Skip to main content

🇻🇳 178 profiles · Engineering review

Hdp Precision Mechanical Engineering factory overview
Sheet MetalDEWIN On-Ground Audited

Hdp Precision Mechanical Engineering

HDP PRECISION MECHANICAL ENGINEERING COMPANY LIMITED

Location
Vietnam

Factory Overview

Hdp Precision Mechanical Engineering is a verified sheet metal manufacturer in Vietnam with 49 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Sheet Metal components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

15 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: HDP - Business license.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: HDP - Dolphin report 20241007.docx
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: HDP - ISO 90012015 certificate.pdf
Secure Download

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: HDP - Business license.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: HDP - Dolphin report 20250624.docx
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: HDP - ISO 90012015 certificate.pdf
Secure Download

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: HDP - Business license.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: HDP - Dolphin report 20250624.docx
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: HDP - ISO 90012015 certificate.pdf
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: HDP - List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: HDP - QCLDM Score 20241203.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: HDP - QCLDM Score 20250624.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: HDP - List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: HDP - QCLDM Score 20250624.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: HDP - List of equipment.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

219 photos
Accessories sample

Accessories sample

Factory Overview
CNC milling machine

CNC milling machine

Production Line
CNC vertical machining center 2

CNC vertical machining center 2

Quality Control
CNC vertical machining center

CNC vertical machining center

Equipment
Chemical tank

Chemical tank

Production Line
EDM machine

EDM machine

Quality Control
Engineer team

Engineer team

Equipment
Grinding machine 2

Grinding machine 2

Production Line
Grinding machine

Grinding machine

Quality Control
Hardness testing

Hardness testing

Equipment
Inspection MAP table

Inspection MAP table

Production Line
Inspection area

Inspection area

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Sheet MetalLaser CuttingWeldingBending

Equipment Logs

  • 2D Measuring Machine
  • Bending Machine
  • CNC Milling Machine
  • Lathe Machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry