Skip to main content

🇻🇳 178 profiles · Engineering review

🇻🇳 Vietnam: #1 China Plus One Destination

Vietnam Is the Factory Hub
Your Supply Chain Needs

Global buyers are shifting production to Vietnam — and for good reason. $0 Section 301 tariffs. 16+ Free Trade Agreements. 178+ audited factories with real photos and 50-point quality scores. This is what China Plus One looks like when it's actually verified.

🏭
178+
Audited Vietnam Factories
📸
1,700+
Real Factory Photos
✅
50-Point
Dolphin Audit per Factory
🤝
16+
Free Trade Agreements
Why Vietnam Wins

Vietnam's Manufacturing Advantage

$0 Section 301 Tariff

✅ USTR Verified

Vietnam-origin goods are completely exempt from China's Section 301 tariffs. What costs $125+ landed from China costs significantly less from Vietnam — that difference goes straight to your margin.

16+ Active Free Trade Agreements

✅ CPTPP · EVFTA · RCEP

Vietnam's FTA network gives preferential market access to the EU, Japan, South Korea, Australia, Canada, and more — not just the US. For global buyers, Vietnam is one of the most trade-connected manufacturing countries in Asia.

Deep Industrial Manufacturing Base

✅ 50+ Processes Available

Vietnam's factories have matured well beyond garments and electronics assembly. Today's Vietnam can do precision CNC machining, aluminum die casting, complex weldments, injection molding, and electronics manufacturing to international standards.

Est. 30–50% Lower Landed Cost

✅ Defensible Range

When you account for competitive factory pricing plus eliminated Section 301 tariffs, Vietnam regularly delivers 30–50% lower total landed costs vs. equivalent China production.

The Dewin Difference

Not a Marketplace. A Verified Network.

Any platform can give you a list of factories. We've physically visited, photographed, and 50-point audited every factory in our network. You see real production floors, real equipment, and a real quality score — before you commit a single dollar.

📸 What You Get with Every Factory

  • ✓Production floor photos (avg 10+ per factory)
  • ✓Key equipment list with age and model
  • ✓50-point Dolphin audit score
  • ✓Process capability declaration
  • ✓Certifications on file (ISO/IATF/etc.)
  • ✓Monthly capacity and current utilization
  • ✓English-speaking contact person
Learn about the Dolphin Audit →
Factory Network

What Our 178+ Factories Can Build

Every factory is audited, photo-documented, and matched to the right process category. Real factories — not a database of unverified listings.

⚙️

CNC Machining

40+audited factories
✓ISO 9001

Precision to ±0.01mm, 5-axis available

🔥

Die Casting

25+audited factories
✓IATF 16949

Aluminum & zinc, 50T–2,500T presses

🔩

Sheet Metal

30+audited factories
✓ISO 9001

Laser cutting, CNC bending, welding

🏭

Injection Molding

20+audited factories
✓ISO 9001

Thermoplastics & engineering resins

🔨

Stamping

15+audited factories
✓IATF 16949

Progressive die, deep draw, compound

📏

Aluminum Extrusion

12+audited factories
✓ISO 9001

Custom profiles + secondary machining

🔧

Assembly

35+audited factories
✓ISO 9001

Mechanical, electronic, sub-assembly

💡

Electronics Mfg

18+audited factories
✓IPC-A-610

PCB, SMT, wire harness, testing

See It Yourself

Inside Vietnam's Technology Manufacturing Plants

Don't take "Vietnam has matured" on faith — watch what modern Vietnamese manufacturing actually looks like, then browse the real photos our team took on-site.

Technology manufacturing plants in Vietnam

Technology manufacturing plants in Vietnam

Watch on YouTube

CNC lathe at an audited Vietnam factory
Aluminum die casting machine at an audited Vietnam factory
Laser cutting machine at an audited Vietnam factory
3D CMM inspection equipment at an audited Vietnam factory
Trade Advantage

Vietnam's 16+ Free Trade Agreements

Vietnam's FTA network is one of the most comprehensive in Southeast Asia — giving your supply chain preferential access to virtually every major market.

CPTPP

Japan, Canada, Australia, NZ, Chile, Peru, Brunei, Malaysia, Mexico, Singapore

Reduced/zero tariffs on industrial goods

EVFTA

European Union (27 countries)

Up to 99% tariff elimination on EU imports

RCEP

China, Japan, S. Korea, ASEAN, Australia, NZ

Largest trade bloc by GDP — deep regional integration

UKVFTA

United Kingdom

Post-Brexit bilateral trade agreement

VJEPA

Japan

Deep manufacturing supply chain integration

VKFTA

South Korea

Electronics and industrial components focus

Vietnam is party to 16+ FTAs covering 60+ countries and the majority of global manufactured goods trade. Source from Vietnam data: WTO Regional Trade Agreements Database + MOIT Vietnam.

Quality Assurance

The 50-Point Dolphin Audit

Every factory in our China Plus One network is evaluated across 5 pillars — 10 points each. No factory joins without passing.

📋

Quality Management

10 points
  • •ISO certification status
  • •QC procedures and documentation
  • •Defect rate history
  • •Corrective action process
  • •IQC/IPQC/OQC systems
🏗️

Equipment Capability

10 points
  • •Machine inventory & age
  • •Precision capability
  • •Calibration records
  • •5-axis / advanced capability
  • •Maintenance program
📊

Production Capacity

10 points
  • •Current utilization rate
  • •Max monthly capacity
  • •Lead time commitments
  • •Overtime capability
  • •Sub-supplier dependency
🏆

Compliance & Certifications

10 points
  • •ISO/IATF/AS9100 status
  • •RoHS/REACH compliance
  • •Customs compliance
  • •Export documentation
  • •PPAP capability
🤝

Team & Communication

10 points
  • •English proficiency
  • •Response time benchmark
  • •Technical engineering team
  • •Customer service history
  • •Key person risk

What the Score Means

45–50Tier 1 — Preferred Partner
38–44Tier 2 — Qualified Supplier
30–37Tier 3 — Conditional (improvement plan)
<30Not admitted to network
Read the full audit methodology →

China Plus One — FAQ for Global Buyers

Answers to the questions buyers ask when considering Vietnam as their C+1 destination.

Why is Vietnam the best China Plus One manufacturing destination?
Vietnam offers a unique combination: $0 Section 301 tariffs, 16+ Free Trade Agreements, competitive factory pricing, a skilled and growing industrial workforce, and deep manufacturing experience across CNC machining, die casting, sheet metal, injection molding, electronics assembly, and more. Dewin's network of 178+ audited factories means buyers don't have to start from scratch.
What manufacturing processes are available in Vietnam?
Vietnam's manufacturing base covers 50+ processes: CNC machining, sheet metal fabrication, die casting (aluminum, zinc), injection molding, stamping, aluminum extrusion, investment casting, welding & weldments, electronics assembly, PCB manufacturing, textiles, furniture, and more. Dewin's 178+ audited factories collectively cover all major industrial manufacturing categories.
How does Dewin audit Vietnam factories?
Every factory in Dewin's network is evaluated using a 50-point Dolphin audit covering: quality management system, equipment capability and age, production capacity and utilization, compliance and certifications, and communication/management quality. Audits include physical site visits, equipment photography, and team interviews. Results are scored and tracked over time.
What Free Trade Agreements cover Vietnam exports?
Vietnam is party to 16+ Free Trade Agreements including CPTPP (covering Japan, Canada, Australia, New Zealand), EVFTA (EU-Vietnam FTA), RCEP (Regional Comprehensive Economic Partnership), bilateral FTAs with the US, Japan, South Korea, and more. This gives Vietnam-origin goods preferential tariff rates in most major global markets.
How long does it take to qualify a new Vietnam factory?
Using Dewin's pre-audited factory network, qualification time is significantly reduced. Initial factory match: 1–3 days. RFQ and quote: 3–7 days. T1 sample: 2–4 weeks depending on process complexity. First production run: typically 4–8 weeks after sample approval. Total from first contact to production: approximately 2–4 months for most industrial parts.
What US tariffs apply to Vietnam-origin goods vs China-origin goods?
Vietnam-origin goods carry $0 Section 301 tariff, while many China-origin manufactured goods are subject to 25% Section 301 tariffs. To qualify as Vietnam-origin, parts must undergo substantial transformation in Vietnam — Dewin's Pillar 5 export compliance audit verifies each factory's genuine manufacturing and Certificate of Origin capability, protecting buyers from transshipment risk.
Who manages quality and delivery on the ground in Vietnam?
Dewin's own on-ground team, based in Ho Chi Minh City, Binh Duong, and Hanoi, performs factory audits, in-process QC, and pre-shipment inspections in person. Commercially, buyers contract with Dewin's US-registered Delaware LLC, and orders can ship DDP (Delivered Duty Paid) — one accountable party from purchase order to your dock.

Ready to Meet Your Vietnam Factories?

Every factory in our network has been visited, photographed, and scored. Browse the real factories, see the real audit scores, and request a factory tour — no anonymous marketplace, no surprises.

Real factories. Real audits. Real photos. No anonymous network.

Quick Sourcing Inquiry