Skip to main content

🇻🇳 178 profiles · Engineering review

← All ServicesAssembly & Weldment Services

Turnkey Assembly from
Audited Vietnam Factories.

From sub-assemblies to fully packaged products — sourced from our network of 178+ verified factories. Mechanical, welded, and electromechanical assembly. Every factory has passed our 50-point Dolphin audit. Every shipment is inspected on the ground.

Real factory photos · 50-point audit certification · On-ground inspection team · Request a factory tour

Verified Gallery

Assembly & Sub-Assembly Lines

Real photos of assembly benches, production lines, and packing areas at audited factories in our network.

178+
Audited Factories
50-Point
Dolphin Audit Per Factory
1,700+
Real Factory Photos
On-Ground
Inspection Team in Vietnam

Why Our Assembly Network Is Different

Most sourcing platforms broker to anonymous factories. We show you exactly which factory builds your parts — with real photos, real audit scores, and a team on the ground.

🏭

Named, Audited Factories

You see the actual factory — its equipment, certifications, layout, and audit score — before you commit. No black-box sourcing.

📸

1,700+ Real Photos

Our team photographs every factory floor, assembly station, and QC area. You know exactly what you're buying before the first order.

🔍

In-Person Pre-Ship Inspection

Our Vietnam-based quality team inspects every production run at the factory before it ships. Not a third-party agency — our own people.

See It in Production

Step inside a real Vietnamese factory with our local sourcing team — the on-ground crew that audits assembly lines and inspects every production run.

Step inside a real Vietnamese factory with our local sourcing team

Step inside a real Vietnamese factory with our local sourcing team

Watch on YouTube

Assembly Capabilities

🔩 Mechanical Assembly

  • ✓ Bolting, riveting, and fastening with torque control
  • ✓ Press-fit and interference-fit operations
  • ✓ Bearing and seal installation
  • ✓ Adhesive bonding (structural, threadlocking)
  • ✓ Hydraulic and pneumatic system assembly

⚡ Welded Assemblies

  • ✓ MIG/MAG, TIG, robotic, and laser welding
  • ✓ Structural frames: steel, stainless, aluminum
  • ✓ Custom welding jigs and fixtures per part
  • ✓ AWS D1.1 / ISO 3834 certified welders
  • ✓ Post-weld NDT: VT, PT, MT, UT, RT

🔌 Electromechanical Assembly

  • ✓ Motor and actuator integration
  • ✓ Wiring harness fabrication and installation
  • ✓ Sensor, switch, and encoder mounting
  • ✓ Control panel assembly
  • ✓ Functional and electrical testing (continuity, hi-pot)

📦 Box Builds & Final Products

  • ✓ Full enclosure assembly with electronics
  • ✓ PCB and control system integration
  • ✓ Labeling, engraving, serial number tracking
  • ✓ Retail-ready or industrial export packaging
  • ✓ Drop-ship to buyer or their end customers
Dolphin Audit System

We Audit Every Assembly Factory. You See the Score.

Before any factory joins our assembly network, our team runs a 50-point Dolphin audit — scoring equipment capability, quality systems, process documentation, workforce skill, and compliance records.

For assembly specifically, we evaluate: fixture quality, torque tooling calibration, work instruction maturity, traceability systems, test rig capabilities, and first-article processes.

Learn about the Dolphin Audit →
50
Audit points checked
178+
Factories in network
On-Site
Team conducts audits in person
Shared
Audit reports visible to buyers

One Network, Every Component

Our assembly factories draw on the full DEWIN Vietnam network — castings, machined parts, stampings, and weldments all sourced from verified factories and delivered to one assembly point.

⚙️

CNC Machined Parts

40+ machining factories for precision components

🏗️

Castings & Forgings

28+ die casting and investment casting suppliers

🔩

Sheet Metal & Stampings

35+ fabrication factories for brackets and enclosures

🧩

Plastic Components

32+ injection molding factories for plastic parts

How Assembly Sourcing Works

1

Share BOM & Drawings

Upload your bill of materials, assembly drawings, and quality requirements.

2

Factory Match + Quote

We match to the best-fit audited factory and return a transparent component-level quote.

3

Pilot Run

10–50 unit pilot with full first article inspection report and photos before production.

4

Production + Inspection

Our ground team conducts in-process and pre-ship inspection at the factory.

5

Ship to Your Door

DDP or FOB delivery with full documentation: CoC, test reports, inspection photos.

Assembly Applications

🚜

Agriculture & OPE

Welded frames, hydraulic assemblies, sprayer components, mower decks, control panels

⚙️

Industrial Machinery

Pump assemblies, gearbox housings, manifold blocks, conveyor components, motor mounts

🚗

Automotive

Bracket assemblies, wiring harnesses, suspension sub-assemblies, exhaust systems

🏥

Medical Devices

Clean-room assembly, instrument sub-assemblies, device enclosures, sterile packaging

Assembly FAQ

What assembly types do your Vietnam factories offer?
Mechanical assembly (bolting, pressing, fastening with torque verification), welded assemblies (TIG, MIG, robotic, laser), electromechanical assembly (motor integration, wiring harnesses, sensor installation), box builds (full enclosure assembly with PCBs and electronics), and final product assembly with custom packaging and labeling.
How do you verify factory assembly capabilities?
Every factory passes our 50-point Dolphin audit before entering the network. Assembly factories are scored on equipment (fixture quality, torque tooling, test rigs), quality systems (work instructions, inspection procedures, traceability), certifications (ISO 9001, IATF 16949 where applicable), and our team's on-site process observations. We publish audit scores so buyers can compare.
Can factories handle full BOM procurement?
Yes. Assembly factories in our network can source and manage the full bill of materials — castings, machined parts, stampings, fasteners, bearings, seals, motors, wiring, and packaging. Many components come from other factories in our 178+ network, creating an integrated Vietnam supply chain.
What quality controls are standard for assembly?
Photo-based work instructions at every station, torque verification on all fasteners, go/no-go gauges for critical fits, electrical testing (continuity, hi-pot, functional) for electromechanical builds, leak testing (pneumatic or hydrostatic) where applicable, final inspection with photo documentation, and full component traceability.
What volumes can assembly factories handle?
Our network covers low-volume pilot runs (10–50 units) through mid- and high-volume production (500–100,000+ units/year). Larger factories offer dedicated assembly lines with custom fixtures and semi-automated workstations for repeatability at scale.
Do you offer weldment assembly specifically?
Yes — many factories specialize in weldment assemblies: structural frames, machine bases, hydraulic manifold bodies, pipe assemblies, and welded enclosures. AWS D1.1 and ISO 3834 certified welders. Robotic cells available for repeatable production runs. Full NDE inspection capability.
What's the typical lead time for an assembled product?
First article (pilot run): 4–8 weeks from drawings approval. Production orders: 3–6 weeks depending on BOM complexity, component lead times, and finishing requirements. For repeat orders, our factories maintain safety stock on long-lead items to compress lead times.
Can I visit the assembly factory before committing?
Yes. We strongly encourage factory visits for complex assembly programs. Our team can arrange guided tours with translation at any factory in our network. For remote buyers, we provide video walkthroughs and live video calls with factory engineers — using our existing 659+ factory videos as context.

Ready to Source Assembly from Verified Vietnam Factories?

Share your BOM and drawings. We'll match you with the right audited factory, provide a transparent quote, and arrange a factory visit — virtual or in person.

Or email your BOM to sourcing [at] dewinvietnam.com

Quick Sourcing Inquiry