Skip to main content

🇻🇳 178 profiles · Engineering review

Production floor at an audited DEWIN partner factory in Vietnam
← All ServicesAluminum Extrusion

Custom Aluminum Extrusion from Vietnam's Audited Factories

6000 & 7000 series alloys · 600T–7,500T presses · Full in-house finishing · 50-point Dolphin audit on every factory

178+ verified Vietnam suppliers · Real photos · Real audit reports · No mystery factories

Get a Free Quote in 24h →

178+

Audited Vietnam Factories

50-pt

Dolphin Audit per Supplier

1,700+

Real Factory Photos

16+

FTAs Covering Vietnam

Verified Gallery

Aluminum Extrusion Production Lines

Real photos from an audited aluminum extrusion factory in Vietnam — billet stock, press line, surface treatment, and sample profiles.

Why Source Aluminum Extrusions from Vietnam?

Vietnam's aluminum extrusion industry has grown rapidly over the past decade — driven by investment in modern press technology, integrated anodizing and powder coating lines, and a manufacturing workforce skilled in complex profile design. What was once a niche capability has matured into a full-service extrusion ecosystem covering profiles from simple angles and channels to complex multi-void hollow sections.

For global buyers, Vietnam offers a compelling combination: lower ex-factory costs than China, proximity to Southeast Asian assembly hubs, coverage under 16+ Free Trade Agreements including CPTPP, RCEP, and the EVFTA, and — critically for US buyers — $0 Section 301 tariff exposure. Chinese aluminum extrusions face 25% Section 301 tariffs plus anti-dumping duties as high as 374%.

The challenge has always been factory verification. DEWIN solves that. We've physically visited and audited every extrusion factory in our network under the 50-point Dolphin framework — verifying press capacity, die shop capability, material traceability, surface finishing quality, and QC documentation. You see real photos, real audit scores, and real capabilities before you commit.

Vietnam Aluminum Extrusion: Indicative Pricing

Indicative pricing from our audited extrusion network. Prices include extrusion, cutting to length, and standard surface finish at stated quantities.

Profile ExampleChina Ex-FactoryVietnam (DEWIN)Vietnam vs China
T-slot frame profile (6063-T5, 1,000kg)$2.90–3.60/kg$2.80–3.40/kg~10–15% lower
Heatsink profile (6061-T6, 500kg)$3.40–4.50/kg$3.20–4.20/kg~10–15% lower
Window frame profile (6063-T5, anodized, 2,000kg)$3.10–3.90/kg$2.90–3.60/kg~10–15% lower
Structural channel (6082-T6, 3,000kg)$2.70–3.40/kg$2.60–3.20/kg~10–15% lower

Prices are per-kg at listed quantities, excluding die costs. US buyers also benefit from $0 Section 301 tariff vs 25%+ on Chinese-origin extrusions. Request an exact quote for your profile.

Extrusion Capabilities

📐 Solid Profiles

  • ✓ Bars, rods, angles, channels, T-sections, Z-sections
  • ✓ Custom cross-sections up to 350mm CCD
  • ✓ Minimum wall thickness: 0.8mm (6063)
  • ✓ Die cost: $300–$800 · Die lead time: 5–10 days

🔩 Hollow & Semi-Hollow

  • ✓ Tubes, rectangular sections, multi-void profiles
  • ✓ Porthole die technology for complex hollows
  • ✓ Minimum wall thickness: 1.0mm (6063)
  • ✓ Die cost: $800–$3,000+ · Die lead time: 10–15 days

🎨 Surface Finishing

  • ✓ Anodizing: clear, black, bronze, champagne, custom (5–25µm)
  • ✓ Powder coating: any RAL color, wood grain, textured
  • ✓ PVDF coating for architectural exteriors
  • ✓ Polishing, brushing, sandblasting, electrophoresis

⚙️ Secondary Fabrication

  • ✓ CNC machining: milling, drilling, tapping, countersinking
  • ✓ Sawing to length (±0.5mm std, ±0.1mm precision)
  • ✓ Bending: stretch, roll, and press bending
  • ✓ Welding (TIG/MIG), punching, thermal break insertion

Extrusion Alloys Available

Most Popular

6063 — General Purpose

Excellent extrudability, good surface quality. Ideal for architectural, decorative, and general-purpose profiles.

T5, T6 · UTS 215–245 MPa

Structural

6061 — Workhorse Alloy

Higher strength, excellent corrosion resistance, good machinability. Ideal for structural and mechanical applications.

T4, T6, T651 · UTS 290–310 MPa

High Strength

6082 — Transport & Structure

Highest strength in the 6000 series. Used in bridges, cranes, and transport structures.

T4, T6 · UTS 310–340 MPa

Rail & Transport

6005A — Rail Bodies

Good extrudability with higher strength than 6063. Rail cars, truck frames, transport containers.

T1, T5, T6 · UTS 260–290 MPa

Aerospace

7075 — Ultra High Strength

Max strength-to-weight. Limited extrudability, available for simple solid profiles where critical strength is needed.

T6, T651, T73 · UTS 510–570 MPa

Sporting Goods

7005 — Frames & Equipment

Better extrudability than 7075 with good strength. Bicycle frames, sports gear, lightweight structures.

T5, T6, T53 · UTS 350–395 MPa

What the 50-Point Dolphin Audit Checks for Extrusion

Every extrusion factory in our network has been physically audited by our on-the-ground team in Vietnam. Here's what the Dolphin framework verifies specifically for aluminum extrusion:

🏭 Pillar 1 — Factory Infrastructure

  • • Press tonnage capacity (600T–7,500T range)
  • • In-house die shop vs outsourced
  • • Billet storage and handling procedures
  • • Aging oven and quench tank availability

⚙️ Pillar 2 — Process Control

  • • Extrusion speed and temperature logging
  • • Quench methodology (water vs air quench)
  • • Die cleaning and maintenance schedule
  • • Temper treatment documentation

📋 Pillar 3 — Materials & Traceability

  • • Billet CoA verification per heat lot
  • • Alloy composition confirmation (XRF)
  • • Batch number traceability to finished goods
  • • Mill certificate documentation (EN 10204 3.1)

🔍 Pillar 4 — Quality Systems

  • • Dimensional inspection tools and CMM
  • • Anodize/coating thickness measurement
  • • Defect identification and rejection logs
  • • PPAP and FAI capability

Industries Our Extrusion Factories Serve

🏗️

Construction & Architecture

Curtain walls, window frames, door systems, railing, structural framing, cladding profiles

💡

LED & Electronics

Heatsinks, LED strip channels, electronic enclosures, PCB card guides, chassis rails

⚙️

Industrial & Automation

T-slot framing, conveyor rails, pneumatic cylinders, linear motion guides, machine guarding

🚗

Automotive & Transport

Roof rails, crash structures, battery trays, trim profiles, trailer frames, bus body sections

How DEWIN Handles Your Extrusion Order

1

Share Your Profile Drawing

Send us your 2D cross-section (DWG/DXF/PDF) with alloy, temper, tolerances, and finish requirements. Our engineers review for extrudability and suggest DFM improvements.

2

Factory Match from Our Audited Network

We match your profile to the right factory based on press tonnage, profile complexity, finish type, and volume. You see the factory profile, photos, and Dolphin audit score before approval.

3

Die Design, Trial Extrusion, and Approval

Die manufactured in 5–15 days. Trial extrusion samples sent with dimensional inspection report and billet CoA. You approve before mass production begins.

4

Production, Inspection, and Shipment

Full production run with in-process QC. Pre-shipment inspection by our on-ground team. Material certs, packing list, and inspection report shipped with goods. DDP delivery available to your door.

Related Guides

Ready to Source Aluminum Extrusions from Vietnam?

Send us your profile drawing and get a detailed quote for die, extrusion, and finishing from our audited factory network. Free DFM review included.

Request a Free Quote →

Or browse our 178+ audited supplier network · Take a virtual factory tour

Aluminum Extrusion FAQ

What aluminum alloys do your Vietnam extrusion factories work with?
Our audited extrusion factories work with 6000 series (6061, 6063, 6082, 6005A) and 7000 series (7075, 7005) alloys. 6063-T5 is the most popular for architectural and general-purpose profiles. 6061-T6 for structural applications. Each factory in our network is pre-audited under the 50-point Dolphin framework including material verification and alloy certification.
What profile sizes and complexity can Vietnam factories extrude?
Our Vietnam extrusion partners have presses ranging from 600T to 7,500T. Circumscribing circle diameter (CCD) from 10mm up to 350mm. Wall thickness minimum 0.8mm (6063) to 1.2mm (6061). Maximum length 12m. Complex hollow and porthole profiles, multi-void sections, and semi-hollow geometries are all within capability.
What certifications do your aluminum extrusion factories hold?
Factories in our extrusion network hold ISO 9001:2015 quality management certifications as a minimum. Select suppliers hold IATF 16949 for automotive-grade extrusions. All aluminum extrusions come with EN 10204 3.1 material certificates (mill certificates) confirming alloy composition and temper. Our Dolphin audit includes a dedicated Materials Verification pillar.
How does the Dolphin audit apply to aluminum extrusion?
Our 50-point Dolphin framework covers: (1) Factory Infrastructure — press capacity, die shop, billet storage; (2) Process Control — extrusion speed, temperature logs, quench methodology; (3) Materials & Traceability — billet CoA, alloy verification, batch tracking; (4) Quality Systems — dimensional inspection, finish verification, defect rate tracking; (5) Commercial — on-time delivery history, QC documentation capability. Only factories passing all 5 pillars join our network.
What surface finishes are available from your extrusion factories?
Mill finish, anodizing (clear, black, bronze, champagne, custom colors, 5–25µm), powder coating (any RAL color, wood grain transfer, textured), PVDF coating, electrophoresis, polishing, brushing, and sandblasting. Most of our extrusion factories handle anodizing and powder coating in-house — reducing lead time and handling risk vs. outsourcing finishing.
Can I get secondary fabrication done at the same factory?
Yes. Our vertically integrated extrusion factories offer CNC machining (milling, drilling, tapping), sawing to length (±0.5mm standard, ±0.1mm precision), bending, punching, welding (TIG/MIG), thermal break insertion, and assembly. Keeping secondary ops in-house at the extrusion facility reduces cost, lead time, and quality handoff risk — a key advantage our Dolphin audit verifies.
What is the typical lead time for a custom extrusion profile?
New die design and fabrication: 5–15 days (solid profiles 5–10 days, hollow/semi-hollow 10–15 days). First production run after die approval: 2–3 weeks. For existing dies, production-only lead time is 1–2 weeks depending on order volume. Air freight to US/EU: 5–7 days. Ocean freight: 25–35 days.
What is the minimum order quantity?
Typically 500kg per alloy/temper combination for a new die. For existing standard profiles, minimum is approximately 200–300kg. We work with DEWIN clients to consolidate orders across our network where volume is low — so you're not forced to overstock to meet MOQ.

Quick Sourcing Inquiry