Skip to main content

🇻🇳 178 profiles · Engineering review

Vietnam Manufacturing

How Can Importers of Custom Steel Parts Optimize Cash Flow Through Duty Deferral Programs?

May 27, 2025

Laser cutting machine running sheet stock at Lap Phuc MECHANICAL PRODUCTION TRADING, a DEWIN-audited Vietnamese factory


Steel flanges with financial chart display

When I first explored importing custom steel parts, one of the biggest challenges was the immediate capital lock-up due to tariffs and customs fees. As soon as the shipment hit the port, duties were due—even if the parts sat in inventory for weeks. Discovering duty deferral programs like FTZs and TIBs gave me the flexibility to manage cash flow and align payments more closely with sales cycles.

Importers of custom steel parts can improve cash flow by using duty deferral programs such as Foreign-Trade Zones (FTZs), Temporary Importation under Bond (TIB), bonded warehouses, and the drawback program. These tools allow businesses to delay or recover duties based on how and when the goods enter U.S. commerce or are re-exported.

What Are the Benefits of Using an FTZ for Steel Parts Imports?

Seminar on FTZ steel import strategies

Foreign-Trade Zones (FTZs) offer the ability to defer duty payments until goods are withdrawn for U.S. consumption, and in some cases, eliminate duties entirely for re-exports. FTZs are secure areas near U.S. ports that are considered outside of U.S. customs territory for duty purposes 1.

Cash Flow and Operational Benefits

  • Duty Deferral: Postpone tariff payments until goods enter U.S. commerce.
  • Duty Elimination: No duties owed if steel parts are re-exported or scrapped within the FTZ.
  • MPF Reduction: Weekly entry filings allow one Merchandise Processing Fee instead of many.
  • Waste Exemption: No duty on scrap or waste generated during production inside the FTZ.
  • Improved Inventory Management: Track steel parts precisely, pay duties only on items sold domestically.
FTZ Benefit Financial Impact
Deferred Tariffs Preserves working capital
Export Duty Elimination Avoids unnecessary costs on non-U.S. goods
MPF Consolidation Reduces customs filing expenses
Waste Exemption Saves on unused or defective goods
Real-Time Inventory Control Aligns duty payment with revenue timing
Video: Brass and industrial valve machining and pressure-testing production in Vietnam. (@dewintech)

How Does the Inverted Tariff Benefit Apply to Steel Components?

Factory workers assembling mechanical rollers

The inverted tariff benefit allows manufacturers within an FTZ to pay the duty rate on the finished product rather than the usually higher duty on imported components like steel parts 2.

Example Use Case

  • Imported Part: Steel shaft (HTS 7326.90.8688, duty 5%)
  • Finished Product: Electric motor (HTS 8501.10.4060, duty 2%)
  • FTZ Benefit: Duty paid at 2%, not 5%, saving 3% on each unit sold in the U.S.

Savings Calculation Example

Item Without FTZ (5% Duty) With FTZ (2% Finished Goods Duty)
CIF Value per Motor Assembly $10,000 $10,000
Duty Paid $500 $200
Savings per Unit — $300

What Are the Steps to Activate FTZ Status for My Facility?

Engineer and inspector reviewing steel import forms

Activating FTZ status involves applying to the local FTZ Board, receiving customs approval, and implementing compliant operational procedures and systems 3.

Step-by-Step FTZ Activation Process

  1. Identify FTZ Availability: Contact your local FTZ grantee or port authority.
  2. Apply for FTZ Designation: Submit an application to the FTZ Board, including a site plan and business justification.
  3. Customs Activation: Once approved, apply to CBP for operational clearance.
  4. Set Up Compliance Systems: Install inventory tracking, zone security, and filing systems.
  5. Train Staff or Hire Brokers: Ensure all staff understand FTZ operations or contract with FTZ service providers.
Step Task Description
Grantee Coordination Find FTZ in your region and apply
Board Approval File formal application with documentation
CBP Activation Prepare compliance procedures and inspection
Tech Setup Implement software for tracking and reporting
Ongoing Compliance Schedule regular audits and maintain records

How Can FTZ Usage Impact Overall Import Cost and Cash Flow?

Business team discussing trade performance data

Using an FTZ can reduce total import costs through deferred duty payments, duty elimination on exports, and lower administrative fees. This directly improves cash flow by reducing upfront tax obligations and allowing better alignment between expenses and sales 4.

Cost Structure Comparison: With vs. Without FTZ

Cost Item Without FTZ With FTZ (Export or Delay)
Import Duty $10,000 $0–$5,000 (if deferred or reduced)
MPF (10 entries/month) $2,000 $200 (1 weekly entry)
Section 232 Tariff $2,500 $0 (if re-exported)
Waste/Scrap Duty $1,000 $0
Total First Month Cash $15,500 $5,200–$7,700

Additional Duty Deferral Tools

Program/Tool Description
TIB (Temporary Importation) Import for testing/trade shows with no duty if re-exported 5
Duty Drawback Reclaim 99% of duties if goods are exported or destroyed 6
Bonded Warehouse Similar to FTZ, allows delayed payment for stored goods 7
First Sale Rule Declare duty based on first transaction (lower base value)

Conclusion

Importers of custom steel parts can optimize cash flow using FTZs and other duty deferral programs that delay, reduce, or eliminate duty payments. These tools allow for more flexible payment timing, reduced overhead, and strategic tariff management. By combining FTZ usage with programs like TIB and duty drawback, importers can maintain strong cash positions while remaining competitive in a global supply chain.


Footnotes


  1. Crowley guide to Foreign-Trade Zones and their benefits for duty deferral. ↩

  2. Explanation of inverted tariff structures and how they apply in FTZs. ↩

  3. U.S. FTZ Board process for applying and activating zone designation. ↩

  4. Overview of cost reductions and cash flow improvements using FTZ programs. ↩

  5. CBP resource on Temporary Importation under Bond and duty-free provisions. ↩

  6. Guide to duty drawback eligibility and how to claim 99% duty refunds. ↩

  7. Bonded warehouse advantages for storing goods without paying immediate duties. ↩

Frequently Asked Questions

What Are the Benefits of Using an FTZ for Steel Parts Imports?

Foreign-Trade Zones (FTZs) offer the ability to defer duty payments until goods are withdrawn for U.S. consumption, and in some cases, eliminate duties entirely for re-exports. FTZs are secure areas near U.S. ports that are considered outside of U.S. customs territory for duty purposes 1 .

How Does the Inverted Tariff Benefit Apply to Steel Components?

The inverted tariff benefit allows manufacturers within an FTZ to pay the duty rate on the finished product rather than the usually higher duty on imported components like steel parts 2 .

What Are the Steps to Activate FTZ Status for My Facility?

Activating FTZ status involves applying to the local FTZ Board, receiving customs approval, and implementing compliant operational procedures and systems 3 .

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.

Upload CAD & Get Quote →

This article is part of DEWIN's technical manufacturing engineering knowledge base. Factory-specific details come from each factory's profile page — please verify current information there or with our team.

Quick Sourcing Inquiry