Skip to main content

🇻🇳 178 profiles · Engineering review

Vietnam Manufacturing

CV Joint Star-Shaped Sleeve Manufacturing Guide

November 22, 2026

Production floor at Viet Na Inox, a DEWIN-audited Vietnamese factory

What Forging Processes Are Used for 20CrMnTi CV Joint Star Sleeves?

CV joint star sleeves are forged from 20CrMnTi or SAE 5120H carburizing alloy steel using 160T to 630T closed-die warm and cold precision forging presses. The process incorporates isothermal normalizing treatment to create a uniform Ferrite-Pearlite grain structure, preparing the forged blanks for precise internal spline broaching and high-speed machining operations.

Key Takeaways

  • CV joint star sleeves (#68-3 to #125) are forged from 20CrMnTi / SAE 5120H carburizing alloy steel using 160T to 630T closed-die presses with isothermal normalizing.
  • Internal spline hydraulic pull broaching and CNC turning hold ±0.008 mm raceway concentricity and spline pitch under DIN 5480 or JIS B 1603 standards.
  • Automated continuous furnace carbonitriding develops a case depth of 0.85 to 1.25 mm with surface hardness reaching HRC 58 to 62.
  • Metrology verification includes ZEISS and Mitutoyo 3D CMM contouring, surface roughness measurement, metallographic microstructure testing, and eddy-current crack sorting.

Precision closed-die forging establishes the core mechanical strength required for automotive drivetrain star-shaped inner races. Raw steel bars of 20CrMnTi or SAE 5120H carburizing alloy steel are cut and processed through 160T to 630T forging presses to form near-net-shape blanks.

Following the initial warm or cold forging stage, blanks undergo isothermal normalizing. This heat treatment refined grain structure ensures a consistent Ferrite-Pearlite matrix, minimizing internal stresses and optimizing machinability for downstream spline broaching.

  • Raw Material Selection: 20CrMnTi and SAE 5120H carburizing alloy steel bar stock
  • Forging Equipment: 160T to 630T closed-die warm and cold precision forging presses
  • Thermal Preparation: Isothermal normalizing for uniform Ferrite-Pearlite grain flow
  • Component Application: Covers #68-3 through #125 star-shaped sleeve geometries
Production floor at Viet Thanh Mechanical Production, a DEWIN-audited Vietnamese factory
Production floor at Viet Thanh Mechanical Production, a DEWIN-audited Vietnamese factory.
Video: Plastic processing and die-casting production inside an audited Vietnamese factory. (@dewintech)

How Is Spline Precision and Concentricity Maintained During Machining?

Raceway concentricity within ±0.008 mm and tight spline pitch tolerances are achieved by combining high-speed hydraulic pull broaching with automated turning cells. Workpieces are machined using 136 robotic CNC lathes alongside four German EMAG hard-turning centers, maintaining DIN 5480 or JIS B 1603 module standards across internal spline configurations.

Internal splines on star-shaped sleeves are produced using high-speed hydraulic pull broaching tools designed to cut precise teeth patterns according to DIN 5480 or JIS B 1603 modular standards. This mechanical broaching step establishes exact spline pitch geometry and pitch diameter accuracy.

Following broaching, raceway geometry is finished on automated turning lines comprising 136 robotic CNC lathes and four EMAG turning centers. Integrated truss-robot loading minimizes manual handling variations and secures ±0.008 mm raceway concentricity across high-volume production runs.

  • Spline Standards: DIN 5480 and JIS B 1603 internal spline module profiles
  • Broaching Method: High-speed hydraulic pull broaching for internal gear teeth
  • Machining Lineup: 136 robotic CNC lathes paired with 4 German EMAG turning centers
  • Tolerance Target: ±0.008 mm raceway concentricity and spline pitch control

Which Heat Treatment and Metrology Inspections Validate Component Quality?

Star sleeves undergo automated continuous furnace carbonitriding under CQI-9 guidelines to achieve a case depth of 0.85 to 1.25 mm and HRC 58 to 62 surface hardness. Post-quench verification utilizes ZEISS and Mitutoyo 3D CMM metrology, metallographic microstructure checks, contour tracing, and 100% eddy-current crack sorting before packaging.

Thermal hardening relies on automated continuous carbonitriding furnaces operating under CQI-9 process standards. This process diffusion yields a controlled case depth between 0.85 mm and 1.25 mm, providing a hard exterior shell of HRC 58 to 62 while maintaining a ductile inner core for high torque resistance.

Quality assurance is enforced through a multi-stage inspection laboratory equipped with ZEISS and Mitutoyo Crysta-Apex S 3D coordinate measuring machines. Inspectors verify contour profiles, surface roughness, metallographic grain structures, and execute 100% non-destructive eddy-current crack sorting prior to vacuum anti-rust sealing.

  • Hardening Specs: CQI-9 controlled carbonitriding continuous furnace treatment
  • Hardness & Depth: HRC 58–62 surface hardness with 0.85–1.25 mm case depth
  • Dimensional Metrology: ZEISS and Mitutoyo Crysta-Apex S 3D CMM inspection
  • Defect Detection: 100% eddy-current crack and hardness sorting prior to vacuum anti-rust packaging
Coordinate measuring machine used for dimensional inspection at VinaStar Technical Plastic Production and Trading, a DEWIN-audited Vietnamese factory
Coordinate measuring machine used for dimensional inspection at VinaStar Technical Plastic Production and Trading, a DEWIN-audited Vietnamese factory.

Precision Manufacturing & Sourcing Specification Matrix

Technical DimensionStandard Commercial GradeHigh-Precision OEM Export GradeDEWIN Verification Protocol
Machining & Forming ToleranceISO 2768-m (±0.10 mm nominal)ISO 2768-f (±0.01 mm – ±0.025 mm critical bores)Calibrated 3D CMM & Air/Pin Gauging
Surface Roughness & FinishRa 1.6 – 3.2 µm as-machined / standard coatRa 0.4 – 0.8 µm precision ground / MIL-A-8625 anodizedProfilometer & Coating Thickness Gauge
Material & Alloy CertificationSupplier Mill Test Report (MTR)Independent OES chemical & mechanical verificationEN 10204 3.1 + RoHS/REACH Compliance
Batch Inspection & PackagingISO 2859-1 (AQL 1.0 Major / 2.5 Minor)Zero-defect critical features + VCI export cratingPre-Shipment Inspection (PSI) Report

Frequently Asked Questions

What raw materials are specified for CV joint star-shaped inner races?

Star-shaped sleeves are primarily manufactured from 20CrMnTi or SAE 5120H carburizing alloy steel, which provides suitable core toughness and carburizing response for drivetrain applications.

What spline module standards are supported during internal broaching?

Internal spline teeth on the star sleeves are broached in accordance with DIN 5480 and JIS B 1603 module standards to fit matching drive shaft splines.

How are internal surface defects and micro-cracks detected after heat treatment?

Parts undergo 100% eddy-current sorting to detect surface cracks and hardness anomalies, followed by metallographic microstructure examination and ZEISS 3D CMM verification.

What protection is applied to finished CV joint sleeves before shipping?

Following 100% sorting and metrology checks, finished star sleeves are preserved using vacuum anti-rust packaging to protect precision-turned raceways during transit.

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.

Upload CAD & Get Quote →

This article is part of DEWIN's technical manufacturing engineering knowledge base. Factory-specific details come from each factory's profile page — please verify current information there or with our team.

Quick Sourcing Inquiry