Skip to main content

🇻🇳 178 profiles · Engineering review

← All ServicesInvestment Casting

Investment Casting from Vietnam.
Real Foundries. Real Audits. Real Photos.

Precision lost wax casting in stainless steel, carbon steel, aluminum, and superalloys — from our network of 178+ audited Vietnam factories. Every foundry scored against our 50-point Dolphin audit.

Tooling from $500 · Silica sol + water glass processes · Full material certs · Free DFM review

178+
Audited Vietnam Factories
1,700+
Real Factory Photos
50-Point
Dolphin Audit per Foundry
16+
Free Trade Agreements

Why Source Investment Castings from Vietnam?

Vietnam's investment casting industry has been serving global pump, valve, automotive, and industrial OEMs for over two decades. Driven by Japanese and Korean industrial companies that moved production there ahead of Western buyers, Vietnamese foundries have developed world-class capability in silica sol precision casting and water glass casting — often at 30–50% lower cost than equivalent Chinese foundries, and without Section 301 tariff exposure.

DEWIN's role is to take the risk out of finding the right foundry. We've physically visited, photographed, and scored every foundry in our network against our 50-point Dolphin audit. You see the real factory — the pour floor, the shell dipping line, the heat treatment equipment, the inspection lab — before you place your first order.

The result: the cost advantage of Vietnam investment casting, without the quality unknowns of sourcing from a factory you've never seen.

Verified Gallery

Investment Casting & Lost Wax Foundries

Real on-site photos from audited lost-wax and precision casting foundries in our Vietnam network.

Investment Casting Processes

🏆

Silica Sol (Precision) Process

  • ✓ Surface finish: Ra 1.6–3.2µm
  • ✓ Tolerances: CT4–CT6 per ISO 8062
  • ✓ Best for stainless steel and superalloys
  • ✓ Part weight: 5g to 50kg
  • ✓ Ideal for pumps, valves, marine, food-grade applications
💡

Water Glass (Standard) Process

  • ✓ Surface finish: Ra 6.3–12.5µm
  • ✓ Tolerances: CT6–CT8 per ISO 8062
  • ✓ Best for carbon and alloy steels
  • ✓ Part weight: 100g to 80kg
  • ✓ 20–30% lower cost than silica sol for suitable applications
🔬

Rapid Prototype Casting

  • ✓ 3D-printed wax or SLA patterns — no tooling required
  • ✓ 1–20 pieces, 2–3 week turnaround
  • ✓ Same production material and quality
  • ✓ Ideal for design validation before tooling commitment
⚙️

Secondary Operations

  • ✓ CNC machining of critical dimensions
  • ✓ Heat treatment: anneal, quench, temper, age hardening
  • ✓ Surface: passivation, electropolishing, plating, painting
  • ✓ NDT: X-ray, MPI, dye penetrant, ultrasonic

Evaluating Alternative Casting Processes?

For high-volume non-ferrous runs or heavy industrial components, explore our audited Die Casting & Sand Casting Foundries.

Explore Foundries →

Materials We Cast

🔩 Stainless Steels

304 · 316 · 316L · CF8M · 17-4PH · 2205 Duplex · 410 · 420 · 440C

Most requested: CF8M (pumps/valves), 17-4PH (industrial/aerospace), 316L (food & marine)

🏗️ Carbon & Alloy Steels

WCB · WCC · 1020 · 1045 · 4140 · 4340 · 8620 · 8630

For: structural components, gears, heavy-duty industrial parts

⚡ Aluminum Alloys

A356 · A357 · ZL101 · ZL104

For: lightweight precision parts, aerospace brackets, electronic enclosures

🌊 Copper & Bronze

C83600 · C95800 · C93700 · C90500 · Brass

For: marine fittings, pump impellers, bearings, valves

🚀 Superalloys

Inconel 625 · Inconel 718 · Hastelloy C276 · Stellite 6 · Monel 400

For: high-temperature, corrosion-resistant, wear applications

🔧 Tool & Specialty Steels

D2 · H13 · S7 · Cobalt-chrome (medical) · Titanium (limited)

For: tooling, medical implants, high-wear industrial parts

What Makes DEWIN Different: The Dolphin Audit

Every investment casting foundry in our network has been scored on 50 checkpoints before a single order is placed. Unlike Alibaba listings or trade fair contacts, you get full factory transparency before you commit.

📋
Quality System
ISO 9001 status, inspection procedures, SPC, AQL capability
🏭
Equipment
Furnaces, shell dipping, heat treatment, NDT gear — all documented with photos
🔗
Traceability
Raw material tracking, melt records, heat number documentation
👥
Labor & Social
Wage compliance, working hours, safety systems, worker welfare
💼
Financial
Business registration, years in operation, customer base stability

How Vietnam Investment Casting Pricing Compares

Vietnam's lower labor costs + no Section 301 tariff exposure makes it significantly more cost-competitive than China for US-bound and EU-bound orders. The savings are structural — not dependent on currency fluctuations.

Part ExampleUS FoundryChina + TariffVietnam (DEWIN)
SS316 valve body (500g, qty 500)$28–38 ea$12–16 + 25% tariff$8.50–11.50 ea
17-4PH impeller (300g, qty 1,000)$22–30 ea$9–12.50 + 25% tariff$6.50–9.00 ea
Carbon steel bracket (1.2kg, qty 2,000)$18–25 ea$7.50–10 + 25% tariff$5.50–7.50 ea
A356 aluminum housing (800g, qty 500)$15–22 ea$6.50–9 + 25% tariff$4.80–6.80 ea

Prices are est. per-piece at listed quantities, excluding tooling. Get an exact quote for your part.

Industries We Cast For

🔧

Pumps & Valves

Valve bodies, impellers, pump housings, flanges, pipe fittings, ball valve components

🚗

Automotive

Turbo housings, exhaust components, suspension brackets, shift forks, sensor housings

✈️

Aerospace & Defense

Structural brackets, actuator components, turbine shrouds, landing gear fittings

🏭

Industrial Equipment

Gearbox housings, bearing carriers, coupling flanges, machine structural parts

Related Guides

How Your Investment Casting Project Works

1

Send Your Design

Upload 3D CAD (STEP/IGES) or 2D drawings with material and quantity. We review for castability and provide DFM feedback.

2

Factory Match & Quote

We match your project to the right foundry from our audited network. Detailed quote covering tooling, piece price, and lead time in 48h.

3

Tooling & Samples

Wax die in 2–4 weeks. First article samples with dimensional report, material cert, and mechanical test results.

4

Production & Delivery

Mass production with in-process QC, NDT inspection, and pre-shipment inspection by our team. Full documentation package.

Investment Casting FAQ

Which Vietnam foundries does DEWIN work with for investment casting?+
Our investment casting network includes foundries in Hanoi, Haiphong, Ho Chi Minh City, and the Binh Duong industrial corridor — specialising in stainless steel, carbon steel, and aluminum lost wax casting. Every foundry has been physically visited, photographed, and scored under our 50-point Dolphin audit before joining the network.
What investment casting materials are available from Vietnam?+
Stainless steels (304, 316, 316L, 17-4PH, CF8M, 2205 duplex), carbon steels (WCB, 1020, 1045, 4140, 4340), aluminum alloys (A356, A357), copper and bronze alloys (C83600, C95800), and nickel-base superalloys (Inconel 625, Inconel 718, Hastelloy C276). Material certificates are provided for every batch.
What tolerances and surface finish can I expect?+
Silica sol (precision) process: Ra 1.6–3.2µm surface finish, tolerances CT4-CT6 per ISO 8062. Water glass (standard) process: Ra 6.3–12.5µm, CT6-CT8. CNC machining of critical features is available in-house at most foundries for tighter tolerances.
How does the 50-point Dolphin audit work for casting foundries?+
Our Dolphin audit for casting foundries scores 50 checkpoints across 5 pillars: Quality Management System (ISO 9001 status, inspection capability, melt/pour procedures), Equipment & Capacity (furnaces, shell dipping lines, heat treatment equipment, NDT gear), Materials Traceability, Labor & Social Compliance, and Financial Stability. You get the score, photos, and equipment list before you place your first order.
Can Vietnam foundries handle secondary operations?+
Yes. The majority of our investment casting partners offer integrated secondary operations: CNC machining, surface treatment (passivation, electropolishing, plating, painting), heat treatment (solution anneal, quench, temper, aging), and NDT inspection (X-ray, MPI, dye penetrant, ultrasonic). Single-source manufacturing from casting to finished part.
What certifications do your investment casting foundries hold?+
ISO 9001:2015 (all foundries), IATF 16949 (automotive-capable foundries), ISO 13485 (medical-grade foundries), PED 2014/68/EU (European pressure equipment), and EN 10204 3.1 material certification capability. Foundry-specific certifications are listed in each factory's Dolphin audit profile.
How do I start an investment casting project with DEWIN?+
Send us your 3D CAD files (STEP, IGES) or 2D drawings with material and quantity requirements. We'll match your project to the best-fit foundry in our audited network, provide DFM feedback for castability, and return a detailed quote covering tooling, piece price, secondary operations, and lead time within 48 hours.
What is the typical tooling lead time for investment casting?+
Wax injection dies: 2–4 weeks depending on complexity. For prototype quantities (1–20 pieces), we offer 3D-printed wax or SLA patterns as a no-tooling option with 2–3 week turnaround. Production die life is typically 50,000–200,000+ shots depending on material and die steel grade.

Ready to Source Investment Castings from Vietnam?

Send us your CAD files or drawings and we'll return a factory match, DFM review, and detailed quote within 48 hours. No commitment required.

Or email your drawings to sourcing [at] dewinvietnam.com

Quick Sourcing Inquiry