Tariffs on stamping parts from Vietnam can quietly eat your margin Carbon Border Adjustment Mechanism 1. I have watched buyers overpay duties for years simply because nobody on their team understood the EVFTA paperwork. When our Vietnam office first shipped stamped brackets to a European client, one missing certificate nearly cost the entire duty saving. The fix was not complicated — it was procedural. This article walks you through exactly how we do it now.
To reduce tariffs on stamping parts from Vietnam under the EVFTA, confirm your 8-digit HS code, prove Vietnamese origin under the Rules of Origin, obtain a EUR.1 Certificate of Origin (or self-certify below €6,000), and declare preferential treatment at the time of import.
Each of those steps has traps. Let me break them down one by one, in the order you should actually handle them.
What Is the EVFTA and How Can I Qualify for Its Tariff Benefits on Stamping Parts?
A purchasing manager once asked me why his stamped steel brackets still carried full EU duty. His supplier in Vietnam had never even applied for preferential treatment. That conversation is why this section exists.
The EVFTA is the EU-Vietnam Free Trade Agreement, in force since August 2020. It eliminates over 99% of tariffs between the two markets. Stamping parts qualify for preferential customs duties when they meet the agreement's Rules of Origin and carry valid proof of origin.
/12-05-2025-Pictures%20-%20Name/Hydraulic%20press%201.jpg)
The EVFTA is one of the most ambitious trade deals the EU has signed with a developing country. For sheet metal fabrication 2 businesses, the numbers matter. About 71% of duties on Vietnamese exports to the EU disappeared immediately in August 2020. The rest phase out gradually under the tariff elimination schedule.
Why the August 2027 Deadline Matters
Automotive parts, including many stamped components, faced EU import duties of up to 32% before the agreement. These duties are being removed in stages. Full elimination for car parts is scheduled for August 2027. That means the duty you pay today may still be a reduced transitional rate. Check your specific line every year, because the rate steps down annually.
Here is a simplified view of the phase-out structure:
| Category | Tariff Treatment | Timeline |
|---|---|---|
| Most industrial goods (Vietnam to EU) | Immediate elimination | August 2020 |
| Automotive parts (incl. stamping parts) | Gradual phase-out from up to 32% | Full elimination by August 2027 |
| Remaining tariff lines | Staged reduction | Up to 8 years (99.7% coverage) |
| Sensitive products | Tariff Rate Quotas (TRQs) | Zero duty within quota only |
First Step: Classify Your Part Correctly
Everything starts with HS Code classification 3. Stamped brackets like the ones we produce in Vietnam typically fall under Chapter 73 (articles of iron or steel) or Chapter 87 (parts for motor vehicles). The exact 8-digit code determines your tariff line, your phase-out year, and — critically — which origin rule applies. Our team always verifies the code against the EU's Access2Markets database 4 and Vietnam's implementing regulation, Decree No. 116/2022/NĐ-CP, before quoting a landed cost. A wrong code can mean a wrong rule, a rejected certificate, and a full-duty bill at Rotterdam or Hamburg.
One more note: if you previously imported under the Generalised Scheme of Preferences 5 (GSP), switch to EVFTA rates. For industrial components, the EVFTA now offers deeper and more stable reductions.
Which Rules of Origin Do I Need to Meet to Claim EVFTA Preferential Rates?
There is a trade-off we weigh on every stamping project: cheaper raw coil from a non-FTA source versus origin compliance. Get the balance wrong, and the duty saving vanishes.
Stamping parts qualify as originating if they are wholly obtained in Vietnam, or if non-originating materials undergo sufficient working or processing there — typically a Change in Tariff Heading (CTH) or non-originating material value not exceeding 50% of the ex-works price.

The Rules of Origin are the gatekeeper of the whole agreement. There are two pathways, and almost every stamping part travels the second one.
Pathway 1: Wholly Obtained
The part is made entirely from Vietnamese-sourced and Vietnamese-processed materials. For steel stampings, this is rare. Vietnam imports most of its coil and sheet.
Pathway 2: Sufficient Working or Processing
This is where the Product Specific Rules 6 (PSR) come in. For most stamped metal articles, the PSR requires one of the following:
| Origin Test | What It Means | Typical Application |
|---|---|---|
| Change in Tariff Heading (CTH) | The finished part sits in a different 4-digit heading than its input materials | Raw coil (e.g., heading 7208) transformed into a bracket (e.g., heading 7326) |
| Value limit on non-originating materials | Non-originating inputs must not exceed roughly 50% of the ex-works price | Parts with imported coil plus significant local labor and processing |
| Value-Added Content (VAC) | Local value added meets a minimum threshold, often 40% or more | Complex assemblies with multiple sourced inputs |
The good news for sheet metal fabrication: stamping, bending, punching, and heat treatment usually produce a genuine tariff classification change. When our Vietnam team converts imported steel coil into a finished bracket with folds, flanges, and punched mounting holes, that transformation typically satisfies the CTH rule.
The Ex-Works Price Advantage
The EVFTA lets you calculate value against the ex-works price, which includes local labor, factory overhead, and profit. This makes the 40–50% threshold easier to reach than many buyers assume. Document your cost breakdown carefully — labor hours, tooling amortization, local finishing like zinc galvanizing — because auditors will ask.
Cumulation and Material Sourcing
Bilateral cumulation lets EU-originating materials count as Vietnamese when incorporated into your part. Materials from countries holding their own EU FTA, such as South Korea, generally do not damage your origin position either. Materials from non-FTA countries can still be used, but they must pass the sufficient-processing test. Plan your supply chain around this before you cut the first blank.
How Do I Obtain the Correct Certificate of Origin for My Vietnam-Made Stamping Parts?
Early in our Vietnam operation, we learned a hard lesson: a EUR.1 application 7 filed late delayed a shipment by a week. Now our team starts the certificate process before goods leave the press shop.
For shipments over €6,000, obtain a Certificate of Origin Form EUR.1 from Vietnam's Ministry of Industry and Trade or an authorized agency. For shipments of €6,000 or less, the exporter may self-certify origin on the commercial invoice.
/ICHI-%20Photo/150-ton%20Stamping%20Press%20Machine%201.jpg)
The proof of origin is the document that converts your legal eligibility into an actual import duty exemption. Vietnam runs a threshold-based system, and choosing the right instrument matters for both cost and speed.
EUR.1 vs. Self-Certification at a Glance
| Feature | Certificate of Origin Form EUR.1 | Self-Certification (Origin Declaration) |
|---|---|---|
| Shipment value | Over €6,000 | €6,000 or less |
| Issuing party | Ministry of Industry and Trade (MoIT) or authorized agency | Exporter, on invoice or commercial document |
| Lead time | Days (application and approval required) | Immediate |
| Supporting evidence | Invoice, export declaration, packing list, raw material records | Same records must be kept on file |
| Best suited for | Full container loads, high-value orders | Samples, small consignments, spare-part runs |
The EUR.1 Application in Practice
Our Vietnam office prepares four core documents for every EUR.1 application: the commercial invoice, the export customs declaration, the packing list, and raw material records proving sufficient processing. The raw material records are where most exporters stumble. You need purchase invoices for the coil, production records showing the transformation, and a cost sheet supporting the origin calculation. Keep internal bookkeeping tidy — the MoIT can and does verify.
Do Not Forget the REX System
For traffic in the opposite direction — EU exporters shipping into Vietnam under the agreement — the Registered Exporter System REX applies. Vietnamese customs only accepts origin declarations from REX-registered EU exporters. If you run bilateral cumulation and bring EU materials into Vietnam, confirm your EU supplier's REX number is valid before relying on their declaration.
The €6,000 Threshold Strategy
For smaller consignments, self-certification saves real time. We use it for prototype batches and pre-production samples of stamped brackets. The compliance obligation does not disappear, though. You must hold the same origin evidence for at least five years, ready for a post-clearance audit.
What Documentation Should I Prepare to Avoid Customs Delays When Importing Under the EVFTA?
A buyer in Germany once told me his broker missed the preferential declaration at import and paid full duty on an entire container. Recovering that money proved painful. Documentation timing is everything.
Prepare the EUR.1 or origin declaration, commercial invoice, packing list, transport documents proving direct consignment, and raw material records. Declare EVFTA preference at the time of import — in Vietnam, post-import claims are not allowed, and code B25 must appear on the declaration.

Having originating goods and a valid certificate still is not enough. The claim must be made correctly, at the right moment, with a complete file. Here is the checklist our logistics team runs before every EVFTA shipment leaves Haiphong:
- Verify the 8-digit HS code matches on the invoice, the EUR.1, and the customs declaration.
- Confirm the EUR.1 is issued, stamped, and dated before or at shipment.
- Attach the commercial invoice and packing list with consistent quantities and values.
- Secure bill of lading evidence for the direct consignment rule.
- Instruct the customs broker, in writing, to claim EVFTA preference at entry.
- File all raw material and production records for the five-year retention period.
The Time-of-Import Rule
This is the single most expensive mistake in EVFTA practice. Vietnam does not permit claiming preferential treatment after importation. If your broker enters goods into Vietnam without the EVFTA preferential code B25 on the customs form, you pay full duty with no refund path. The EU is somewhat more forgiving — preferential treatment can sometimes be claimed after import within a limited window if valid proof follows — but you should never rely on that safety net. Treat every entry, in either direction, as a one-shot declaration.
The Direct Consignment Rule
Your stamping parts must travel directly from Vietnam to the EU. Transshipment through a third country is allowed only if the goods stay under customs supervision and undergo no further processing. If your parts stop in Singapore for consolidation, keep the through bill of lading and any non-manipulation certificate. Our door-to-door logistics management exists partly because broken transport documentation kills otherwise valid origin claims.
Prepare for Post-Clearance Audits
The EU increasingly audits after clearance rather than at the border. A digital origin management system — even a disciplined shared folder with coil invoices, press-shop travelers, and cost sheets — protects the duty savings you already banked. Looking ahead, also monitor the EU Carbon Border Adjustment Mechanism 8 (CBAM). Sourcing lower-carbon steel for your stampings may soon matter as much as the tariff rate itself.
Conclusion
High tariffs on stamping parts from Vietnam are avoidable, but only through discipline: correct HS codes, proven Rules of Origin, valid EUR.1 certificates, and on-time customs declarations. Audit your supply chain now — the August 2027 full-elimination milestone rewards those who prepare early.
Frequently Asked Questions
What Is the EVFTA and How Can I Qualify for Its Tariff Benefits on Stamping Parts?
A purchasing manager once asked me why his stamped steel brackets still carried full EU duty. His supplier in Vietnam had never even applied for preferential treatment. That conversation is why this section exists.
Which Rules of Origin Do I Need to Meet to Claim EVFTA Preferential Rates?
There is a trade-off we weigh on every stamping project: cheaper raw coil from a non-FTA source versus origin compliance. Get the balance wrong, and the duty saving vanishes.
How Do I Obtain the Correct Certificate of Origin for My Vietnam-Made Stamping Parts?
Early in our Vietnam operation, we learned a hard lesson: a EUR.1 application 7 filed late delayed a shipment by a week. Now our team starts the certificate process before goods leave the press shop.
Footnotes
1. Official EU source on CBAM, relevant to future carbon-related import costs. ↩︎
2. General background on the manufacturing process used to produce stamping parts. ↩︎
3. Explains the Harmonized System used to classify stamping parts for tariff purposes. ↩︎
4. Official EU tool referenced for verifying tariff codes and preferential rates. ↩︎
5. Background on the GSP scheme buyers switch from when adopting EVFTA rates. ↩︎
6. WTO resource explaining rules of origin criteria
