Skip to main content

🇻🇳 178 profiles · Engineering review

← All ServicesMetal Stamping

Metal Stamping from Vietnam.
Real Factories. Real Presses. Real Audits.

Progressive die stamping, deep drawing, fine blanking, and transfer stamping from our network of 178+ audited Vietnam factories. 25T to 1,000T presses, 0.05mm–6mm material thicknesses, steel through superalloys.

Tooling from $1,500 · Parts from $0.02 ea · 16+ FTAs covering Vietnam · Free DFM review

178+
Audited Vietnam Factories
1,700+
Real Factory Photos
50-Point
Dolphin Audit per Factory
16+
Free Trade Agreements

Vietnam's Metal Stamping Industry: What You Need to Know

Vietnam has become one of Southeast Asia's most significant metal stamping hubs — driven by Samsung, Toyota, Honda, and other Tier-1 manufacturers who built their Vietnamese supplier networks over the past two decades. The result is a mature ecosystem of progressive die stamping factories with modern presses, in-house die shops, and ISO 9001 quality systems.

For international buyers, Vietnam stamping offers 30–50% lower piece prices than equivalent US suppliers, and competitive pricing vs China — without the Section 301 tariff exposure that makes Chinese stamped parts more expensive for US importers. Vietnam's 16+ Free Trade Agreements also provide favorable access to European and Asian markets.

DEWIN's role: we've already done the factory selection work for you. Our 50-point Dolphin audit scores every stamping factory on press capability, die quality, inspection systems, and financial stability — so you know exactly what you're getting before you place your first order.

Verified Gallery

Progressive Stamping Shop Floors

Real photographs of high-speed progressive, compound, and transfer stamping lines in Vietnam.

See It in Production

Step inside a real Vietnamese factory with our local sourcing team — the same on-ground crew that audits and photographs every stamping supplier in our network.

Step inside a real Vietnamese factory with our local sourcing team

Step inside a real Vietnamese factory with our local sourcing team

Watch on YouTube

Stamping Processes Available

🔄

Progressive Die Stamping

  • ✓Multi-station die: blank, pierce, form, draw in one pass
  • ✓Speed: up to 600 SPM
  • ✓Press range: 25T to 400T
  • ✓Ideal for high-volume parts with tight positional tolerances
  • ✓Tooling: $2,000–$25,000+ depending on complexity
🏺

Deep Drawing

  • ✓Cylindrical, rectangular, and complex 3D shapes
  • ✓Material thickness: 0.3mm–4mm
  • ✓Single and multi-stage drawing operations
  • ✓Stainless steel, aluminum, and copper alloys
  • ✓Common applications: canisters, cups, enclosures, automotive shells
✂️

Fine Blanking

  • ✓Smooth, burr-free edges — no secondary deburring
  • ✓Tolerances: ±0.01mm
  • ✓Material: 0.5mm–6mm thickness
  • ✓Ideal for gears, pawls, brake pads, locking plates
  • ✓Eliminates grinding operations on critical edges
🔀

Transfer Die Stamping

  • ✓Large or complex parts moved between stations
  • ✓Press range: 100T to 1,000T
  • ✓Multi-slide operations possible
  • ✓Handles larger blanks than progressive die
  • ✓Used for automotive structural panels and structural brackets

Materials We Stamp

MaterialCommon GradesThickness RangeTypical Applications
Cold-Rolled SteelSPCC, SPCD, SPCE0.3–3mmAutomotive, appliances, structural brackets
Stainless SteelSUS304, SUS301, SUS3160.1–4mmMedical, food equipment, marine hardware
Aluminum1100, 3003, 5052, 60610.3–4mmElectronics enclosures, automotive, heat shields
Copper / BrassC1100, C2600, C2680, C28010.05–3mmConnectors, terminals, busbars, contacts
Phosphor Bronze / BeCuC5191, C17200.05–2mmSprings, contacts, electrical connectors
Spring SteelSK5, SUS301 (1/2H, 3/4H)0.1–3mmClips, retainers, springs, lock washers

What You See Before You Buy: The Dolphin Audit

Every stamping factory in our network has been scored on 50 checkpoints. Unlike sourcing from a trade fair or Alibaba listing, you get real factory intelligence: the actual press list, the die shop capability, the inspection systems, and the financial health of the supplier — before you place a single order.

🏭

Press Floor

  • ·Tonnage of every press
  • ·SPM capability
  • ·Coil handling setup
  • ·Press age & condition
🔧

Die Shop

  • ·In-house vs external tooling
  • ·EDM and wire-cut capability
  • ·Tool steel grades used
  • ·Die maintenance records
📏

Quality & Inspection

  • ·CMM and optical comparator
  • ·AQL inspection procedures
  • ·SPC and process control
  • ·ISO 9001 / IATF 16949 status

Secondary Operations — All Under One Roof

Most of our stamping partners offer extensive in-house secondary operations, eliminating subcontracting markups and quality handoff risks.

✓Tapping & threading
✓PEM insert installation
✓Spot & laser welding
✓Deburring & tumbling
✓Zinc & nickel plating
✓Powder coating
✓Anodizing (aluminum)
✓Heat treatment
✓Sub-assembly
✓In-line inspection
✓Marking & serialization
✓Custom packaging

How Your Stamping Project Works

1

Send Your Design

Upload 2D drawings or 3D CAD with material, thickness, and quantity. Our engineers review for stampability — strip layout, draw ratios, radii.

2

Factory Match & Quote

We match to the right factory based on press tonnage, material, and volume. Detailed quote covering tooling, piece price, and secondary ops.

3

Tooling & Samples

Die build in 3–5 weeks. First article samples with dimensional report and strip layout photo. Tooling modifications included as needed.

4

Production & Delivery

Mass production with in-process inspection. DEWIN pre-shipment inspection. Full documentation and compliant shipping documentation.

Related Guides

Metal Stamping FAQ

Which Vietnam factories does DEWIN work with for metal stamping?+
Our stamping network spans factories in Hanoi, Haiphong, Binh Duong, and Ho Chi Minh City — covering progressive die stamping (25T–1,000T presses), deep drawing, fine blanking, and transfer stamping. Every factory has been physically audited and photographed under our 50-point Dolphin scoring system.
What stamping processes do Vietnam factories offer?+
Progressive die stamping (up to 600 SPM), transfer die stamping, compound die stamping, deep drawing, fine blanking, and coil-fed stamping. Most factories also offer in-house secondary operations: tapping, riveting, spot welding, plating, powder coating, and sub-assembly.
What materials can you stamp?+
Cold-rolled steel (SPCC, SPCD, SPCE), stainless steel (SUS304, SUS301, SUS316), aluminum (1100, 3003, 5052, 6061), copper (C1100, C2600), brass (C2680, C2801), phosphor bronze, beryllium copper, and spring steel (SK5, SUS301). Material thicknesses: 0.05mm to 6mm.
What tolerances can Vietnam stamping factories hold?+
Standard stamping: ±0.05mm on blanked dimensions, ±0.1mm on formed features. Fine blanking: ±0.01mm. Progressive die with precision pilot pins: tight positional tolerances maintained throughout the strip. For electronics and connector stampings, we regularly achieve ±0.02mm.
How does the 50-point Dolphin audit work for stamping factories?+
Our Dolphin audit for stamping factories scores 50 checkpoints covering: Quality Management System (ISO 9001 status, press monitoring, SPC, AQL inspection), Equipment & Capacity (press tonnage list, speed ratings, die storage, coil handling), Tooling (die design capability, maintenance records, tool life tracking), Labor & Compliance, and Financial Stability. You receive the full audit score, photos of the press floor, and the complete machine list before placing your first order.
What is the minimum order for stamping projects?+
For new progressive die projects: we recommend 10,000+ pieces to justify tooling. Simple blanking/forming dies: 3,000+ pieces. Runs on existing dies: as low as 1,000 pieces. Tooling costs range from $1,500 for simple single-stage dies to $30,000+ for complex multi-station progressive dies.
How do I start a stamping project with DEWIN?+
Send us your 2D drawings or 3D CAD files with material specification, thickness, and quantity. We'll review for stampability, suggest any DFM improvements (blank layout, bend radii, tolerances), and return a quote covering tooling, piece price, secondary operations, and lead time within 48 hours.
What certifications do your stamping factories hold?+
Most factories hold ISO 9001:2015. Automotive-focused stamping factories also hold IATF 16949. Electronics-focused factories may hold ISO 14001 and RoHS-compliant process certifications. Specific certifications are listed in each factory's Dolphin audit profile.

Ready to Source Stamped Parts from Vietnam?

Send us your drawings and we'll return a factory match, DFM review, and detailed quote within 48 hours — tooling cost and piece price included.

Or email drawings to sourcing [at] dewinvietnam.com

Quick Sourcing Inquiry