Skip to main content

🇻🇳 178 profiles · Engineering review

Precision Tube Fabrication

Tube Laser Cutting & Bending

Consolidate multiple operations into one. Our advanced CNC tube lasers can cut, notch, bevel, and engrave in a single setup. Combined with automated tube bending, we deliver complex tubular frames and components at scale—tariff-free from Vietnam.

CNC laser cutting machine at An Thanh Technology, an audited DEWIN partner factory in Vietnam

Tolerance

±0.005"

Verified Gallery

Audited Tube & Sheet Metal Fabrication Floors

On-site photos from audited Vietnamese sheet metal and tube fabrication factories — laser cutting, bending, and welding lines documented by our audit team.

Tube Laser & Bending Capabilities

Our audited network in Vietnam features state-of-the-art Trumpf, BLM, and Mazak equipment for complex tubular structures.

Round Tube

Up to 6" (152mm) OD

Square Tube

Up to 4" x 4" (100x100mm)

Rectangular

Up to 4" x 3" (100x75mm)

Wall Thickness

0.035" to 0.500" (0.9-12.7mm)

Why Tube Laser Cutting?

Traditional tube fabrication requires sawing, drilling, punching, and milling in separate setups. A CNC tube laser combines all these operations into a single step.

  • Eliminate Tooling: No hard tooling required for coping or notching. Cut complex geometries directly from CAD data.
  • Self-Fixturing Designs: We cut tabs and slots (tab-and-slot design) that allow tubular frames to snap together for foolproof welding assembly.
  • Zero China Tariffs: Fabricating heavy tubular frames in China incurs massive Section 301 tariffs. Our Vietnam network eliminates this entirely.

Materials Processed

Carbon SteelA513, A500, DOM, HREW
Stainless Steel304/304L, 316/316L
Aluminum6061-T6, 6063-T6
SpecialtyBrass, Copper, Titanium

Value-Add Services

CNC BendingRobotic WeldingPowder CoatingAssembly

See It in Production

Inside a top stainless steel pipe manufacturer in Vietnam — tube and pipe production from our audited supplier network.

Top Stainless Steel Pipe Manufacturer in Vietnam

Top Stainless Steel Pipe Manufacturer in Vietnam

Watch on YouTube

Tube Laser Cutting Specifications

Standard working envelope and accuracy across our audited tube fabrication network.

ParameterCapability RangeNotes
Round Tube ODUp to 152 mm (6")Cut, notch, cope, and engrave in one setup
Square / Rectangular TubeUp to 100 × 100 mm (4" × 4") / 100 × 75 mm (4" × 3")Open profiles (angle, channel) also supported
Wall Thickness0.9 – 12.7 mm (0.035" – 0.500")Depends on material and profile size
Cut Feature Tolerance±0.127 mm (±0.005")On laser-cut features; bend tolerances quoted per part
MaterialsCarbon steel, stainless steel, aluminum, brass, copper, titaniumA513/A500/DOM, 304/316, 6061/6063 and more
Typical Lead TimePrototypes: 5–10 business days · Production: 2–4 weeksWelded and coated assemblies quoted per BOM

Tube Laser Cutting FAQ

What tube shapes and sizes can you laser cut?
Round tube up to 6" (152mm) OD, square tube up to 4" x 4" (100x100mm), and rectangular tube up to 4" x 3" (100x75mm), with wall thicknesses from 0.035" to 0.500" (0.9–12.7mm). Open profiles like angle and channel can also be processed on most tube lasers.
Do I need hard tooling for tube laser cutting?
No. Tube lasers cut copes, notches, holes, slots, and end profiles directly from your CAD data, so there is no punch or coping die to build or maintain. Tooling is only required if your parts also need mandrel or rotary draw bending, where standard bend dies often already exist for common tube sizes.
Can you bend and weld the tubes as well as cut them?
Yes. Our audited Vietnamese fabricators combine tube laser cutting with CNC mandrel bending, robotic and manual welding, powder coating, and assembly — so tubular frames and weldments ship as finished, inspected components rather than loose cut tubes.
What files do you need for a tube laser quote?
A 3D model (STEP or IGES) is ideal because it captures the tube profile, bend geometry, and all cut features in one file. 2D drawings (PDF/DWG) with a cut list also work. Include material grade, wall thickness, quantity, and any finishing requirements for the fastest turnaround.

Ready to price your tubular components?

Upload your STEP or IGES files for an instant AI-powered DFM check and quote.

Quick Sourcing Inquiry