Skip to main content

🇻🇳 178 profiles · Engineering review

Vietnam Manufacturing

How much do you know about the die casting process?

March 10, 2022

Die casting machine at Minh Uy Production Technology, a DEWIN-audited Vietnamese factory

The die casting process, that is, the pressure casting process, is a casting process in which the metal in the molten or semi-molten state is pressed into the metal mold at high speed, and then the molding is cooled under pressure. High-speed injection, high-pressure casting is the die casting process is different from powder metallurgy technology unique, accompanied by mechanization and automation, in the die casting process produced by the die casting process, can be embedded in the casting of small parts, simplify the process can also complete the complex shape, thin-walled casting, which means that it has a high degree of production efficiency, can complete large-scale product customization production.

Die casting machine at Minh Quang Mechanical Manufacturing, a DEWIN-audited Vietnamese factory

At present, in the electronic and electrical accessories, doors and windows hardware, auto and motorcycle spare parts, lampshade accessories and other industrial accessories, can see the figure of the die casting process, our company is also to see the unique advantages of the die casting process itself, as well as the huge demand of the market, therefore, the die casting process as one of the key technologies cultivated by our company’s factory. The die-casting products produced by our factory have been widely used in the automotive industry, home appliance industry, and other key industrial industries, and enjoy a high reputation in the global industry.

Trust Dewin, into die-casting technology.

Production floor at Kobayashi Casting, a DEWIN-audited Vietnamese factory
Production floor at Kobayashi Casting, a DEWIN-audited Vietnamese factory.
Video: Plastic processing and die-casting production inside an audited Vietnamese factory. (@dewintech)

Precision Manufacturing & Sourcing Specification Matrix

Technical DimensionStandard Commercial GradeHigh-Precision OEM Export GradeDEWIN Verification Protocol
Machining & Forming ToleranceISO 2768-m (±0.10 mm nominal)ISO 2768-f (±0.01 mm – ±0.025 mm critical bores)Calibrated 3D CMM & Air/Pin Gauging
Surface Roughness & FinishRa 1.6 – 3.2 µm as-machined / standard coatRa 0.4 – 0.8 µm precision ground / MIL-A-8625 anodizedProfilometer & Coating Thickness Gauge
Material & Alloy CertificationSupplier Mill Test Report (MTR)Independent OES chemical & mechanical verificationEN 10204 3.1 + RoHS/REACH Compliance
Batch Inspection & PackagingISO 2859-1 (AQL 1.0 Major / 2.5 Minor)Zero-defect critical features + VCI export cratingPre-Shipment Inspection (PSI) Report

Frequently Asked Questions

What engineering files are required to quote how much do you know about the die casting process? with DEWIN?

Provide 3D CAD models (STEP or IGES) along with 2D engineering drawings (PDF/DXF) specifying critical-to-quality (CTQ) tolerances, material grade, surface finish, and annual volume.

How does DEWIN verify dimensional accuracy and material compliance before shipment?

Every production lot undergoes incoming material spectrometer verification (EN 10204 3.1), First Article Inspection (FAI) via 2D/3D coordinate measuring machines (CMM), and AQL pre-shipment audits.

Can DEWIN support both low-volume prototype validation and mass production scaling in Vietnam and China?

Yes. DEWIN coordinates rapid CNC and bridge-tooling prototypes alongside high-tonnage production tooling across audited ISO 9001 and IATF 16949 partner factories in Vietnam and China.

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.

Upload CAD & Get Quote →

This article is part of DEWIN's technical manufacturing engineering knowledge base. Factory-specific details come from each factory's profile page — please verify current information there or with our team.

Quick Sourcing Inquiry