Skip to main content

🇻🇳 178 profiles · Engineering review

Changelog

What's New

Plain-language release notes for the things that change how you quote, track, and receive parts. No internal jargon, no vaporware — only what is live on this site.

New

Customer portal and quote collaboration

  • Sign in with just your email — we send you a secure sign-in link, no password to manage.
  • See all your quotes in one place, including quotes a colleague has shared with you.
  • Message our engineering team directly from your quote status page, and read replies there too.
  • Download quote documents we attach for you (quotations, inspection reports) from the status page.
  • Approve a quote online when it is ready — this confirms you accept the quoted terms, and our team then contacts you for PO details.
  • Reorder a past quote in one click: your specs and files are copied into a new request.
  • Share read access to a quote with up to 5 teammates by email.
  • Clearer status tracking across the full order lifecycle, from engineering review through production, inspection, shipping, and delivery.
New

Instant engineering feedback on your uploads

  • Upload a 3D file (STL and common formats) and we automatically read its size, volume, and geometry.
  • Automatic design-for-manufacturing checks flag potential issues before an engineer even opens your file.
  • An indicative price and lead-time band appears while you fill in the quote form — a rough range to orient you, not a formal quote.
  • Your quote status page shows the best-matched factories from our verified network, with the reasons they were matched.
Improved

Real quote tracking with reference IDs

  • Every quote request now gets a reference ID (like DW-2607-A1B2) shown right after you submit.
  • CAD files upload securely to our storage during the quote request — no more emailing drawings separately unless you prefer to.
  • A private status link lets you check where your quote stands at any time, including your uploaded files and event history.
Improved

Step-by-step quote wizard and published spec tables

  • The quote form became a guided multi-step wizard with material and grade selectors, surface finish options, and compliance checkboxes (AS9100, ITAR, ISO 13485).
  • The CNC machining, sheet metal, and injection molding service pages now publish full technical specification tables, tolerances, and design-for-manufacturing rules — the same numbers our engineers quote against.

Try the latest quote experience

Upload your drawings, get instant DFM feedback and an indicative band, and track everything with your reference ID.

Start a Quote →

Quick Sourcing Inquiry