Skip to main content

🇻🇳 178 profiles · Engineering review

Vietnam Manufacturing

How Do Vietnam's Tax Incentives and Export Rebates Work for Sourcing Stamping Parts?

July 16, 2026

Finished-goods storage area at An Phuoc Thanh, a DEWIN-audited Vietnamese factory

Overview of Vietnam tax incentives and export rebates for stamping parts sourcing

When our Vietnam office first helped a US client navigate tax incentives for sourcing stamping parts, the savings surprised everyone—but the paperwork almost derailed the deal.

Vietnam’s tax incentives and export rebates for sourcing stamping parts include a 10% Corporate Income Tax rate for 15 years, 4-year tax holidays, full import duty exemptions on qualifying machinery and materials, and complete Value Added Tax refunds on inputs used in exported goods under Decree 57/2021/ND-CP.

These programs can dramatically lower your landed cost CPTPP 1. But understanding eligibility, documentation, and real-world application takes careful planning. Let me walk you through every layer of how these incentives work and how to capture them for your stamping part orders.

What tax incentives can I access when sourcing stamping parts from Vietnam?

A buyer we work with in Ohio once assumed Vietnam's incentives were only for large factories RCEP 2. He was wrong—and the discovery changed how he structured his entire supply chain diversification strategy away from China.

When sourcing stamping parts from Vietnam, you can access Corporate Income Tax exemptions at a preferential 10% rate for 15 years, a 4-year full tax holiday, 50% CIT reductions for 9 additional years, import duty exemptions on non-domestic machinery and raw materials, and VAT refunds on all exported goods.

Vietnam tax incentives including CIT exemptions, import duty waivers, and VAT refunds for stamping parts

How "Supporting Industry" Status Unlocks the Best Rates

Vietnam groups stamping parts under its "supporting industry" (SI) framework EVFTA 3. If your supplier produces components for automotive, electronics, or machinery sectors—and those parts appear on the prioritized list in Decree 111/2015/ND-CP—they likely qualify. Our team in Vietnam has helped multiple suppliers obtain their Certificate of Incentives for SI products, which is the key that unlocks all downstream benefits.

The standard Corporate Income Tax 4 rate in Vietnam is 20%. But qualifying SI manufacturers pay just 10% for up to 15 years. That is a massive gap. On top of that, the first four profitable years carry zero CIT. The next nine years get a 50% reduction. For a stamping factory generating steady revenue, this means well over a decade of significantly reduced tax burden.

CIT Incentive Tiers at a Glance

Incentive Type Standard Rate SI Manufacturer Rate Duration
Corporate Income Tax 20% 10% Up to 15 years
Tax Holiday (Full Exemption) None 0% CIT First 4 profitable years
Tax Reduction None 50% off CIT Following 9 years
SME Preferential Rate 20% 15–17% Ongoing (revenue < VND 50B)
Green/High-Tech Projects 20% 5–9% Up to 30–37 years

If the supplier has no taxable income in the first three years, the incentive clock starts in year four. This protects new stamping operations that need time to ramp up.

Import Duty Exemptions for Raw Materials

For export-oriented stamping manufacturers, Vietnam waives import duties entirely on machinery, equipment, and raw materials that cannot be produced domestically. Steel coils, aluminum alloys, specialized tooling—all can enter the country at 0% duty. This directly lowers the per-piece cost of your stamping brackets, clips, and mounting parts.

We have seen this matter most when a client needs specific grades of stainless steel or galvanized sheet metal that Vietnamese mills do not yet produce. The duty exemption removes what would otherwise be a 5–15% surcharge on critical inputs.

Additional Incentives Worth Knowing

Beyond CIT and import duties, qualifying stamping facilities can claim land rent exemptions in designated industrial zones and clusters. They can also allocate up to 20% of pre-tax profits into a tax-deductible R&D fund. Factories employing female staff or ethnic minorities receive further CIT reductions. These smaller benefits add up, especially over a multi-year sourcing relationship.

✔ Vietnam’s supporting industry CIT rate of 10% applies for up to 15 years, compared to the standard 20% rate True
Decree 57/2021/ND-CP explicitly grants this preferential rate to certified supporting industry manufacturers, including those producing stamping parts for automotive and electronics sectors.
✘ All stamping parts manufacturers in Vietnam automatically receive tax incentives False
Manufacturers must obtain a Certificate of Incentives for Supporting Industry products from a competent authority. Without this certification, no preferential tax rates or exemptions apply.
Video: Sample metal parts from audited Vietnamese factories in the DEWIN network. (@dewintech)

How do export rebates work for stamping parts shipped from Vietnam to the US?

One lesson I learned early in our export operations: the rebate is not a bonus check from the government. It is a systematic recovery of taxes your supplier already paid on inputs. Understanding the mechanics prevents both confusion and missed savings.

Export rebates for stamping parts shipped from Vietnam to the US work primarily through Value Added Tax refunds—manufacturers recover the 10% VAT paid on domestic inputs like utilities, services, and materials because exported goods carry a 0% VAT rate, effectively making all input VAT fully refundable upon proof of export.

Export rebate process showing VAT refunds on stamping parts shipped from Vietnam to the US

The VAT Refund Mechanism Explained

Vietnam's standard VAT rate is 10%, though certain goods temporarily carry an 8% rate under Decree 44/2023 through mid-2025. When a stamping factory buys steel coils, pays for electricity, or purchases lubricants for its presses, it pays VAT on all of those. Normally, that VAT is offset against the VAT charged on domestic sales. But exported goods are taxed at 0%. So the factory accumulates input VAT credits with no domestic output VAT to offset them against. The government then refunds those credits.

For a stamping operation running servo-presses and producing thousands of brackets per shift, the input costs are substantial. Recovering 10% of those costs through VAT refunds changes the math on every quotation we send to US buyers.

Export Processing Enterprise (EPE) Advantages

Some stamping facilities establish themselves as Export Processing Enterprises 5. An EPE operates as a "non-tariff zone" entity within Vietnam. This means it is exempt from both VAT and import duties on all production inputs from day one—no need to wait for refunds. Raw materials, tooling, and machinery enter duty-free and VAT-free.

The trade-off is that EPEs must export all output. They cannot sell domestically without paying duties as if importing. For our clients who source stamping parts exclusively for the US market, the EPE model is clean and efficient.

How Free Trade Agreements Multiply the Benefit

Vietnam's Free Trade Agreements 6 add another layer. Under the EVFTA 7 (EU-Vietnam), RCEP, and CPTPP, stamping parts exported from Vietnam may enter destination markets at reduced or zero tariffs—provided they meet Rules of Origin 8 criteria. For US-bound shipments, while no bilateral FTA exists, the general tariff treatment for Vietnamese stamping parts is still significantly more favorable than current rates on Chinese-origin parts. You can learn more about US import regulations and tariffs when sourcing stamping parts from Vietnam to understand how these rates compare in practice.

A proper Certificate of Origin 9 (C/O) is essential. Without it, your parts may not receive preferential treatment at the destination port. Our logistics team ensures every shipment includes the correct C/O documentation before it leaves the factory.

Rebate/Exemption Type How It Works Typical Value
VAT Refund (Standard Export) Input VAT refunded after proof of export 8–10% of input costs
EPE VAT Exemption No VAT charged on inputs from day one 10% saved upfront
EPE Import Duty Exemption All production inputs enter duty-free 0–15% saved on materials
FTA Tariff Reduction (Destination) Lower or zero tariffs at import country Varies by agreement
Temporary Admission (Tooling) Dies/molds imported duty-free for specific runs Full duty avoided

Temporary Admission for Tooling

High-value stamping dies and precision tooling can be imported under "temporary admission" status. This means the factory brings in specialized molds for a specific production run without paying import duties. Once the run is complete, the tooling is either re-exported or converted to permanent import with duties applied. This is valuable when we co-develop custom bracket designs with a US client and need to ship proprietary dies to Vietnam for production.

✔ Exported stamping parts carry a 0% VAT rate in Vietnam, making all input VAT fully refundable True
Vietnam’s tax code applies a 0% VAT rate to exported goods. Manufacturers recover input VAT through a formal refund process with the tax authority after providing proof of export.
✘ VAT refunds are automatically credited to the manufacturer’s account after each shipment False
VAT refunds require a formal application with supporting documentation, including export declarations and input invoices. Processing typically takes 30–60 days, and customs authorities may conduct Post-Clearance Audits 10 to verify scrap and waste ratios against actual stamping output.

What documentation do I need to qualify for Vietnam's tax and rebate programs?

During a recent supplier audit at a stamping facility near Hai Phong, I watched the factory manager pull out a filing cabinet full of rejected incentive applications. Every rejection traced back to one missing document or one misclassified product code. The paperwork matters as much as the production capability.

To qualify for Vietnam's tax and rebate programs, you need a Certificate of Incentives for Supporting Industry products, audited financial statements, an environmental impact assessment, a completed Form 01 dossier submitted to the Ministry of Industry and Trade, export customs declarations, input VAT invoices, and a valid Certificate of Origin for FTA-related benefits.

Required documentation and certificates to qualify for Vietnam's tax and rebate programs

The SI Certification Process Step by Step

The foundation is the Certificate of Incentives for Supporting Industry products. Without it, no CIT preferences or enhanced import duty exemptions apply. Here is how the process works in practice:

  1. Identify product eligibility. Check whether your stamping parts appear on the prioritized list in Decree 111/2015/ND-CP. Automotive mounting brackets, electronics chassis components, and machinery stampings generally qualify. Products listed in Circular 55/2015/BTC are excluded unless they meet EU technical standards.

  2. Prepare the dossier. This includes Form 01 (application form), audited financial statements for at least two years, an environmental impact assessment, proof of factory location, and technical documentation showing the stamping parts meet required specifications.

  3. Submit to MoIT. The Ministry of Industry and Trade reviews the application. The minimum processing time is 35 days, but in practice, it often runs longer—especially if the ministry requests additional documents or clarification.

  4. Receive certification. Once approved, the certificate is retroactive to the date of eligibility, not the date of approval. This matters for legacy operations that have been producing SI-qualifying parts before formal certification.

Documentation for VAT Refunds

To recover input VAT on exported stamping parts, the manufacturer must maintain complete records. This includes every input VAT invoice (for steel, electricity, tooling, services), export customs declarations proving the goods left Vietnam, and bank records confirming payment from the foreign buyer. Customs authorities now use Post-Clearance Audits to verify that the volume of duty-free raw materials consumed matches the actual stamping output. Scrap and waste ratios are closely monitored. Understanding how to manage tax invoices and financial compliance when sourcing from Vietnam is critical for ensuring your refund claims are never rejected.

Certificate of Origin for FTA Benefits

If the stamping parts are destined for a market covered by an FTA, a Certificate of Origin is essential. The C/O proves the parts were substantially manufactured in Vietnam and meet the specific Rules of Origin for that agreement. For the metal fabrication industry, this typically means demonstrating that the stamping, bending, and finishing processes occurred in Vietnam—not just final assembly.

Document Purpose Required For
SI Certificate (Form 01 Dossier) Unlocks CIT preferences and enhanced duty exemptions CIT incentives, import duty exemptions
Audited Financial Statements Proves profitability timeline for tax holiday calculation CIT holiday and reduction periods
Environmental Impact Assessment Compliance with Vietnam environmental regulations SI certification application
Export Customs Declarations Proves goods were exported VAT refund claims
Input VAT Invoices Documents VAT paid on production inputs VAT refund claims
Certificate of Origin (C/O) Proves Vietnam origin for FTA tariff benefits FTA preferential tariff treatment
Temporary Admission Permit Allows duty-free import of tooling for specific runs Temporary tooling imports
Bank Payment Records Confirms foreign buyer payment VAT refund verification

Common Pitfalls That Delay or Block Approval

From our experience managing supplier relationships across Vietnam, the most common failure points are: missing or incomplete environmental impact assessments, stamping products that fall under Circular 55's exclusion list without meeting EU standards, and audited financials that do not clearly separate SI-product revenue from other revenue streams. We always recommend that our partner factories engage a local tax consultant who specializes in SI certification before submitting their dossier.

How can I calculate the real cost savings from Vietnam's incentives for my stamping parts orders?

A trade-off I weigh on every project is whether the incentive savings are real or theoretical. On paper, the numbers look impressive. In practice, the answer depends on your supplier's certification status, your order volume, and how well the documentation is managed.

To calculate real cost savings, compare Vietnam's incentivized cost structure—10% CIT, 0% import duty on materials, full VAT refunds on exports—against the standard rates, then factor in documentation costs, processing delays, and your supplier's actual certification status to determine net savings of typically 12–18% on total landed cost.

Calculating real cost savings from Vietnam's tax incentives on stamping parts orders

A Hypothetical Cost Comparison

Let me walk through a realistic example. Consider a US buyer sourcing precision stamping brackets—similar to the galvanized steel mounting brackets and stainless steel spring clamps we regularly produce through our Vietnam partner network—at an annual order value of $500,000.

Cost Element Standard (No Incentives) With Full SI Incentives Savings
Raw Material Import Duty (8% avg) $40,000 $0 $40,000
VAT on Inputs (10%) $50,000 (not recovered) $50,000 (fully refunded) $50,000
Corporate Income Tax (20% vs 10%) $20,000 (on $100K profit) $10,000 $10,000
Tax Holiday (Years 1–4) $20,000 $0 $20,000
Compliance/Documentation Costs $0 -$5,000 -$5,000
Net Annual Savings — — $115,000 (first 4 years)

After the four-year tax holiday, the CIT savings drop to 50% reduction for nine years, then settle at the 10% preferential rate. But the import duty and VAT refund savings persist as long as the factory maintains its SI certification and export status.

What Affects Your Real Savings

Several factors determine whether you capture the full theoretical benefit:

Supplier certification status. If your stamping supplier has not yet obtained SI certification, you receive none of the CIT benefits. Our team verifies this during every supplier audit before recommending a factory.

Order volume and consistency. VAT refund claims are processed periodically. Small, irregular orders may not justify the administrative effort. Larger, steady programs generate reliable refund flows.

Material sourcing. Import duty exemptions apply only to materials and machinery that Vietnam cannot produce domestically. If your parts use standard carbon steel that Vietnamese mills produce, the duty exemption may not apply to raw materials—though it would still apply to specialized tooling and equipment.

EPE vs. standard factory. An Export Processing Enterprise eliminates the refund lag entirely but locks the factory into 100% export. For buyers with no interest in selling into Vietnam's domestic market, this is ideal.

The Global Minimum Tax Factor

Vietnam is implementing the 15% Global Minimum Tax in alignment with the OECD's Pillar Two framework. This means large multinational stamping operations benefiting from rates below 15% may face a top-up tax. Vietnam is responding by shifting some incentives from traditional tax holidays toward Qualified Refundable Tax Credits (QRTCs). For mid-sized stamping suppliers—the type we typically work with—the 10% CIT rate and existing incentives remain intact for now. But buyers should monitor this policy evolution, especially for high-value, long-term contracts. To understand how to leverage Vietnam-US trade agreements to reduce stamping part sourcing costs, it helps to stay current on these shifting policy frameworks.

Accelerated Depreciation for Advanced Equipment

Stamping facilities using high-efficiency servo-presses can qualify for accelerated depreciation of assets. This allows faster tax write-offs compared to traditional hydraulic or mechanical presses. The practical impact: factories investing in modern stamping equipment recover their capital costs sooner, which keeps piece prices competitive for buyers. When we evaluate potential suppliers, we look at their equipment age and depreciation strategy as indicators of long-term cost stability.

✔ The combination of CIT incentives, import duty exemptions, and VAT refunds can reduce total landed cost by 12–18% for qualifying stamping parts True
When all three incentive layers are active—preferential CIT, zero import duty on non-domestic materials, and full VAT refunds on exported goods—the cumulative savings consistently fall in the 12–18% range based on typical stamping production cost structures.
✘ Vietnam’s tax incentives automatically reduce the price quoted by your stamping supplier False
Tax incentives reduce the supplier’s cost structure, but whether those savings appear in your quoted price depends on negotiation, transparency, and whether the supplier has actually obtained SI certification. Buyers must verify certification and negotiate pricing accordingly.

Conclusion

Vietnam's tax incentives and export rebates offer genuine, measurable savings for sourcing stamping parts—but only when your supplier holds proper SI certification and you manage the documentation rigorously from the start.

Frequently Asked Questions

What tax incentives can I access when sourcing stamping parts from Vietnam?

A buyer we work with in Ohio once assumed Vietnam's incentives were only for large factories RCEP 2 . He was wrong—and the discovery changed how he structured his entire supply chain diversification strategy away from China.

How do export rebates work for stamping parts shipped from Vietnam to the US?

One lesson I learned early in our export operations: the rebate is not a bonus check from the government. It is a systematic recovery of taxes your supplier already paid on inputs. Understanding the mechanics prevents both confusion and missed savings.

What documentation do I need to qualify for Vietnam's tax and rebate programs?

During a recent supplier audit at a stamping facility near Hai Phong, I watched the factory manager pull out a filing cabinet full of rejected incentive applications. Every rejection traced back to one missing document or one misclassified product code. The paperwork matters as much as the production capability.

Footnotes


1. Background on the CPTPP trade pact mentioned as a tariff-reduction mechanism for exports. ↩︎


2. Explains the RCEP agreement cited alongside CPTPP and EVFTA for tariff benefits. ↩︎


3. Official EU source verifies EU-Vietnam Free Trade Agreement terms mentioned in the article. ↩︎


4. World Bank overview of Vietnam’s economy and tax structure supporting the CIT rate discussion. ↩︎


5. Background concept on export processing zones relevant to Vietnam’s EPE tax structure. ↩︎


6. WTO overview page on regional and free trade agreements affecting Vietnam’s export tariffs. ↩︎


7. Official EU trade page detailing the EU-Vietnam Free Trade Agreement referenced in tariff discussion. ↩︎


8. WTO’s official explanation of Rules of Origin criteria needed for FTA tariff eligibility. ↩︎


9. International Trade Centre resource on trade documentation including Certificate of Origin requirements. ↩︎


10. World Customs Organization resource on post-clearance audit procedures referenced in VAT compliance. ↩︎

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.

Upload CAD & Get Quote →

This article is part of DEWIN's technical manufacturing engineering knowledge base. Factory-specific details come from each factory's profile page — please verify current information there or with our team.

Quick Sourcing Inquiry