Skip to main content

🇻🇳 178 profiles · Engineering review

Vietnam Manufacturing

Sinter Forged Connecting rod vs. Casting Connecting Rod

November 24, 2023

Production floor at Ontops Industry, a DEWIN-audited Vietnamese factory

The main difference between forged sintered connecting rods and cast connecting rods lies in their strength, durability, and cost. Forged sintered connecting rods have high strength and durability, while cast connecting rods have slightly lower strength and durability, and lower manufacturing costs.

Connecting rods, usually used in internal combustion engines, can be manufactured by casting or sintering forging. Choosing one of them largely depends on the application, performance requirements, and cost.

Controlled-atmosphere and induction heat-treatment furnace at Changzhi, a DEWIN-audited manufacturing facility

Sintering forging of connecting rods: Sintering is a forging process that involves placing powdered metal under high temperature and pressure to melt it into a solid. The advantages of sintered forged connecting rods include:
Strength: Forged connecting rods have greater strength because enormous pressure and heat are applied during the forging process.
Weight: Forged rods are lighter because their structure is denser, thereby reducing weight.
However, sintered forged connecting rods have higher production costs due to the complex manufacturing process.

Production floor at Ontops Industry, a DEWIN-audited Vietnamese factory

Casting connecting rods: The casting process involves pouring liquid metal into a mold, cooling it, and then removing the cast parts.
The advantages of casting connecting rods are:
Lower cost: Casting requires less processing, making it relatively cheaper.
Mass production: Castings are more suitable for large-scale production.
However, due to the casting process, there may be impurities and defects in the cast connecting rod, which may lead to structural defects. And they are usually heavier than similar forged products.

Sintered forged connecting rods have high strength and durability and are typically used in applications that require high performance and reliability, such as automotive and aviation engines. Although cast connecting rods have lower strength and durability, due to their lower cost, they are usually used in applications that do not strictly require high strength and durability, such as some industrial equipment and household appliances.

In summary, forged sintered connecting rods and cast connecting rods have their own characteristics and advantages, which are suitable for different scenarios. When choosing which type of connecting rod to use, it is necessary to comprehensively consider the specific situation and needs, and make appropriate choices based on factors such as strength, durability, and cost.

Thank you for reading our article. If you need related products or have any questions or suggestions about our products, please don’t hesitate to contact us by sending an email, and we will reply to your email as soon as possible.

Video: Plastic processing and die-casting production inside an audited Vietnamese factory. (@dewintech)

Precision Manufacturing & Sourcing Specification Matrix

Technical DimensionStandard Commercial GradeHigh-Precision OEM Export GradeDEWIN Verification Protocol
Machining & Forming ToleranceISO 2768-m (±0.10 mm nominal)ISO 2768-f (±0.01 mm – ±0.025 mm critical bores)Calibrated 3D CMM & Air/Pin Gauging
Surface Roughness & FinishRa 1.6 – 3.2 µm as-machined / standard coatRa 0.4 – 0.8 µm precision ground / MIL-A-8625 anodizedProfilometer & Coating Thickness Gauge
Material & Alloy CertificationSupplier Mill Test Report (MTR)Independent OES chemical & mechanical verificationEN 10204 3.1 + RoHS/REACH Compliance
Batch Inspection & PackagingISO 2859-1 (AQL 1.0 Major / 2.5 Minor)Zero-defect critical features + VCI export cratingPre-Shipment Inspection (PSI) Report

Frequently Asked Questions

What engineering files are required to quote sinter forged connecting rod vs. casting connecting rod with DEWIN?

Provide 3D CAD models (STEP or IGES) along with 2D engineering drawings (PDF/DXF) specifying critical-to-quality (CTQ) tolerances, material grade, surface finish, and annual volume.

How does DEWIN verify dimensional accuracy and material compliance before shipment?

Every production lot undergoes incoming material spectrometer verification (EN 10204 3.1), First Article Inspection (FAI) via 2D/3D coordinate measuring machines (CMM), and AQL pre-shipment audits.

Can DEWIN support both low-volume prototype validation and mass production scaling in Vietnam and China?

Yes. DEWIN coordinates rapid CNC and bridge-tooling prototypes alongside high-tonnage production tooling across audited ISO 9001 and IATF 16949 partner factories in Vietnam and China.

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.

Upload CAD & Get Quote →

This article is part of DEWIN's technical manufacturing engineering knowledge base. Factory-specific details come from each factory's profile page — please verify current information there or with our team.

Quick Sourcing Inquiry