Skip to main content

🇻🇳 178 profiles · Engineering review

DFM Workbench

Interactive DFM Workstation

Upload your CAD through the quote wizard for an automated geometry read, manufacturability findings, an indicative price band, and matched Vietnam factories — or preview the workflow with demo data below.

See what an automated DFM pass looks like

When you upload CAD in the quote wizard, our system reads the geometry, runs deterministic manufacturability checks, builds an indicative price band, and shortlists audited Vietnam factories. Load the demo below to preview the output format.

Standard Geometric Guidelines

Standard engineering guidelines comparing global milling constraints against Vietnam-based shop capabilities.

CNC Vertical Pockets

Standard high-speed milling spindles require a vertical corner radius. Internal corners with 90° shapes require secondary EDM wire burning. Specifying R ≥ depth/3 can save up to ~40% in tooling cost.

Sheet Metal Bends

Ensure holes and stamp cutouts are located at least 2x sheet thickness away from bend axes to prevent severe structural deformation and high defect rates at audited bending stations.

Draft Angles

For rapid injection molding in plastic resins, virtual vertical faces must feature draft angles (minimum 1.5°) to ensure smooth parts ejection from automated molding cavities.

Quick Sourcing Inquiry