Skip to main content

🇻🇳 178 profiles · Engineering review

Free DownloadUpdated March 2026

RFQ Template
Vietnam Factory
Sourcing Edition

Get accurate quotes from Vietnam's top audited factories. This 8-section RFQ template is tailored for global buyers working with our 178+ verified factory network — with notes for Dolphin audit requirements, on-site inspection, and FTA documentation.

  • 8-section template covering every spec your factory needs
  • Factory qualification checklist aligned with 50-point Dolphin audit
  • Pre-shipment inspection request fields (our team handles it)
  • FTA documentation guidance — CPTPP, EVFTA, RCEP
  • Free — no account required
178+ audited factories1,700+ real on-site photos50-point Dolphin audit
🏭

178+ Audited Vietnam Factories

50-point Dolphin audit · Real photos · On-ground team

A complete RFQ helps our team match you to the right factory in our network — by process, volume, tolerance, and certification tier.

Get the Free RFQ Template

We'll email you the editable Word + Excel version + factory qualification checklist.

No spam. Unsubscribe anytime.

178+
Audited factories
in Dewin Vietnam network
50
Audit checkpoints
in every factory assessment
1,700+
Real factory photos
from on-site visits
16+
FTAs covering Vietnam
CPTPP, EVFTA, RCEP…
Template Preview

8 Sections Every RFQ Needs

A complete RFQ means faster quotes from our factories — and a closer match to the right facility in our 178+ audited network.

Section 01

Part Identification

  • Part number & revision
  • 2D drawing (PDF) + 3D CAD file (STEP/IGES)
  • Part name and intended application
  • Critical vs. non-critical dimensions flagged

💡 Factory tip: Our Vietnamese factory partners work fastest with STEP files. Including a 3D model typically cuts quote turnaround from 5 days to 2 days.

Section 02

Material Specification

  • Material grade (e.g., 6061-T6 aluminum, 304 SS, A380 die-cast)
  • Acceptable substitutes (if any)
  • ROHS / REACH compliance requirement
  • Material certificate (mill cert / COA) required: yes/no

💡 Factory tip: Vietnam's factories source raw materials from certified domestic mills and ASEAN suppliers — specify "or equivalent approved by Dewin" to get the best local pricing.

Section 03

Tolerances & Surface Finish

  • General tolerance (ISO 2768-m or equivalent)
  • Critical feature tolerances (call out individually)
  • Surface finish Ra value
  • GD&T callouts if applicable

💡 Factory tip: Our Dolphin audit scoring tracks a factory's CMM capability and typical achievable tolerance. We match your tolerance requirements to the right factory tier.

Section 04

Quantity & Delivery

  • Sample/prototype quantity (typically 3–10 pcs)
  • First production run quantity
  • Annual volume forecast
  • Target delivery date
  • Destination port (for freight quotation)

💡 Factory tip: Vietnam factories respond well to annual volume forecasts. Even rough estimates (e.g., "est. 10,000/year") help them optimize pricing and plan capacity.

Section 05

Finishing & Coatings

  • Post-processing required (anodize, powder coat, painting, plating)
  • Color specification (RAL, Pantone, or sample)
  • Coating thickness requirements
  • Masking / keep-out areas

💡 Factory tip: Vietnam has strong anodizing and powder coating infrastructure. We inspect finishing quality as part of the 50-point Dolphin audit on every factory.

Section 06

Quality & Certifications

  • Factory certification required (ISO 9001, IATF 16949, etc.)
  • Inspection documents needed (FAIR, PPAP, CMM report, COC)
  • AQL level (e.g., 1.0 Major / 2.5 Minor)
  • Pre-shipment inspection: yes/no (Dewin on-ground team available)

💡 Factory tip: Dewin's on-the-ground team can perform pre-shipment inspection at no extra charge for qualified orders. Flag this requirement early — we'll assign an inspector to your factory.

Section 07

Packaging & Export

  • Packaging type: bulk / individual bag / carton
  • Export carton dimensions & max weight
  • INCOTERMS: FOB Vietnam port or CIF destination
  • Country of origin marking required
  • Special export documents (packing list format, HS code)

💡 Factory tip: Most global buyers use FOB Vietnam port — it gives you full control of freight and clearly establishes Vietnam origin, which qualifies for preferential rates under 16+ FTAs.

Section 08

Commercial Terms

  • Payment terms (30/70, 50/50, T/T, L/C)
  • Quote validity period (suggest 30 days)
  • NDA requirement: yes/no
  • Sample approval process
  • Technical contact name & email

💡 Factory tip: For new supplier relationships, 50% deposit / 50% on shipment is standard in Vietnam. For established relationships, net-30 or T/T 30 days after B/L is common.

Dewin Exclusive

Your RFQ Drives Our
50-Point Factory Match

When you submit an RFQ through Dewin, our team doesn't just forward it to any factory. We cross-reference your requirements against our Dolphin Audit database — matching tolerance requirements, certifications, capacity, and finishing capabilities to the right factory in our 178+ network.

A complete RFQ (8 sections, all fields filled) gets you a factory match within 24 hours. An incomplete RFQ means our team needs to call you back — adding days to your sourcing cycle.

Learn about the 50-point Dolphin Audit →

The 5 Dolphin Audit Categories

⚙️

Equipment & Capacity

Machine age, type, precision, and production capacity per shift

📋

Quality System

ISO certs, inspection equipment, CMM capability, SPC usage

👥

Human Resources

Skilled operator count, engineer-to-worker ratio, training records

🔗

Supply Chain

Raw material sourcing, supplier vetting, incoming inspection

🏭

Facility & Safety

Workshop condition, cleanliness, environmental compliance, fire safety

Why this matters: Every factory in our network has been personally visited and scored. We have 1,700+ real photos of production floors, equipment, and quality labs — not stock images.

RFQ Readiness Checklist

Check off what you have ready — see how complete your RFQ package is before you submit.

RFQ Completeness0 / 12

Check items as you complete them

Ready to Meet Your
Vietnam Factory?

Submit your drawing directly and our on-ground team will match you to the right audited factory in 24 hours. Real photos. Real audits. Real quotes.

178+ audited factories · 50-point Dolphin audit · 1,700+ real factory photos · 16+ FTAs

Quick Sourcing Inquiry