before engaging DEWIN for any potentially controlled item. We are happy to review your parts list and advise on what can be sourced from Vietnam under applicable regulations.

Defense & Aerospace FAQ

Which Vietnam factories can produce aerospace-grade precision parts?+
DEWIN's network includes CNC machining factories with AS9100D, ISO 9001, and NADCAP-capable quality systems — primarily in the Hanoi and Ho Chi Minh City industrial zones. These factories machine titanium, Inconel, 17-4PH stainless, and 7075-T6 aluminum to sub-±0.01mm tolerances on Mazak, DMG Mori, and Haas 5-axis machining centers. Every factory is physically audited and photographed under our 50-point Dolphin audit.
What defense and aerospace parts can DEWIN's Vietnam factories produce?+
Non-ITAR commercial components including: airframe brackets and structural fittings, ruggedized enclosures and EMI/RFI shielded housings, heat sinks and cold plates, engine mounting brackets, connector housings, optical instrument mounts, ground vehicle structural components, and mechanical assemblies. For ITAR-controlled items, consult your export control officer before engaging offshore manufacturing.
How does the 50-point Dolphin audit work for aerospace-grade factories?+
For aerospace and defense-capable factories, our Dolphin audit scores 50 checkpoints across 5 pillars with heightened emphasis on traceability and documentation: Quality System (AS9100D / NADCAP status, FAI capability, PPAP procedures), Equipment (machine list, CMM calibration, NDT capability), Material Traceability (mill cert requirements, heat number control, material segregation), Process Controls (SPC, work instructions, change control), and Financial Stability. You get the full audit report, machine photos, and equipment list before ordering.
What is DEWIN's approach to traceability for aerospace parts?+
Every aerospace order includes a full documentation package: raw material certificates traceable to the mill (EN 10204 3.1 or equivalent), AS9102 First Article Inspection with balloon drawing and CMM report, in-process inspection records, final dimensional and surface finish verification, NDT results (where specified), Certificate of Conformance, and serialized part marking (laser engraving, dot peen, or chemical etch). Full lot records retained minimum 10 years.
What aerospace materials do Vietnam factories work with?+
6061-T6 and 7075-T6 aluminum, 2024-T3, 304/316L/17-4PH stainless steel, Ti-6Al-4V titanium, Inconel 625/718, Hastelloy C276, brass, phosphor bronze, and engineering plastics (PEEK, Ultem, Delrin). Material certs are mandatory for every batch — no material substitution without customer approval.
What is ITAR and does it affect sourcing from Vietnam?+
ITAR (International Traffic in Arms Regulations, 22 CFR 120-130) controls the export of defense-related articles and services. DEWIN manufactures non-ITAR commercial defense and aerospace components only. Before engaging us for any item, verify it is not controlled under ITAR or EAR (Export Administration Regulations). If your parts require ITAR handling, consult your export control officer. We are happy to review your parts list and advise on what can be legally sourced from Vietnam.
How does sourcing from Vietnam compare to China for defense components?+
Vietnam offers significant advantages: $0 Section 301 tariffs vs 25%+ on Chinese-origin parts, no CFIUS concerns for commercial components, US-allied geopolitical positioning, and a growing aerospace manufacturing sector backed by government investment. Vietnam is a signatory to the US-Vietnam Defense Partnership and has one of the closest strategic alignments with the US among Southeast Asian nations.

Aerospace-Grade Parts from Vietnam's Audited Factories

Send your drawings, material specs, and quality requirements. We'll match your parts to the right AS9100D-capable factory and return a detailed quote with full audit documentation within 48 hours.

Quick Sourcing Inquiry