Skip to main content

🇻🇳 178 profiles · Engineering review

Ming Chuan Electronic Technology Vietnam factory overview
Outdoor Power EquipmentDEWIN On-Ground Audited

Ming Chuan Electronic Technology Vietnam

MING CHUAN ELECTRONIC TECHNOLOGY VIETNAM COMPANY LIMITED

Location
Vietnam

Factory Overview

Ming Chuan Electronic Technology Vietnam is a verified outdoor power equipment manufacturer in Vietnam with 194 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

Outdoor Power Equipment components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

6 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: MC - Business license.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: MC - Dolphin report 20250827.docx
Secure Download

ISO 9001:2015 Certification

Certification

Certified Quality Management System (QMS) standard for international trade compliance.

File: MC - ISO 90012015 certificate.pdf
Secure Download

MC - Factory introduction video 20250919(1).xlsx

Document

Verified supplier archive file.

File: MC - Factory introduction video 20250919(1).xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: MC - QCLDM Score 20250827.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: MC - List of equipment.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

194 photos
MC  - Company information

MC - Company information

Factory Overview
5S  ISO standard-compliant finished goods warehouse

5S ISO standard-compliant finished goods warehouse

Production Line
Barcode label showing item code, quantity, and stock location

Barcode label showing item code, quantity, and stock location

Quality Control
Color Comparison Machine Operation Instruction

Color Comparison Machine Operation Instruction

Equipment
Color Inspection Machine Checklist

Color Inspection Machine Checklist

Production Line
Color comparison machine

Color comparison machine

Quality Control
Colorimeter

Colorimeter

Equipment
Company Quality Objectives

Company Quality Objectives

Production Line
Company Quality Policy

Company Quality Policy

Quality Control
Company reception with front desk and waiting area

Company reception with front desk and waiting area

Equipment
Compliance with ISO procedures

Compliance with ISO procedures

Production Line
Consolidation area before dispatch to transport team

Consolidation area before dispatch to transport team

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

Outdoor Power Equipment

Equipment Logs

  • Color Comparison Machine Operation Instruction
  • Conveyor Belt for Transferring Products After Injection Molding Machine
  • Lathe machine

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry