Skip to main content

🇻🇳 178 profiles · Engineering review

Case Studies

Real projects. Real results. See how we help companies source manufacturing from Vietnam.

Skid Sprayer Frame
Sheet MetalWeldingSupply Chain Migration

Skid Sprayer Frame

China-to-Vietnam Supply Chain Migration

How we helped a U.S. client relocate Skid Sprayer Frame production from China to Vietnam in just 10 months — with a fully localized supply chain to eliminate tariff risks.

✓ 10-month migration✓ 100% local supply chain✓ No Section 301 tariff exposure
⚙️
CNC Machining
CNC MachiningHydraulicsCost Reduction

Hydraulic Manifold Block

Precision CNC Machining — 35% Cost Reduction

A U.S. hydraulics OEM cut production costs by 35% ($315K/year savings) by qualifying a precision CNC machining partner in Vietnam through our audited factory network.

✓ 35% cost reduction✓ $315K annual savings✓ 0.12% defect rate
⚙️
Die Casting
Die CastingCNC MachiningProcess Optimization

Aluminum Motor Housing

Die Casting Process Conversion — 60% Faster Delivery

Helped an industrial equipment manufacturer switch from sand casting to high-pressure die casting in Vietnam — 28% cost reduction, 60% faster lead times, and rejection rate dropped from 4% to 0.3%.

✓ 28% cost reduction✓ 60% faster delivery✓ 0.3% rejection rate
⚙️
Stamping
StampingMIG WeldingDolphin Audited

OPE Steel Chassis

Stamping & Welding — Dolphin Audited · First Article Approved in 8 Weeks

How our on-ground Vietnam team matched an outdoor power equipment buyer with a Dolphin-audited stamping and welding factory — zero quality rejections after 8 months of production and 42% landed cost reduction vs. China.

✓ 88/100 Dolphin audit score✓ First article approved on first submission✓ 42% landed cost vs China
⚙️
CNC Turning
CNC TurningCNC MillingDolphin AuditedNamed Client

DOMS — Precision CNC Machined Components

Real Client · Dolphin Audited · CMM Inspection · First Article in 5 Weeks

How DEWIN Vietnam matched DOMS (President: Greg L. Wilhite) with an audited CNC machining factory — holding ±0.01 mm tolerances with Mitutoyo CMM inspection, first-article approval in 5 weeks, and approx. 30% landed cost reduction vs. their previous China supplier.

✓ 85/100 Dolphin audit score✓ First article approved in 5 weeks✓ Approx. 30% cost reduction
▶ See the Proof on Film

Real Samples, Real Factories — On Camera

The parts behind these case studies aren't renders. Watch our team walk through real machined and metal part samples produced by our audited Vietnam factory network.

Real Vietnam Factory Samples: Custom Machined & Metal Parts

Real Vietnam Factory Samples: Custom Machined & Metal Parts

Watch on YouTube

More factory footage on our Factory Video Series page and YouTube channel @dewintech.

Explore the Capabilities Behind These Projects

Every case study above maps to a manufacturing service we source from our 178+ audited Vietnam factories.

Have a Similar Project?

Tell us about your requirements and we'll show you how Vietnam manufacturing can work for you.

Get a Quote

Quick Sourcing Inquiry