Skip to main content

🇻🇳 178 profiles · Engineering review

← All ServicesForging

Forging from Vietnam.
Real Factories. Real Presses. Real Audits.

Hot forging, cold forging, ring rolling, and open-die forging from our network of 178+ audited Vietnam factories. Steel, aluminum, titanium, and stainless. Every factory physically inspected and scored under our 50-point Dolphin audit system.

Tooling from $2K · Parts from $0.40 ea · ISO 9001 + IATF 16949 · 1,700+ real factory photos

Verified Gallery

Forging & Casting Partner Facilities

Real photographs from audited casting and forging metalworking factories in our Vietnam network, documented on-site by our audit team.

178+
Audited Vietnam Factories
1,700+
Real Factory Photos
50-pt
Dolphin Audit Score
16+
FTAs Covering Vietnam
Why Vietnam Forging

Vietnam's Forging Sector: Built on Automotive Quality Standards

Vietnam's forging industry grew alongside Honda, Toyota, and Yamaha production in the country. The Tier 1 automotive supply chain demanded — and got — Japanese-standard quality systems, documented processes, and measurable output quality. That infrastructure is now accessible to global buyers sourcing through Dewin.

✓
Automotive Tier 1 Heritage
Many of our forging factories have supplied Honda Vietnam, Toyota Vietnam, and Yamaha Motor since the 2000s. The quality systems were built to OEM standards.
✓
Modern Equipment
Vietnam forging operations use the same Schuler, SMS Meer, and Kurimoto equipment as Chinese and Korean competitors — at 20–30% lower operating costs.
✓
On-Ground Team
Our team physically audits and photographs every factory before we recommend them. You see real press floors, die storage, heat treat furnaces, and inspection equipment.
✓
Full Traceability
Mill certs, heat treat logs, CMM reports, and NDT records supplied with every order. Every part traceable back to the original material heat.

Vietnam vs Unverified Forging Supplier

Factory physically audited
✅ 50-point Dolphin score
❌ No site visit
Real factory photos
✅ 1,700+ available
❌ Stock photos only
Heat treat certification
✅ Furnace calibration certs
⚠️ Self-reported
Press capacity documented
✅ Full tonnage list
⚠️ Verbal claims
ISO/IATF certification
✅ Verified & current
⚠️ PDF only, unverified
NDT capability
✅ UT / MP / PT documented
❌ Unknown
Material traceability
✅ Mill certs on every heat
⚠️ Often missing
First article support
✅ FAI/PPAP assistance
❌ Customer responsibility
Learn About the Dolphin Audit →

See It in Production

Real sample parts from Vietnamese factories in our network — custom machined and metal components, including forged and heat-treated parts, filmed by our on-ground team.

Real Vietnam Factory Samples — Custom Machined & Metal Parts

Real Vietnam Factory Samples — Custom Machined & Metal Parts

Watch on YouTube

Forging Processes Available in Vietnam

Our 178+ factory network covers every major forging process. We match your part geometry, alloy, and volume to the right factory.

🔥

Hot Closed-Die Forging

Press Range
500T–5,000T
Tolerance
±0.5–1.5mm as-forged
Part Weight
0.1–50 kg
Best Applications
Gears, flanges, structural brackets, powertrain parts, suspension components
❄️

Cold Forging

Press Range
100T–800T
Tolerance
±0.05–0.15mm
Part Weight
0.01–3 kg
Best Applications
High-volume pins, shafts, fasteners, gear blanks, ball studs — often eliminates post-machining
🌡️

Warm Forging

Press Range
300T–2,000T
Tolerance
±0.2–0.6mm
Part Weight
0.5–20 kg
Best Applications
Medium-alloy steels requiring better tolerances than hot forging with easier forming than cold
⚒️

Open-Die Forging

Press Range
Hydraulic 500T–5,000T
Tolerance
±2–5mm (finish machine)
Part Weight
Up to 500 kg
Best Applications
Large shafts, ingots, rough blanks, rings before machining
⭕

Ring Rolling

Press Range
Ring rolling mill
Tolerance
±1–3mm as-rolled
Part Weight
1–500 kg
Best Applications
Rings, flanges, bearing races, pressure vessel components — continuous circumferential grain flow
Our Quality System

The 50-Point Dolphin Audit for Forging Factories

Before we recommend any forging factory, our on-ground team conducts a full 50-point audit. Here's what we score across 5 pillars:

1

Quality Management

ISO/IATF cert status, press monitoring systems, SPC, AQL inspection records, heat treat calibration certificates, dimensional gauge R&R

2

Equipment & Capacity

Full press tonnage inventory, stroke rate specs, induction/gas furnace calibration, die storage conditions, material handling

3

Tooling Capability

Die design capability (in-house vs outsourced), die steel specification, maintenance logs, tool life tracking per die set

4

Labor & HSE Compliance

Press operator certifications, heat treat operator qualifications, PPE compliance, safety record, labor contract compliance

5

Financial Stability

Business registration, years in operation, key customer references, on-time delivery history, financial health indicators

Your Benefit

You see everything before you order.

Full audit score, factory photos, press list, certification copies, and heat treat furnace calibration records — all delivered before you decide to place tooling.

Full Dolphin Audit Explainer →

Materials Available in Our Forging Network

Full material traceability with mill certs on every production heat. Spec compliance verified during incoming inspection.

Carbon Steel

AISI 1018, 1045, 1060, 1080

Most common. Excellent toughness, good machinability, easy HT.

Alloy Steel

4140, 4340, 8620, H13, D2

High strength, hardenable. Standard for gears, shafts, and powertrain.

Stainless Steel

304, 316, 17-4PH, 15-5PH, 410

Corrosion resistant. PH grades for aerospace and medical parts.

Aluminum

2024-T4, 6061-T6, 7075-T6

Lightweight structural. Aerospace and automotive applications.

Titanium

Grade 2, Grade 5 (Ti-6Al-4V), Grade 23

Highest strength-to-weight. Aerospace, medical, marine.

Copper / Brass

C11000, C36000, C46400 Naval Brass

Electrical, fluid handling, marine applications.

Post-Forging Operations — In-House at Vietnam Factories

Many of our forging partners handle secondary operations in-house — fewer handoffs, tighter lead times, and single-supplier accountability.

🌡️
Heat Treatment
Annealing, normalizing, Q&T, case/induction hardening, stress relief
🔩
CNC Machining
Drilling, milling, turning, grinding on critical dimensional features
🔍
NDT Inspection
Ultrasonic testing (UT), magnetic particle (MP), dye penetrant (PT)
💨
Shot Blasting
Scale removal, surface prep for painting or plating post-forging
🎨
Surface Coating
Zinc plating, phosphate, e-coat, powder coat, black oxide, painting
📐
CMM Inspection
Full dimensional report, GD&T verification, FAI/PPAP documentation
📦
Sub-Assembly
Insert pressing, bushing installation, hardware fitting, kit packing
🚢
Export Documentation
CO, mill certs, HTS code prep, packing list for smooth customs clearance

Industries Our Forging Network Serves

Our Vietnam forging factories supply parts to global buyers in automotive, industrial, agriculture, and more — with the audit documentation to support OEM qualification.

Automotive & Powertrain

Crankshafts, connecting rods, camshafts, gear blanks, pinion shafts, CV joint housings, knuckles

Agricultural Equipment

PTO shafts, tine brackets, clevis pins, hitch hooks, toolbar clamps, gearbox housings

Industrial Machinery

Eccentric shafts, cam discs, coupling flanges, press frames, roller journals, link arms

Hydraulics & Fluid Power

Valve bodies, cylinder end caps, flange adapters, pump bodies, manifold pre-forms

Structural & Construction

Rigging hardware, lifting hooks, structural brackets, clevis assemblies, turnbuckles

Marine & Defense

Titanium fasteners, stainless fittings, propeller shaft components, anchor chain hardware

How DEWIN Sources Your Forgings

From drawing review to delivery — we manage the full sourcing process so you don't have to.

01

Submit Drawings

Send 2D/3D drawings with material, heat treat requirement, and quantity. We review for forgeability and flag DFM issues within 24h.

02

Factory Match

We match your part to the best-fit factory from our audited network — by process, alloy, press tonnage, and certification level.

03

Dolphin Audit Review

You receive the factory's full Dolphin audit score, photos, press list, and certifications before tooling approval.

04

Production + QC Report

We monitor production, witness first article inspection, and send you a full quality report (dimensional, heat treat, NDT) with every shipment.

Source Forgings from Vietnam's Best Factories

Send us your drawings. We'll match the right factory from our audited network, review for DFM issues, and return a full quote — including factory audit score, tooling cost, piece price, and lead time — within 24 hours.

No commitment. Factory audit included. Free DFM review.

Forging FAQ

Which Vietnam factories does DEWIN work with for forging?

Our forging network spans factories in Hanoi, Haiphong, Binh Duong, Dong Nai, and Ho Chi Minh City — covering hot closed-die forging (500T–5,000T presses), cold forging, warm forging, ring rolling, and open-die operations. Every factory has been physically visited, audited, and photographed by our on-ground team under the 50-point Dolphin scoring system.

What forging processes are available in Vietnam?

Hot forging (open-die and closed-die), cold forging, warm forging, impression die forging, ring rolling (up to 500kg), drop forging for high volumes, and isothermal forging for titanium and nickel alloys. Many factories include in-house heat treatment, CNC finishing, and NDT inspection.

What materials can Vietnam forging factories process?

Carbon steels (1018, 1045, 1060, 1080), alloy steels (4140, 4340, 8620, H13, D2), stainless steels (304, 316, 17-4PH, 15-5PH, 410), aluminum alloys (2024-T4, 6061-T6, 7075-T6), titanium (Grade 2, Grade 5/Ti-6Al-4V), copper alloys, and nickel superalloys. Full material traceability with mill certs provided.

How does the 50-point Dolphin audit work for forging factories?

Our Dolphin audit for forging factories scores 50 checkpoints across 5 pillars: Quality Management (ISO status, press calibration records, heat treat furnace calibration, dimensional inspection process), Equipment & Capacity (press tonnage list, die storage, induction heating equipment), Tooling (die design capability, maintenance records, tool life tracking), Labor & HSE Compliance, and Financial Stability. You receive the full audit score, factory photos, equipment list, and certifications before your first order.

What certifications do Vietnam forging factories hold?

ISO 9001:2015 is standard across our forging network. Automotive-focused forging factories also hold IATF 16949. Factories supplying Honda, Toyota, and Yamaha Tier 1 programs operate to Japanese OEM quality standards. Specific certifications are detailed in each factory's Dolphin audit profile.

What are typical lead times and MOQs?

New die development: 4–8 weeks. First article inspection: 2–4 weeks after die approval. Production runs: 3–6 weeks. MOQ: 200–500 pieces for new closed-die projects. Open-die and ring rolling: no practical MOQ. Tooling cost: $2,000–$40,000 depending on die complexity and process.

Can I see photos of the forging factories before committing?

Yes — that's exactly what we offer. Our on-ground team has photographed and video-toured every factory in our network. You'll see the actual press floor, die storage area, heat treatment furnaces, inspection equipment, and finished parts. These aren't stock photos — they're real images from our most recent factory visits.

Do Vietnam forging factories offer post-forging operations?

Most of our forging partners include in-house heat treatment (annealing, quenching & tempering, case hardening), CNC machining for critical features, shot blasting, and basic NDT. We coordinate third-party NDT labs (UT, magnetic particle, dye penetrant) and surface coating (zinc plating, powder coat, phosphate) when not available in-house.

Quick Sourcing Inquiry