Skip to main content

🇻🇳 178 profiles · Engineering review

Vietnam Manufacturing

Does the price include packaging when you import custom metal parts from Vietnam?

October 23, 2025

Tooling and die storage at Jinjue Hardware & plastic Company, a DEWIN-audited Vietnamese factory

Magnifying glass beside packaging symbols, foam, and wooden pallet

When I received a quote from a Vietnamese factory a few years ago, I thought everything was included—until the shipment arrived loosely stretch-wrapped on a wooden pallet, without any cartons. That was a costly lesson.
In most cases, standard export packaging is included in the price, but anything custom or beyond basic protection is usually extra—and you need to ask for it clearly.
Let’s break down how packaging works in quotes, what’s usually included, and how to avoid surprises when your metal parts ship from Vietnam.


What packaging is normally included?

Most Vietnamese suppliers include basic export packaging such as stretch film, foam, and pallets—but not retail or branded boxes.
This is one of the first questions you should ask when sourcing: “What’s your standard packaging?”

Industrial bearings and bubble wrap placed on wooden pallet

Standard inclusions typically follow Vietnam’s export packaging practices 1 where only minimum protection is covered unless otherwise agreed.

Table 1: What’s Often Included in "Standard Packaging"

Packaging Type Included in Quote? Common Use Case
Stretch film wrap ✅ Yes Prevents surface scratch during handling
Bubble wrap or foam ✅ Yes (basic only) Minimal shock protection
Wooden pallet ✅ Yes For stacking and forklift handling
Corrugated box/carton ❌ Usually not Requires request; considered "retail packaging"
Custom wooden crate ❌ Optional Quoted separately for fragile/heavy parts

Some factories may add cartons if you ask—but if you don’t, expect the “bare minimum” approach. It works fine for industrial buyers, but not for consumer shipments. 2


Video: Sample metal parts from audited Vietnamese factories in the DEWIN network. (@dewintech)

Are secondary or export packaging extra?

Yes—anything beyond basic protection like rust-proofing, sealed cartons, or custom crates usually costs extra.
Buyers often assume “export packaging” means fully protected crates, but suppliers may not do that unless told.

Various industrial packaging materials and boxes on white background

You should confirm details like secondary packaging standards for exports 3 to ensure proper materials are used.

What Counts as Secondary/Export Packaging?

  • Corrosion protection: VCI bags, anti-rust spray, vacuum sealed pouches
  • Moisture barrier films: For marine shipments
  • Custom crates: Non-standard sizes
  • Retail-ready packaging: Logo cartons, trays, or inserts
  • Hygiene-sensitive wraps: Cleanroom or sealed pouches 4

Table 2: Examples of Extra Packaging Items and Cost Ranges

Packaging Item Estimated Cost per Unit Notes
VCI anti-corrosion bag $0.20 – $0.50 Depends on size and thickness
Custom corrugated carton $0.50 – $2.00 Based on size, print, ply
Foam inserts (die cut) $1.00 – $3.50 Quoted separately, tooling may apply
Custom wooden crate $10 – $50 Heavy or delicate parts only
Moisture desiccant pack $0.05 – $0.10 Optional for sea freight

If you need your parts truly “export-ready,” specify and price these extras upfront. 5


How do suppliers charge for protective packing?

Suppliers typically charge separately for protective packaging—often 2%–5% of the part cost or as itemized add-ons.
Charges depend on material, labor, and packing method.

Digital invoice on tablet beside machined metal components

Common methods follow Vietnam manufacturing cost breakdown standards 6 and may include:

  • Material size and weight
  • Quantity per box
  • Handling requirements
  • Rust prevention materials 7

Table 3: Supplier Charging Models

Charging Method Common? When Used
Flat rate per order ✅ Yes Simple crates or bulk foam
Per part/item fee ✅ Yes For individually packed or fragile parts
Percentage of total part cost ⚠️ Sometimes For bulk orders where packing scales by cost
Included in unit price ❌ Rare Only if explicitly written

Requesting transparent cost breakdowns avoids disputes later. See sample RFQ packaging templates 8 for guidance.


Should you require “export-ready” packing in quote?

Yes. Always specify “export-ready” in writing within your RFQ or purchase order.
If parts will go to warehouses or customers, they must arrive clean, sorted, and properly protected.

Warehouse worker inspecting foam packaging materials with clipboard

You can align with ISPM 15 export wood packaging standards 9 to ensure compliance in international shipping.

What to Specify in Your Quote Request

  • “All parts must be export-ready, packed in moisture-protected cartons.”
  • “Each box must contain max 25 pcs with foam divider and VCI protection.”
  • “Include itemized packaging charges: materials, labor, and tooling.”
  • “Outer crates must comply with ISPM-15 (heat-treated wood).” 10

Even if the supplier says, “We’ll pack properly,” write it into the contract.


Conclusion

Most Vietnamese suppliers include only basic packaging. If you need export-ready cartons, rust prevention, or branded crates, request and confirm those details clearly in your quote.


Frequently Asked Questions

What packaging is normally included?

Most Vietnamese suppliers include basic export packaging such as stretch film, foam, and pallets—but not retail or branded boxes. This is one of the first questions you should ask when sourcing: “What’s your standard packaging?”

Are secondary or export packaging extra?

Yes—anything beyond basic protection like rust-proofing, sealed cartons, or custom crates usually costs extra. Buyers often assume “export packaging” means fully protected crates, but suppliers may not do that unless told.

How do suppliers charge for protective packing?

Suppliers typically charge separately for protective packaging—often 2%–5% of the part cost or as itemized add-ons. Charges depend on material, labor, and packing method.

Footnotes

1. Overview of Vietnam’s export packaging practices. ↩︎
2. Why minimal packaging can cause quality issues. ↩︎
3. ISO reference on secondary packaging design for export. ↩︎
4. Definitions of advanced packaging protection levels. ↩︎
5. Importance of requesting full export-ready specs in RFQ. ↩︎
6. Vietnam manufacturing cost breakdown standards. ↩︎
7. Typical cost factors for protective packaging. ↩︎
8. U.S. trade RFQ template including packaging details. ↩︎
9. IPPC ISPM 15 wood packaging rules for export crates. ↩︎
10. Guidance for specifying export-ready crates in contract. ↩︎

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.

Upload CAD & Get Quote →

This article is part of DEWIN's technical manufacturing engineering knowledge base. Factory-specific details come from each factory's profile page — please verify current information there or with our team.

Quick Sourcing Inquiry