How to Understand Vietnam's Tax Incentives and Export Rebates When Sourcing Stamping Parts?

July 16, 2026

Cutting and drilling equipment at Hoang Thinh Mechanical Production, a DEWIN-audited Vietnamese factory

Overview of Vietnam tax incentives and export rebates for stamping parts sourcing

When our Vietnam office first helped a U.S. buyer navigate tax incentives on stamping parts, the paperwork felt like a maze — one wrong step meant thousands lost in unclaimed rebates.

Vietnam’s tax incentives and export rebates for stamping parts include a 10% preferential Corporate Income Tax rate for up to 15 years, import duty exemptions on machinery and raw materials, and VAT refunds on exported goods — but only if the supplier holds the correct Supporting Industry certification and follows strict documentation rules.

This guide breaks down each incentive, who qualifies, what documents you need, and how to work with your supplier to capture every dollar of savings. Let me walk you through what we have learned managing supply chains across Vietnam.

What Tax Incentives Does Vietnam Offer for Foreign Buyers Sourcing Stamping Parts?

A question I hear often from purchasing managers is simple: "Why Vietnam over other countries?" The answer usually starts with numbers — and the tax incentives on metal stamping manufacturing projects are some of the most competitive in Southeast Asia.

Vietnam offers foreign buyers sourcing stamping parts access to a 10% Corporate Income Tax rate for 15 years, a 4-year full tax holiday, import duty exemptions on machinery and raw materials, land rent waivers of 3 to 11 years, and 0% VAT on exported goods — all tied to the supplier's Supporting Industry or high-tech classification.

Foreign buyers benefit from Vietnam's CIT reductions, tax holidays, and duty exemptions on stamping parts

Corporate Income Tax Exemptions

The standard Corporate Income Tax 1 rate in Vietnam is 20%. But stamping manufacturers that qualify under Decree 57 as a Supporting Industry can access a preferential tax rate of just 10% for 15 years. This is a significant cost advantage that flows downstream to buyers through lower part prices.

Here is how the tax holiday works:

Phase Duration CIT Rate
Full Exemption First 4 years from first taxable profit 0%
50% Reduction Next 9 years 5% (half of 10%)
Preferential Rate Remaining years (up to 15 total) 10%
Standard Rate (after incentive period) Ongoing 20%

If the supplier does not generate profit in the first three years, the holiday starts automatically in the fourth year. This structure is one reason many stamping factories in Vietnam can offer pricing that undercuts competitors in other regions.

Import Duty Exemptions on Capital Equipment and Materials

When a stamping facility sets up a new production line, it needs presses, progressive dies 2, and coil-feeding equipment. Vietnam exempts import duties on machinery and equipment that form fixed assets 3 for incentivized projects. This directly lowers the supplier's capital expenditure, which keeps per-piece costs lower for buyers.

Raw materials like steel coils, specialized alloys, and surface treatment chemicals can also qualify for import duty exemptions — especially when they are used for export-oriented production. The key condition is that these materials must be accounted for separately and used directly in the incentivized project.

Land Rent Waivers

Many of our supplier partners operate within industrial parks and economic zones 4 across Vietnam. These locations offer significant land rent waivers:

  • 3 years free rent during the construction phase
  • 7 years exemption for Supporting Industry manufacturing projects
  • 11 years for technical infrastructure in Supporting Industry zones
  • Up to 15 years in designated disadvantaged areas

These savings reduce factory overhead. For buyers, this means more competitive unit pricing on brackets, mounting hardware, and other stamped components.

SME and Additional Rates

Small and medium enterprises with annual revenue under VND 50 billion may qualify for preferential tax rates of 15–17%, even if they do not meet high-tech criteria. Vietnam also offers additional tax reductions for manufacturers employing significant numbers of female staff and ethnic minorities.

✔ Stamping parts manufacturers classified under Supporting Industries can access a 10% CIT rate for 15 years True
Decree 57 specifically targets supporting industries like stamping for auto and electronics sectors, granting this preferential rate along with a 4-year full exemption and 9 years at 50% reduction.
✘ Any stamping factory in Vietnam automatically receives a 10% tax rate False
The 10% rate is not automatic. The manufacturer must proactively apply for and receive a Supporting Industry Incentive Certificate from the Ministry of Industry and Trade, proving their products meet specific technical and value-add criteria.
Video: Sample metal parts from audited Vietnamese factories in the DEWIN network. (@dewintech)

How Do I Qualify for Export Tax Rebates on Custom Stamping Parts from Vietnam?

Last year, one of our U.S. clients almost missed out on a substantial VAT refund because the supplier had not structured the export documentation correctly. That experience taught us how critical it is to understand the qualification process before the first purchase order ships.

To qualify for export tax rebates on custom stamping parts from Vietnam, the manufacturer must export goods at 0% VAT, accumulate uncredited input VAT exceeding VND 300 million, and submit a formal VAT refund application with complete export customs declarations, commercial invoices, and proof of payment from the foreign buyer.

Manufacturers qualify for export tax rebates through VAT refunds on custom stamping parts

How the VAT Refund Mechanism Works

Exported stamping parts are subject to a 0% Value Added Tax 5 rate. This means the manufacturer charges no output VAT on exports. However, the factory still pays input VAT on domestic purchases — steel, electricity, tooling, packaging. This creates a VAT credit balance.

Once that uncredited input VAT reaches VND 300 million (roughly USD 12,000), the manufacturer can file for a VAT refund for exporters. This refund goes directly to the supplier, but the savings should be reflected in the pricing offered to buyers.

The standard domestic VAT rate is 10%, though some goods and services were temporarily reduced to 8% under Decree 44/2023 through mid-2025.

Export Processing Enterprise Status

Manufacturers located in Export Processing Zones enjoy a special status called Export Processing Enterprise. This provides "non-tariff zone" treatment. Goods entering the zone are treated as imports into a bonded area, and goods leaving for export skip most customs duties and VAT requirements.

This is a major advantage for stamping part buyers. If your supplier operates in an EPZ, customs clearance procedures are simplified, and the duty/VAT compliance burden drops significantly.

The On-the-Spot Export-Import Regime

Here is a lesser-known but valuable mechanism. Under Vietnam's "On-the-Spot" export-import regime, a stamping manufacturer can deliver parts to another company within Vietnam — and still qualify for export tax treatment. The condition: the receiving company must use those parts for further export production.

This matters if your supply chain involves multiple processing steps across different Vietnamese factories. For example, a stamped bracket might go from Facility A (stamping) to Facility B (plating and assembly) before final export. With proper OTS documentation, the tax benefits stay intact at each handoff.

Subcontracting and Duty-Free Status

If a stamping manufacturer subcontracts secondary processes like heat treatment, plating, or powder coating to a third party, they must use specific "outsource manufacturing" customs declarations. Failing to do so can result in losing the duty-free status on the original imported raw materials.

We have seen this issue firsthand. A supplier we audited in Binh Duong had subcontracted zinc plating without proper declarations. The customs authority reclassified their imported steel coil as domestic consumption, triggering a retroactive duty bill. The lesson: always verify your supplier's subcontracting documentation.

Export Rebate Mechanism Key Requirement Benefit
0% VAT on Exports Goods must leave Vietnam or enter an EPZ No output VAT charged to buyer
Input VAT Refund Uncredited input VAT ≥ VND 300 million Cash refund to manufacturer
On-the-Spot Export Receiving party uses goods for export production Tax-free inter-factory transfers
EPZ Non-Tariff Zone Factory located in Export Processing Zone Simplified customs, no import duties
Bonded Warehouse Parts stored for re-export or regional distribution Duty deferment, VAT-free consolidation
✔ Exported stamping parts from Vietnam are subject to 0% VAT, and manufacturers can claim refunds on accumulated input VAT True
Vietnam’s VAT law applies a 0% rate to exported goods. Manufacturers recover input VAT paid on domestic purchases through a formal refund process once the threshold is met.
✘ Subcontracting secondary processes like plating has no impact on a stamping manufacturer’s duty-free status False
If the manufacturer does not file specific outsource manufacturing customs declarations when subcontracting, the customs authority can reclassify duty-exempt raw materials as domestic consumption and impose retroactive duties.

What Documentation Do I Need to Claim Vietnam's Tax Benefits When Importing Stamping Parts?

During a recent project shipping custom mounting brackets to a distribution center in Texas, our logistics team flagged a missing Certificate of Origin 6 halfway through customs clearance. That single document nearly cost the buyer a 5% tariff reduction under a Free Trade Agreement. Documentation is not a formality — it is money.

To claim Vietnam's tax benefits when importing stamping parts, you need a Certificate of Origin (CO) matching the applicable Free Trade Agreement, commercial invoices, packing lists, customs declarations, a bill of lading, the supplier's Supporting Industry Incentive Certificate, and a VAT invoice showing 0% export VAT — all with consistent product descriptions and HS codes.

Required documents like Certificate of Origin and invoices to claim Vietnam import tax benefits

The Certificate of Origin

The Certificate of Origin is the single most important document for claiming preferential tax rates under Free Trade Agreements 7. Vietnam has signed agreements with the EU (EVFTA), ASEAN nations, South Korea, Japan, and others. Each agreement has its own CO form:

Free Trade Agreement CO Form Tariff Benefit
ASEAN Trade in Goods (ATIGA) Form D 0–5% among ASEAN members
Vietnam–EU (EVFTA) EUR.1 or Self-Certification Reduced or 0% on qualifying goods
Vietnam–South Korea (VKFTA) Form VK Preferential rates
RCEP Form RCEP Graduated reductions
CPTPP Self-Certification 0% on most industrial goods

For U.S. buyers, Vietnam does not currently have a bilateral FTA with the United States. However, if stamping parts are further processed in a country that does have an FTA with the U.S., the CO from Vietnam becomes part of the cumulative origin documentation. This is a nuance worth discussing with your trade compliance team.

Core Document Checklist

Here is the documentation we typically prepare or verify for every stamping parts shipment:

  1. Commercial Invoice — Must show unit price, total value, HS code, and Incoterms.
  2. Packing List — Quantity, weight, dimensions, carton markings.
  3. Bill of Lading or Airway Bill — Proof of shipment from Vietnam.
  4. Certificate of Origin — Matching the applicable FTA.
  5. Customs Export Declaration — Filed by the Vietnamese manufacturer.
  6. VAT Invoice — Showing 0% VAT for exported goods.
  7. Supporting Industry Incentive Certificate — Issued by Vietnam's Ministry of Industry and Trade to the supplier.
  8. Quality Inspection Reports — PPAP documentation, dimensional reports, material certifications.
  9. Insurance Certificate — If CIF terms apply.
  10. Fumigation/Phytosanitary Certificate — Required for wooden packaging.

HS Code Consistency

One of the most common errors we encounter is HS code mismatch. The HS code on the commercial invoice 8 must match the code on the Certificate of Origin and the customs declaration. A mismatch triggers delays, manual inspections, and potential denial of preferential tariff treatment.

For stamped metal parts, the HS codes 9 typically fall under Chapter 73 (articles of iron or steel) or Chapter 76 (articles of aluminum). The exact 6-digit or 8-digit code depends on the part's function, material, and finish. We always cross-check codes before shipment to avoid problems at the destination port.

Bonded Warehouse Strategy

For buyers serving multiple markets from a Vietnam base, bonded warehouses offer a practical advantage. Stamping parts can be stored in a bonded facility with duty deferment and VAT-free consolidation. When a regional order comes in — say from Thailand or Indonesia — the parts ship out without ever entering Vietnam's domestic tax system. This is especially useful for ASEAN distribution strategies leveraging Free Trade Agreements like ATIGA.

How Can I Work with My Supplier to Maximize Tax Savings on Vietnam-Sourced Stamping Parts?

The biggest lesson from managing our Vietnam operations is this: tax savings do not happen by accident. They require deliberate coordination between buyer and supplier from the quoting stage through final delivery.

To maximize tax savings on Vietnam-sourced stamping parts, work with your supplier to confirm their Supporting Industry Incentive Certificate, negotiate pricing that reflects their CIT and duty exemptions, align on correct HS codes, structure logistics through Export Processing Zones or bonded warehouses, and account for Global Minimum Tax impacts if the supplier is a large multinational.

Collaborating with suppliers to maximize tax savings on Vietnam-sourced stamping parts

Verify the Supplier's Incentive Status

Not every stamping factory in Vietnam has the same tax status. Before placing orders, ask your supplier three direct questions:

  1. Do you hold a Supporting Industry Incentive Certificate from the Ministry of Industry and Trade?
  2. Are you currently in your CIT exemption or reduction period?
  3. Do you operate in an Export Processing Zone or a standard industrial park?

The answers to these questions directly affect the supplier's cost structure — and therefore your pricing. A supplier in year two of a full CIT exemption has a fundamentally different cost base than one paying the standard 20% rate.

Negotiate Pricing That Reflects Tax Benefits

When a supplier enjoys Corporate Income Tax exemptions, import duty exemptions on raw materials, and land rent waivers, their production costs are materially lower. As a buyer, you should expect those savings to be partially reflected in part pricing.

During our supplier audits in Vietnam, we review the factory's cost breakdown. If a supplier claims high material costs but imports steel coil duty-free, that is a red flag. Transparent cost structures lead to fair pricing for both sides.

The Global Minimum Tax Consideration

Here is a critical factor that many buyers overlook. Starting in 2024, Vietnam adopted the Global Minimum Tax 10 framework. This affects large multinational enterprise groups with global consolidated revenue exceeding EUR 750 million.

If your stamping supplier is a subsidiary of a large multinational, the effective tax rate may be topped up to 15% regardless of local incentives. This means the 10% preferential CIT rate gets neutralized by a 5% top-up tax.

Supplier Type Applicable CIT Rate GMT Impact
Independent Vietnamese SME 10% (Supporting Industry) or 15–17% (SME rate) No impact — below EUR 750M threshold
Subsidiary of mid-size foreign group 10% (if SI certified) No impact — below threshold
Subsidiary of large MNE (>EUR 750M revenue) 10% nominal, but 15% effective 5% top-up tax applies
Factory in EPZ (any size) Varies by certification GMT may still apply if parent exceeds threshold

For our clients, we always check the supplier's corporate structure. A locally owned stamping factory with an SI certificate offers the cleanest tax advantage. A subsidiary of a global conglomerate may not pass those savings through.

Align on Documentation from Day One

Tax savings are only realized if the paperwork is correct. We build a documentation protocol into every supplier onboarding process:

  • Agree on HS codes during the quoting stage, not after shipment.
  • Confirm the Certificate of Origin form required for the destination country.
  • Ensure the supplier's customs broker understands outsource manufacturing declarations if secondary processes are subcontracted.
  • Set up a shared document checklist that both parties review before each shipment.

For a deeper look at getting export paperwork right, see our guide on how to ensure accurate export documents when sourcing stamping parts from Vietnam.

Leverage R&D Fund Deductions

Vietnam allows enterprises to set up a tax-deductible R&D Fund of up to 20% of annual pre-tax profits. If your supplier invests in die design, tooling development, or process automation for your custom stamping parts, those costs may qualify for R&D deductions. This is another lever that can reduce total production costs.

We encourage our supplier partners to invest in progressive die technology and automated inspection systems. Not only does this improve quality and reduce the rework that frustrates buyers, but it also generates legitimate tax deductions that keep costs competitive.

Location Matters — But Differently Now

Under the 2025 Investment Law, Vietnam is shifting incentives away from broad location-based criteria toward performance, technology level, and scale. A stamping factory in a standard industrial park near Ho Chi Minh City may see reduced incentives compared to one in a designated high-tech zone or disadvantaged area.

For buyers evaluating new supplier relationships, ask where the factory is located and what zone classification it falls under. Factories in high-tech industrial parks and economic zones still offer the strongest incentive packages, including the deepest preferential tax rates and longest land rent exemptions. You can also explore how Vietnam’s tax incentives and export rebates work in practice for additional detail on zone-specific benefits.

✔ The Global Minimum Tax can neutralize Vietnam’s 10% CIT rate for suppliers owned by large multinational groups True
Under GMT rules, if the parent company’s global revenue exceeds EUR 750 million, a top-up tax brings the effective rate to 15%, eliminating the benefit of the 10% preferential rate.
✘ All stamping factories in Vietnam’s industrial parks receive the same tax incentives False
Incentives vary significantly by zone classification, factory certification status, and the 2025 Investment Law’s shift toward performance-based rather than location-based criteria. Standard parks in major cities may offer fewer benefits than high-tech zones or disadvantaged areas.

Conclusion

Vietnam's tax incentives and export rebates offer real cost advantages for sourcing stamping parts — but only with the right supplier certification, correct documentation, and awareness of factors like the Global Minimum Tax.

Frequently Asked Questions

What Tax Incentives Does Vietnam Offer for Foreign Buyers Sourcing Stamping Parts?

A question I hear often from purchasing managers is simple: "Why Vietnam over other countries?" The answer usually starts with numbers — and the tax incentives on metal stamping manufacturing projects are some of the most competitive in Southeast Asia.

How Do I Qualify for Export Tax Rebates on Custom Stamping Parts from Vietnam?

Last year, one of our U.S. clients almost missed out on a substantial VAT refund because the supplier had not structured the export documentation correctly. That experience taught us how critical it is to understand the qualification process before the first purchase order ships.

What Documentation Do I Need to Claim Vietnam's Tax Benefits When Importing Stamping Parts?

During a recent project shipping custom mounting brackets to a distribution center in Texas, our logistics team flagged a missing Certificate of Origin 6 halfway through customs clearance. That single document nearly cost the buyer a 5% tariff reduction under a Free Trade Agreement. Documentation is not a formality — it is money.

Footnotes


1. General overview of corporate taxation systems globally. ↩︎


2. Explains the progressive stamping process used for high-volume metal part production. ↩︎


3. International accounting standard defining fixed assets like machinery and equipment. ↩︎


4. Asian Development Bank report on the role of economic zones in development. ↩︎


5. Explains the mechanism of VAT and zero-rating for exports. ↩︎


6. Explains the role of Certificates of Origin in international trade. ↩︎


7. Official U.S. government resource explaining the benefits and rules of free trade agreements. ↩︎


8. Official U.S. government guide on preparing commercial invoices for international trade. ↩︎


9. Official definition of the Harmonized System for classifying traded products. ↩︎


10. Authoritative Wikipedia entry providing a comprehensive overview of the Global Minimum Tax (Pillar Two) framework. ↩︎

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.

Upload CAD & Get Quote →

This article is part of DEWIN's technical manufacturing engineering knowledge base. Factory-specific details come from each factory's profile page — please verify current information there or with our team.