Recently, we helped an old customer solve a problem. He wanted to develop a flex pipe for vehicles.

Supplier Selection
.jpg)
The drawings provided by the customer are too simple and lack of product details. However, based on our previous experience, we selected two suppliers from the existing suppliers to provide the customer with the quotation scheme of molds and products.
One-stop Service
Because it is at the beginning of the project, the customer doesn’t want to invest too much cost and refuses to open the mold. After learning about the situation, in order to help the old customer, the purchase of Dewin Dolphin Service Department contacted the original design manufacturer of these flex pipes in South Africa(who), purchased two batches of samples and mass production and provided the door to door delivery service for the customer.
Creating Value for Customers
After completing the customer’s order, Dewin didn’t stop there, but sent the sample to the cooperative supplier. After the engineer disassembled and subdivided the sample and analyzed it, the designer combined with the original drawing to make a complete drawing.
Then we took the initiative to contact the customer to ask if we needed to open the mold, because this is a long-term project for the customer, the follow-up demand is huge, the customer decided to open the mold after comprehensive consideration.
After making according to the drawing, we immediately send the sample to the customer for testing, and after three sample submissions and PPAP processes, we can ensure that the product can meet the customer’s use requirements.
Finally, we successfully developed this product, helping customers reduce costs by 40%.
Precision Manufacturing & Sourcing Specification Matrix
| Technical Dimension | Standard Commercial Grade | High-Precision OEM Export Grade | DEWIN Verification Protocol |
|---|---|---|---|
| Machining & Forming Tolerance | ISO 2768-m (±0.10 mm nominal) | ISO 2768-f (±0.01 mm – ±0.025 mm critical bores) | Calibrated 3D CMM & Air/Pin Gauging |
| Surface Roughness & Finish | Ra 1.6 – 3.2 µm as-machined / standard coat | Ra 0.4 – 0.8 µm precision ground / MIL-A-8625 anodized | Profilometer & Coating Thickness Gauge |
| Material & Alloy Certification | Supplier Mill Test Report (MTR) | Independent OES chemical & mechanical verification | EN 10204 3.1 + RoHS/REACH Compliance |
| Batch Inspection & Packaging | ISO 2859-1 (AQL 1.0 Major / 2.5 Minor) | Zero-defect critical features + VCI export crating | Pre-Shipment Inspection (PSI) Report |
Frequently Asked Questions
What engineering files are required to quote design and development of flex pipe with DEWIN?
Provide 3D CAD models (STEP or IGES) along with 2D engineering drawings (PDF/DXF) specifying critical-to-quality (CTQ) tolerances, material grade, surface finish, and annual volume.
How does DEWIN verify dimensional accuracy and material compliance before shipment?
Every production lot undergoes incoming material spectrometer verification (EN 10204 3.1), First Article Inspection (FAI) via 2D/3D coordinate measuring machines (CMM), and AQL pre-shipment audits.
Can DEWIN support both low-volume prototype validation and mass production scaling in Vietnam and China?
Yes. DEWIN coordinates rapid CNC and bridge-tooling prototypes alongside high-tonnage production tooling across audited ISO 9001 and IATF 16949 partner factories in Vietnam and China.
