Today we share a case where we produced accessories for a world-renowned Off-Road vehicles brand. This client wants to make a batch of stainless steel bands as accessories for their fuel tanks. He provided us with the design drawing of the accessory, and we produced it.

Although we have cooperated with this client for many years, we still develop products strictly according to the process to ensure that the products and services we provide satisfy the client.

Supplier Selection

Finished parts at Quan Pham Electrical Equipment Industry, a DEWIN-audited Vietnamese factory

Based on our mastery of the information and technologies of many auto parts factories, we first screened out several suitable factories as pending options according to the manufacturing conditions of the parts. Then our SQE went to these factories for on-the-spot inspection and factory inspection. We inspected and recorded the product category, most competitive products, production capacity, leading production equipment, raw material, and other information of each factory, and then issued a dolphin report on each factory for the client.

The content of the dolphin report includes information about the factory and our evaluation of the factory in various aspects. Besides, we compare several dolphin reports and provide a copy of our proposal for the client’s reference. Finally, the client chose a factory that was suitable in all aspects based on our suggestions.

Performance Testing

The client’s performance testing requirements exceed the existing test capacity of the factory. The DEWIN team helped the client to contact a professional third-party testing organization, connected with the factory engineer, and finally completed the performance test. The product quality met the client’s requirements. Details are as follows:

Sample Description

The client submitted a 1pc sample for testing. The sample description is shown in Table. The representative appearance photo of the model before the test was conducted in Fig.1

CNC milling machine cutting a part at Alpha Fastener, a DEWIN-audited Vietnamese factory

 

Testing Method
According to < GB/T 228.1-2010 Metallic materials -Tensile testing -Part 1: Method of test at room temperature>&the client’s requirements, Tensile tests were performed. The testing
process photos are shown in Fig. 2

CNC milling machine cutting a part at Minh Trung Plastic & Mechanical, a DEWIN-audited Vietnamese factory

CNC milling machine cutting a part at Chau Minh Long, a DEWIN-audited Vietnamese factory

Test Result
Tensile test results are shown in table2. The photo after tested is shown in Fig. 3

CNC milling machine cutting a part at Industrial Mechanics And Automation, a DEWIN-audited Vietnamese factory

 

Due to our careful work and strict service procedures every time, we have reached good long-term cooperation with this client.

Video: Stainless steel pipe production at an audited Vietnamese manufacturer. (@dewintech)

Engineering & Production Specification Matrix

Process ParameterPrototype / Short-Run StandardProduction Progressive / Hard-Tool StandardVerification Method
Linear Dimensional Tolerance±0.10 mm to ±0.15 mm (ISO 2768-m)±0.03 mm to ±0.08 mm (ISO 2768-f)Optical 2D/3D CMM & Go/No-Go Check Fixtures
Edge Burr Height Limit≤ 10% of material thickness≤ 5%–8% of material thicknessDigital Micrometer & Cross-Section Audit
Material & Coating TraceabilityMill Test Certificate (EN 10204 3.1)Heat-lot MTC + RoHS/REACH + ASTM B117 Salt-SpraySpectrometer (OES) & XRF Screening
Standard Tooling & Lead TimeLaser + CNC Press Brake (5–10 days)Progressive / Transfer Die (3–5 weeks T1)First Article Inspection (FAI) & CPK ≥ 1.33

Frequently Asked Questions

What engineering files are required to quote stainless steel sheet development with DEWIN?

Provide 3D CAD models (STEP or IGES) along with 2D engineering drawings (PDF/DXF) specifying critical-to-quality (CTQ) tolerances, material grade, surface finish, and annual volume.

How does DEWIN verify dimensional accuracy and material compliance before shipment?

Every production lot undergoes incoming material spectrometer verification (EN 10204 3.1), First Article Inspection (FAI) via 2D/3D coordinate measuring machines (CMM), and AQL pre-shipment audits.

Can DEWIN support both low-volume prototype validation and mass production scaling in Vietnam and China?

Yes. DEWIN coordinates rapid CNC and bridge-tooling prototypes alongside high-tonnage production tooling across audited ISO 9001 and IATF 16949 partner factories in Vietnam and China.

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.