Skip to main content

🇻🇳 178 profiles · Engineering review

Sourcing-team snapshot — reviewed with each audit cycle

Factory Capacity Dashboard

Current availability across our network of 178+ audited Vietnam suppliers, assessed by our on-ground team. Verified through our 50-point Dolphin Audit.

Verified Factories

0

Dolphin Audit passed

Audit Compliance

0

On-site verified

Quote Turnaround

0

Hours to confirmed availability

Current Availability

Audited-supplier counts by process, with typical production lead times

From our audited-supplier database
⚙️Open

CNC Machining

32 audited factories

Typical production lead time

5–15 days

Slots available across milling & turning shops

🏭Open

Sheet Metal & Stamping

35 audited factories

Typical production lead time

5–10 days

Laser cutting and press-brake capacity available

🔧Moderate

Injection Molding & Plastics

31 audited factories

Typical production lead time

10–15 days

New tooling adds 15–25 business days to first shipment

🔩Moderate

Casting (Die / Investment / Sand)

27 audited factories

Typical production lead time

10–20 days

New dies add 20–35 business days

How to read this page: factory counts come from our audited-supplier database. Lead-time ranges are the same indicative figures used by our quoting tools; booking outlook is our sourcing team's current assessment from supplier check-ins — not live machine telemetry. We also maintain specialist suppliers for 3D printing, powder metallurgy, forging, surface finishing, and assembly — ask us for current availability in those processes.

Unrivaled Access to Vietnam Manufacturing

  • Pre-Audited Network

    Every factory has passed our 50-point Dolphin Audit ensuring specs are met.

  • Real Photos, Real Audits

    View actual factory floor photos, equipment lists, and quality certifications.

  • On-The-Ground Quality Team

    Local engineers in Vietnam inspect every run before shipment.

Reserve Production Capacity

Top factories fill fast. Lock in your slot with a priority RFQ and get confirmed availability within 24 hours.

Submit Priority RFQ →

Free • No commitment • 24h response

Quick Sourcing Inquiry