Skip to main content

🇻🇳 178 profiles · Engineering review

Full Buyer Visibility — Every Step

Transparent Sourcing —
Every Step Visible

When you source through Dewin, you're not placing blind orders. You see the factory audit scores, the DFM review, the production photos, the QC report — and you get all the FTA documentation you need. No black boxes. No surprises.

178+ audited factories
1700+ real factory photos
50-point Dolphin audit
16+ FTAs covered
6 Stages. Full Transparency.

What Happens Before, During & After Your Order

Every Dewin order follows the same structured process — and you have visibility into all of it.

01
🔍

Factory Selection & Dolphin Audit

178+ factories assessed on our 50-point Dolphin audit across 5 pillars: facilities, quality systems, capacity, team, and compliance. Only factories scoring 70+ qualify for our network. Buyers receive the audit summary before any order.

50-point Dolphin audit | 70+ score required to qualify
02
🛠️

Technical & DFM Review

Our local engineers validate manufacturability of your drawings and specs before quoting begins. We flag issues early — tolerances, material alternatives, process fit — so there are no surprises during production.

Local engineers review specs before quoting
03
🏭

Transparent Quoting

You receive a line-item quote showing factory-direct costs. No hidden markups, no black-box pricing. For international buyers, we also flag applicable FTAs to minimize your import tariffs — 16+ FTAs cover Vietnam exports.

16+ FTA coverage for tariff minimization
04
📸

Production with Live Updates

Our on-ground team visits the factory at each production milestone. You receive photos and short video updates via email — so you can see your parts being made, not just hope they turn out right.

On-ground team. Real factory photos. Video milestones.
05
✅

Pre-Shipment Inspection

Before goods leave the factory, our QC team conducts a full inspection: dimensional checks, visual surface review, and functional testing. You receive a written QC report with photos. Only goods that pass ship.

1700+ real factory photos — you know these factories
06
📦

Shipping, FTA Docs & After-Sales

We prepare all required documentation: Vietnam Certificate of Origin (COO), FORM E for RCEP, EUR.1 for EVFTA. After delivery, our team handles any post-shipment issue resolution on your behalf.

Vietnam COO · FORM E (RCEP) · EUR.1 (EVFTA)
Why Not Just Use Alibaba?

Alibaba / Trade Fairs vs. Dewin Managed Sourcing

You can find Vietnam factories on Alibaba. Here's what you won't find there.

AreaAlibaba / Trade FairsDewin Managed Sourcing
Factory verification❌ Self-reported badges, unverified claims✅ 50-point Dolphin audit, on-site visit, scored & documented
Audit transparency❌ No independent audit reports available✅ Audit summary shared with buyers before order
QC oversight❌ Factory self-inspection only✅ Independent pre-shipment inspection + written report
FTA documentation❌ Buyer must arrange COO and FTA forms themselves✅ Vietnam COO, FORM E, EUR.1 prepared by our team
On-ground presence❌ No local team — you manage remotely✅ On-ground team at factory during production
Post-order support❌ Disputes managed through platform with limited recourse✅ On-ground team handles issue resolution directly with factory
📸

1700+ Real Factory Photos

Every factory in our network has been photographed on-site — equipment, production lines, facilities. You see the real factory, not stock imagery or marketing materials.

🐬

50-Point Dolphin Audit

Our proprietary audit covers 5 pillars: facilities & equipment, quality management, production capacity, team qualifications, and compliance. Only factories scoring 70+ qualify. Audit summaries are shared with buyers.

🌏

On-Ground Vietnam Team

Our local team is physically present during production milestones and pre-shipment inspection. They speak the language, know the factories, and act as your eyes and ears on the ground.

See the Factories Behind Your Parts

Browse our factory network — real photos, audit scores, process capabilities. Or request a virtual or on-site factory tour before you commit to an order.

Watch How We Work

See Our Process in Action

Walk a real Vietnamese factory floor with the on-ground sourcing team that manages your project from inquiry to delivery.

Step Inside a Real Vietnamese Factory with Our Sourcing Team

Step Inside a Real Vietnamese Factory with Our Sourcing Team

Watch on YouTube

Quick Sourcing Inquiry