Single and double-row four-point contact ball slewing bearings spanning Ø200 mm to Ø5,000 mm are manufactured using 5m CNC vertical turning centers, high-precision gear hobbing, and medium-frequency induction hardening lines. Quality metrology is managed inside a 3,000 m² testing center aligned with ISO 9001, ISO 14001, ISO 45001, and third-party inspection agencies including CCS, ABS, NK, SGS, and BV.
> Key Takeaways: > - Dimensional Scope: Single and double-row four-point contact ball slewing bearings range from Ø200 mm up to Ø5,000 mm outer diameter. > - Machining & Thermal Processing: Inner and outer ring profiles are turned on 5m CNC vertical turning centers, gear teeth are shaped via CNC hobbing, and raceways are hardened using medium-frequency induction lines. > - Metrology & Inspection Framework: Quality verification occurs within a 3,000 m² R&D testing center backed by third-party inspection frameworks including CCS, ABS, NK, SGS, and BV under ISO 9001, ISO 14001, and ISO 45001 management systems. > - Production Scale & Regional Support: Manufacturing facilities produce up to 5,000 bearing sets monthly, supported by regional engineering service hubs in Xi'an and Ho Chi Minh City.
---
What Machining and Hardening Equipment Is Used for Slewing Bearings?
Manufacturing single and double-row four-point contact ball slewing bearings across large dimensional scales requires heavy machine tool infrastructure. Rings spanning from Ø200 mm to 5,000 mm outer diameter are processed on specialized machinery to satisfy structural load requirements in marine, heavy construction, and renewable energy application fields.
At production plants such as Xuzhou Wanda Slewing Bearing Co., Ltd. (XZWD) in Xuzhou, Jiangsu, 5m CNC vertical turning centers handle primary machining across a 118,667 m² plant footprint. The sequence integrates multi-axis turning, internal or external gear profile cutting, and localized heat treatment:
1. Ring Blank Turning: Large 5m CNC vertical turning centers execute rough and finish turning of inner and outer ring raceway geometries and mounting faces. 2. Gear Tooth Generation: Precision internal or external gear profiles are cut using CNC gear hobbing and gear shaping equipment. 3. Surface Thermal Treatment: Automated medium-frequency induction hardening lines apply targeted heat treatment to the raceway contact surfaces, imparting deep wear resistance while retaining toughness in the core ring structure. 4. Raceway Grinding: Post-hardening precision grinding restores tight raceway radii for smooth ball engagement and predictable four-point contact mechanics.
``mermaid graph TD A[Raw Forged Ring Preparation] --> B[5m CNC Vertical Turning Centers] B --> C[CNC Gear Hobbing & Shaping] C --> D[Medium-Frequency Induction Hardening] D --> E[Raceway Finish Grinding] E --> F[3,000 m² R&D Testing Center Inspection] F --> G[Final Bearing Assembly & Packaging] ``
For complementary precision machined elements, engineering teams coordinate with specialized regional hubs. On the DEWIN supplier directory, 179 Vietnamese suppliers are listed on file across 37 industrial categories, including 30 listed under CNC Machining and 11 under Precision Casting. Machine records on file show 38 suppliers listing cnc milling machine and 30 listing cnc lathe machine. Supplier profiles such as Thien Phuc Precision Co. Ltd list equipment including Bending machine 1, CNC Milling machine, and CNC lathe machine 1, supporting complementary turned components.
---
!Coordinate measuring machine used for dimensional inspection in a Vietnamese factory

How Are Quality Control and Metrology Managed for Slewing Bearings?
Managing rotational accuracy and load-bearing integrity across Ø200 mm to Ø5,000 mm bearing assemblies demands systematic metrological control. Large-diameter slewing bearings are subjected to severe axial, radial, and tilting-moment loading, requiring precise ball raceway engagement.
Operational metrology relies on a dedicated 3,000 m² R&D testing center staffed within an operation of 230+ technical and shop-floor personnel. Quality verification spans geometry validation, raceway depth evaluation, and gear pitch testing.
| Process Parameter | Machinery / Facility | Engineering Standard / Framework | | :--- | :--- | :--- | | Ring Turning (Ø200–5,000 mm) | 5m CNC Vertical Turning Centers | ISO 9001 Quality Management | | Gear Generation | CNC Gear Hobbing & Shaping | ISO 9001 Quality Management | | Raceway Surface Hardening | Medium-Frequency Induction Lines | Metallurgical Hardness Depth Protocol | | Metrology & Inspection | 3,000 m² R&D Testing Center | CCS, ABS, NK, SGS, BV Inspection Frameworks | | Environmental & Safety | Plant-wide Operations | ISO 14001, ISO 45001 Management Systems |
Third-party inspection frameworks and classification societies—including Bureau Veritas (BV), SGS, and marine classification bodies CCS, ABS, and NK—conduct facility evaluations alongside plant alignment with ISO 9001, ISO 14001, and ISO 45001. Dimensional metrology is augmented by specialized shop-floor CMM inventory; for example, database entries indicate 8 factories listing 3d cmm and 6 listing cmm machine, such as Mfc Trading Manufacture Joint Stock Company, whose listed equipment includes 3D CMM and CNC Milling machine.
---
!Assembly line in a Vietnamese factory
Which Production Capabilities Support High-Volume Bearing Sourcing?
High-volume sourcing strategies for four-point contact ball slewing bearings rely on steady throughput, unified plant routing, and multi-country logistics support. Facilities operating across a 118,667 m² plant footprint maintain a monthly manufacturing output reaching up to 5,000 sets across slewing bearing lines, encompassing single-row four-point contact, double-row four-point contact, three-row roller, and crossed-roller configurations.
``mermaid flowchart LR SubGraph1[Ring Fabrication & CNC Machining] --> SubGraph2[Induction Hardening & Grinding] SubGraph2 --> SubGraph3[3,000 m² Testing Metrology] SubGraph3 --> SubGraph4[Regional Hubs: Xi'an & Ho Chi Minh City] ``
To manage cross-border programs and dual-shore supply networks, engineering and procurement support is coordinated via regional service hubs located in Xi'an and Ho Chi Minh City. This structure enables technical design review, RFQ evaluation, and quality audit alignment across primary ring production and secondary sub-assemblies. Sourcing teams seeking precision turned rings or structural components can leverage CNC machining services or submit specifications to request a quote directly.
---
.jpg)
Precision Manufacturing & Sourcing Specification Matrix
| Technical Dimension | Standard Commercial Grade | High-Precision OEM Export Grade | DEWIN Verification Protocol |
|---|---|---|---|
| Machining & Forming Tolerance | ISO 2768-m (±0.10 mm nominal) | ISO 2768-f (±0.01 mm – ±0.025 mm critical bores) | Calibrated 3D CMM & Air/Pin Gauging |
| Surface Roughness & Finish | Ra 1.6 – 3.2 µm as-machined / standard coat | Ra 0.4 – 0.8 µm precision ground / MIL-A-8625 anodized | Profilometer & Coating Thickness Gauge |
| Material & Alloy Certification | Supplier Mill Test Report (MTR) | Independent OES chemical & mechanical verification | EN 10204 3.1 + RoHS/REACH Compliance |
| Batch Inspection & Packaging | ISO 2859-1 (AQL 1.0 Major / 2.5 Minor) | Zero-defect critical features + VCI export crating | Pre-Shipment Inspection (PSI) Report |