Slewing Bearing Development

December 23, 2022

Finished parts at Chin Well, a DEWIN-audited Vietnamese factory

Optical emission spectrometer (OES) for alloy chemical verification at LONG VAN COMPANY LIMITED, a DEWIN-audited manufacturing facility

For the development of new products, customers often can only provide a general idea or sketch, and the required products often involve new areas, which requires our team to have rich experience and profound understanding of the machinery industry, be able to quickly investigate the market for any kind of product, and identify the most professional and suitable suppliers.

Recently, we helped an old customer to develop a new product. The old customer is the manufacturer of armored vehicles. The revolving tower on the top of the armored vehicle will use the slewing bearing. He hopes that we can help him develop it.

Looking for suppliers

At the beginning of this project, the customer only provided the inner diameter, outer diameter and maximum bearing max load of the bearing. Our purchasing team extensively searched for and screened suppliers with bearings of similar size in the market to provide customers with choices. Finally, the customer selected a supplier.

After communicating with the factory, we sent the catalogue to the customer for selection. The customer chose one of them and wants to place a large order for 800pcs immediately. We recommend that the customer not buy so much at once, but can first place a sample list for testing. The customer listened to our suggestions and bought a sample. It was found that there were some mismatches in this sliding bearing. Moreover, this supplier only produces standard type bearings, and has no ability to customize products.

Sample testing

We re selected a bearing supplier with customized processing capacity for the customer, designed three drawings with the same size but different installation structures for the customer, and produced 12 samples for each design for the customer to test.

Coating and finishing line at Hahuco Viet Nam, a DEWIN-audited Vietnamese factory1.Unspecified chamfer: 1.0×45°

Through hole chamfer: 1.0×45°

2.Raceway of inner & outer ring induction hardened, hardness: 55~62HRC

Depth:≥3.0mm

3.Inner & outer ring quenched & tempered, hardness: 207-262HB

4.Radial clearance: 0.15~0.40 mm

Axial clearance: 0.15~0.40 mm

 

 

Later, we learned that this project is a new bidding project of the customer. It is very helpful for the customer to win this project by quickly completing the design and putting it into production. We are glad that our professional experience and dolphin service can help the customer.

Video: High-tensile industrial webbing looms operating inside a Vietnamese textile factory. (@dewintech)

Precision Manufacturing & Sourcing Specification Matrix

Technical DimensionStandard Commercial GradeHigh-Precision OEM Export GradeDEWIN Verification Protocol
Machining & Forming ToleranceISO 2768-m (±0.10 mm nominal)ISO 2768-f (±0.01 mm – ±0.025 mm critical bores)Calibrated 3D CMM & Air/Pin Gauging
Surface Roughness & FinishRa 1.6 – 3.2 µm as-machined / standard coatRa 0.4 – 0.8 µm precision ground / MIL-A-8625 anodizedProfilometer & Coating Thickness Gauge
Material & Alloy CertificationSupplier Mill Test Report (MTR)Independent OES chemical & mechanical verificationEN 10204 3.1 + RoHS/REACH Compliance
Batch Inspection & PackagingISO 2859-1 (AQL 1.0 Major / 2.5 Minor)Zero-defect critical features + VCI export cratingPre-Shipment Inspection (PSI) Report

Frequently Asked Questions

What engineering files are required to quote slewing bearing development with DEWIN?

Provide 3D CAD models (STEP or IGES) along with 2D engineering drawings (PDF/DXF) specifying critical-to-quality (CTQ) tolerances, material grade, surface finish, and annual volume.

How does DEWIN verify dimensional accuracy and material compliance before shipment?

Every production lot undergoes incoming material spectrometer verification (EN 10204 3.1), First Article Inspection (FAI) via 2D/3D coordinate measuring machines (CMM), and AQL pre-shipment audits.

Can DEWIN support both low-volume prototype validation and mass production scaling in Vietnam and China?

Yes. DEWIN coordinates rapid CNC and bridge-tooling prototypes alongside high-tonnage production tooling across audited ISO 9001 and IATF 16949 partner factories in Vietnam and China.

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.