Each customer has its own unique performance requirements for the products to be customized. We timely understand its uniqueness by communication with customers and ensure that the performance of the products fully meets the needs of customers in the process of product production and testing.
Not long ago, a household appliance manufacturer ordered a batch of magnetic bushings from us. The raw materials required by customers are magnetic.
Magnetic requirements
After communicating with customers, we learned that this part is used on the charger of household appliances. However, the customer drawings we received only indicated the dimensions and tolerances of the product. Based on our previous manufacturing experience, we asked the customer whether they have corresponding requirements for the magnetic force of parts. At that time, the customer feedback was that he had not yet done the test, so there was no specific requirement for the magnetic force of the product, so we first carried out the mold opening and proofing and sent the sample to the customer. After the customer carries out the trial assembly test, the final parameter requirements and the specific requirements for the magnetic pull-out force of the product are given.
Detection equipment
After receiving the customer’s specific requirements, we purchased a special test device for the magnetic pull-out force of the product. Before the production of each batch of goods is completed, the magnetic pull-out force test shall be carried out to ensure that the magnetic pull-out force and other requirements of each batch of products are correct. The customer was very satisfied after receiving the goods, and this magnetic bushing completely met his standard.
Ensuring the quality of goods is the core requirement of serving customers. Dewin provides you with reliable services.
Precision Manufacturing & Sourcing Specification Matrix
| Technical Dimension | Standard Commercial Grade | High-Precision OEM Export Grade | DEWIN Verification Protocol |
|---|---|---|---|
| Machining & Forming Tolerance | ISO 2768-m (±0.10 mm nominal) | ISO 2768-f (±0.01 mm – ±0.025 mm critical bores) | Calibrated 3D CMM & Air/Pin Gauging |
| Surface Roughness & Finish | Ra 1.6 – 3.2 µm as-machined / standard coat | Ra 0.4 – 0.8 µm precision ground / MIL-A-8625 anodized | Profilometer & Coating Thickness Gauge |
| Material & Alloy Certification | Supplier Mill Test Report (MTR) | Independent OES chemical & mechanical verification | EN 10204 3.1 + RoHS/REACH Compliance |
| Batch Inspection & Packaging | ISO 2859-1 (AQL 1.0 Major / 2.5 Minor) | Zero-defect critical features + VCI export crating | Pre-Shipment Inspection (PSI) Report |
Frequently Asked Questions
What engineering files are required to quote performance test of magnetic bushing with DEWIN?
Provide 3D CAD models (STEP or IGES) along with 2D engineering drawings (PDF/DXF) specifying critical-to-quality (CTQ) tolerances, material grade, surface finish, and annual volume.
How does DEWIN verify dimensional accuracy and material compliance before shipment?
Every production lot undergoes incoming material spectrometer verification (EN 10204 3.1), First Article Inspection (FAI) via 2D/3D coordinate measuring machines (CMM), and AQL pre-shipment audits.
Can DEWIN support both low-volume prototype validation and mass production scaling in Vietnam and China?
Yes. DEWIN coordinates rapid CNC and bridge-tooling prototypes alongside high-tonnage production tooling across audited ISO 9001 and IATF 16949 partner factories in Vietnam and China.