Skip to main content

🇻🇳 178 profiles · Engineering review

Tariff Strategy

China Tariffs Are Costing You
25%+ Per Shipment.

Section 301 tariffs add 25% or more to every part you import from China. Vietnam-made parts face only standard MFN duty rates (typically 2–6% for machined parts and castings) — no Section 301 surcharges, no trade war risk, and 40–60% lower base costs.

Updated February 2026 — reflects current USTR tariff schedules

The Real Cost of China Tariffs

Since 2018, Section 301 tariffs have added 7.5–25% to Chinese manufactured goods. For most custom parts (HTSUS Chapters 73, 76, 84, 85), the rate is 25%. Here's what that looks like on real orders.

CNC Aluminum Bracket (100 pcs)

China FOB
$4,200
+ 25% Tariff
$1,050
China Landed
$5,250
Vietnam Landed
$2,800
You Save
$2,450 (47%)

Die Cast Housing (1,000 pcs)

China FOB
$18,000
+ 25% Tariff
$4,500
China Landed
$22,500
Vietnam Landed
$12,000
You Save
$10,500 (47%)

Sheet Metal Enclosure (500 pcs)

China FOB
$8,500
+ 25% Tariff
$2,125
China Landed
$10,625
Vietnam Landed
$5,200
You Save
$5,425 (51%)

Injection Molded Parts (10K pcs)

China FOB
$5,000
+ 25% Tariff
$1,250
China Landed
$6,250
Vietnam Landed
$2,800
You Save
$3,450 (55%)

Estimates based on actual 2026 quotes. Shipping costs similar for both origins (sea freight from Asia).

Why Companies Are Moving to Vietnam

🏛️

No Section 301 Surcharges

Vietnam is exempt from US Section 301 tariffs. Parts enter under standard MFN duty rates — no 25%+ punitive surcharges like China.

📉

40–60% Lower Base Cost

Even before tariffs, Vietnam factory rates are 30–50% lower than China for comparable quality and equipment.

🌏

Trade Agreement Coverage

Vietnam is party to CPTPP, EVFTA, and RCEP — providing preferential access to markets beyond the US.

🏭

Modern Factory Base

Samsung, Intel, Apple, and LG have invested billions in Vietnam manufacturing. The supply chain ecosystem is mature and growing.

📋

IP Protection Improving

Vietnam's 2023 IP law reforms and CPTPP commitments have significantly strengthened intellectual property enforcement.

🚢

Similar Logistics

Ho Chi Minh City to US West Coast: 14–18 days. Shanghai: 12–16 days. The difference is negligible for most production schedules.

How to Move Parts from China to Vietnam

We've helped dozens of companies transition. Here's the typical process.

1

Send Us Your China Parts List

Share your current drawings, specs, and volumes. We'll identify which parts are best suited for Vietnam production and estimate savings.

2

Factory Matching & Quoting

We match each part to the right factory in our audited network. You get detailed quotes with DFM feedback within 48 hours.

3

Sample & Qualification

First article samples with full dimensional reports. We handle the back-and-forth until parts meet your specs exactly.

4

Production & QC

Our on-site team manages production, runs in-process inspections, and ships with full quality documentation.

Stop Paying 25% Extra on Every Shipment

Send us your drawings or current China supplier quotes. We'll show you exactly how much you save by manufacturing in Vietnam — with a detailed cost comparison in 48 hours.

Get a Tariff-Savings Quote →

Quick Sourcing Inquiry