Skip to main content

🇻🇳 178 profiles · Engineering review

← All Services3D Printing & Additive Manufacturing

3D Printing from Vietnam.
Audited Factories. Real Photos. FTA-Ready.

SLA, SLS, MJF, FDM, and DMLS metal printing — sourced from DEWIN's 50-point Dolphin-audited factory network. Certificate of Origin documentation for 16+ FTA markets. Every factory photographed and verified by our on-ground team.

6 technologies50+ materials50-point Dolphin Audit16+ FTAsCOO documentation
178+
Audited Vietnam Factories
1,700+
Real Factory Photos
50-pt
Dolphin Audit Per Factory
16+
Free Trade Agreements

Why DEWIN is Different for 3D Printing

Online marketplaces match you to anonymous factories. We match you to physically audited, photographed, and scored AM facilities — and we've met the team.

📸

Real Photos of Every Machine

Our team photographs the actual printing machines — make, model, condition — not showroom shots. You see exactly what will produce your parts before you commit.

🔬

50-Point Dolphin Audit

Every 3D printing partner is scored across 5 pillars: Facility, Equipment, Quality Systems, Workforce, and Export Compliance. Only Tier 1 and Tier 2 factories enter production programs.

📜

FTA Documentation Ready

16+ Free Trade Agreements mean Vietnam-origin 3D printed parts qualify for preferential tariff rates in the EU, CPTPP, RCEP, and UK markets. We prepare COO documentation as standard.

Verified Gallery

3D Printing & Additive Manufacturing Shop Floors

On-site photos of industrial FDM and SLA printing systems, inspection equipment, and printed samples verified by our on-ground team.

6 Technologies. All Dolphin-Audited.

From rapid SLA prototypes to DMLS metal production parts. Each technology is available through our verified Vietnam factory network.

SLA (Stereolithography)

Accuracy:±0.05mm
Materials:Standard, Tough, Flexible, High-Temp, Castable resins
Strengths:Best surface finish, fine details, tight tolerances
Ideal for:Visual prototypes, concept models, master patterns
Lead time:1–3 days

🔍 Dolphin audit: Equipment & Capacity pillar: photopolymer resin machine, UV curing station

SLS (Selective Laser Sintering)

Accuracy:±0.1mm
Materials:Nylon PA12, PA11, PA12-GF, TPU
Strengths:Strong functional parts, no support structures, complex geometries
Ideal for:Functional prototypes, end-use parts, snap fits, living hinges
Lead time:2–4 days

🔍 Dolphin audit: Equipment pillar: EOS or Farsoon laser sintering system verified

MJF (Multi Jet Fusion)

Accuracy:±0.1mm
Materials:Nylon PA12, PA12-GF, PA11, TPU
Strengths:Isotropic properties, fine detail, cost-effective at volume
Ideal for:Production parts (100–10,000+), jigs & fixtures, end-use nylon
Lead time:2–4 days

🔍 Dolphin audit: HP Multi Jet Fusion system verified by on-ground team

FDM (Fused Deposition Modeling)

Accuracy:±0.15mm
Materials:ABS, PLA, PETG, Nylon, PC, PEEK, ULTEM, CF-Nylon
Strengths:Large build volume, engineering-grade materials, lowest cost
Ideal for:Large parts, tooling fixtures, low-cost prototypes
Lead time:1–3 days

🔍 Dolphin audit: FDM system + enclosed chamber for engineering materials verified

DMLS (Metal 3D Printing)

Accuracy:±0.05–0.1mm
Materials:SS 316L, 17-4PH, Ti64, AlSi10Mg, Inconel 718, CoCr
Strengths:Complex internal channels, lattice structures, consolidated assemblies
Ideal for:Aerospace brackets, conformal cooling inserts, medical implants
Lead time:5–7 days

🔍 Dolphin audit: EOS M 290 or equivalent LPBF system + powder handling room verified

Metal Binder Jetting

Accuracy:±0.1mm
Materials:Stainless Steel 316L, 17-4PH, tool steels
Strengths:Cost-effective metal production, no support structures, high throughput
Ideal for:Production metal parts (500+), complex geometries at volume
Lead time:7–10 days

🔍 Dolphin audit: Sintering furnace + debinding equipment verified on-site

🐬

The 50-Point Dolphin Audit — Applied to 3D Printing

Our audit framework was designed for traditional manufacturing — but all 5 pillars apply equally to additive manufacturing facilities. Here's what we verify at every 3D printing factory.

🏭

Facility & Safety

What we audit: Factory layout, 5S organization, fire safety, environmental compliance, access control, clean room if required

For 3D printing: For 3D printing: powder storage safety (SLS/DMLS), resin handling safety (SLA), dust management protocols

⚙️

Equipment & Capacity

What we audit: Machine make/model/vintage, maintenance records, calibration certificates, production capacity, spare parts availability

For 3D printing: Critical for 3D printing: machine model determines accuracy limits, build volume, and material compatibility

📋

Quality Systems

What we audit: ISO 9001 status, inspection equipment, dimensional check process, non-conformance management, CAPA records

For 3D printing: Dimensional inspection after printing, CMM/VMM availability for FAI documentation

👥

Workforce & Management

What we audit: Operator training, AM process knowledge, management stability, employee tenure, shift capacity

For 3D printing: Experienced AM operators significantly affect surface quality and dimensional accuracy

📜

Export Compliance

What we audit: Certificate of Origin history, FTA documentation capability, customs classification records, VCCI registration

For 3D printing: Required for $0 Section 301 on US orders, EVFTA 0% on EU orders, CPTPP preferential rates

QCLDM Scoring Tier Reference

TierScore RangeBuyer Implication
Tier 190–100Recommended for precision and production programs. Full documentation capability.
Tier 280–89Good for standard programs with buyer-specified QC overlay. Minor improvement actions noted.
Tier 355–69Prototype or low-risk orders only. Corrective actions required before production.
Probationary<55Not recommended. Factory on improvement plan.

16+ Free Trade Agreements — Why Vietnam Wins for Global Buyers

Vietnam's FTA network means your 3D printed parts ship to the EU, UK, Japan, Australia, and Canada with preferential or zero duty rates — if the COO documentation is in order. DEWIN manages this for every order.

AgreementMarkets CoveredBuyer BenefitStatus
EVFTAEuropean Union (27 countries)0% duty on most industrial goods after stagingIn Force 2020
CPTPPAustralia, Canada, Japan, NZ, Singapore, Mexico, Peru, ChilePreferential rates on qualified goods with Vietnam COOIn Force 2018
RCEPASEAN + China, Japan, Korea, Australia, NZReduced tariffs on most product categoriesIn Force 2022
UKVFTAUnited KingdomPreferential access post-Brexit under UK-Vietnam FTAIn Force 2021
VJEPAJapanDeep tariff reductions on manufactured goodsIn Force 2009
VKFTASouth KoreaPreferential rates across manufacturing sectorsIn Force 2015

FTA data sourced from USTR and WTO databases. Preferential rates depend on Rules of Origin and correct COO documentation. Consult your customs advisor for specific classification.

What Comes With Every 3D Printing Order

We deliver finished parts AND the documentation that makes them usable for production programs, customs entry, and quality records.

📸

Pre-Shipment Photos

On-ground team photographs every batch before it leaves the factory. You see your parts before delivery — no surprises.

📐

Dimensional Inspection Report

Pre-shipment dimensional check on every order. CMM reports available for precision parts requiring GD&T verification and FAI documentation.

📋

Certificate of Origin

VCCI Form B (general), CPTPP Form, EVFTA EUR.1, or RCEP origin certificate — whichever your destination market requires for FTA preferential treatment.

🔬

Material Test Reports

Material certifications with full traceability for metal printed parts (DMLS, binder jetting). Nylon and resin material data sheets for all plastic printing.

DEWIN vs Other 3D Printing Sources

When factory verification and FTA documentation matter, not all sources are equal.

FactorDEWIN VietnamAlibaba / Online MarketplaceTrade Fair Discovery
Factory Verification✅ 50-point Dolphin Audit❌ Self-reported or none⚠️ One-time booth visit only
Equipment Photos✅ Real on-site photos of machines❌ Stock or unverified photos⚠️ Limited trade show samples
COO Documentation✅ Managed for all FTA markets❌ Buyer must manage independently❌ No documentation support
Pre-Shipment Inspection✅ On-ground team⚠️ At extra cost❌ Not included
FTA Coverage✅ 16+ FTAs supported⚠️ Varies by factory❌ Not managed
QCLDM Audit Score✅ Scored 0–100 per factory❌ Not available❌ Not available

Post-Processing & Finishing Options

We deliver finished parts, not raw prints. In-factory post-processing keeps lead times low and quality traceable.

🎨

Dyeing & Painting

Custom colors, RAL/Pantone matching, spray painting

✨

Vapor Smoothing

Chemical smoothing for SLS/MJF — injection-mold-like finish

⚙️

CNC Post-Machining

Machine critical features to tight tolerances after printing

🔩

Metal Finishing

Heat treatment, HIP, anodizing, plating for DMLS parts

3D Printing from Vietnam — FAQ

How does DEWIN vet Vietnam 3D printing factories?
Every factory in our additive manufacturing network goes through the 50-point Dolphin Audit before any orders are placed. Our on-ground team physically visits the facility, photographs equipment (machines, inspection tools, finished goods area), and scores the factory across 5 pillars: Facility & Safety, Equipment & Capacity, Quality Systems, Workforce & Management, and Export Compliance. Only Tier 1 and Tier 2 QCLDM-scored factories are recommended for precision 3D printing programs.
What 3D printing technologies are available from Vietnam?
SLA (stereolithography), SLS (selective laser sintering), MJF (Multi Jet Fusion), FDM, DMLS (direct metal laser sintering), and metal binder jetting. Our network covers both plastic and metal additive manufacturing, from rapid prototypes to production runs of 10,000+ parts.
What FTA advantages does Vietnam provide for 3D printed parts?
Vietnam has 16+ Free Trade Agreements covering the US (via IEEPA/bilateral discussions), EU (EVFTA — 0% duty on most industrial goods after staging), CPTPP countries (Australia, Canada, Japan, NZ, Singapore, etc.), RCEP (ASEAN+China, Japan, Korea, Australia), and UKVFTA. This gives global buyers preferential access that China and India cannot match.
Can Vietnam factories produce both plastic and metal 3D printed parts?
Yes. Our plastic additive network (SLA, SLS, MJF, FDM) includes factories equipped with HP Multi Jet Fusion, EOS SLS systems, and industrial FDM machines. For metal printing (DMLS, binder jetting), we work with specialized metal AM factories with EOS M 290 and similar systems. Both are audited and photographed under the Dolphin framework.
What quality documentation comes with Vietnam 3D printed parts?
Every order includes: dimensional inspection report (pre-shipment), Certificate of Origin (VCCI Form B for most markets, CPTPP/EVFTA certificates for preferential FTA rates), material test reports for metal printed parts, and pre-shipment photos by our on-ground team. For precision programs, CMM reports are available.
How do lead times compare between Vietnam and other sourcing options?
Plastic prints (SLA, SLS, MJF): 1–4 days production, 7–10 days door-to-door internationally. Metal DMLS: 5–7 days production plus shipping. Comparable to China-based bureaus — but without Section 301 tariff risk and with full COO documentation for global FTA compliance.
Is 3D printing from Vietnam suitable for production runs?
Yes, especially with MJF and SLS for nylon parts. HP Multi Jet Fusion produces isotropic PA12 parts with consistent mechanical properties at volumes up to 10,000+ units. Metal binder jetting is cost-effective for stainless steel production. We also use 3D printing for bridge production while injection mold tooling is being built.
How do I browse your 3D printing factory partners?
Visit our Factories page to browse the full network with real photos from our most recent audits. Filter by process to find additive manufacturing specialists. Each factory profile includes equipment list, audit score, certification status, and photo gallery from our on-ground visits.

Ready to Source Verified 3D Printing from Vietnam?

Browse our audited factory network, take a virtual tour, or request a quote. Every factory photographed, scored, and FTA-ready.

Or email us at sourcing [at] dewinvietnam.com

Quick Sourcing Inquiry