Skip to main content

🇻🇳 178 profiles · Engineering review

Napec factory overview
CNC MachiningDEWIN On-Ground Audited

Napec

NAPEC COMPANY LIMITED

Location
Vietnam

Factory Overview

Napec is a verified cnc machining manufacturer in Vietnam with 76 factory photos. Personally audited by our on-ground team, serving international clients worldwide.

Main Production Focus

CNC Machining components and assemblies

Direct R2 Sourcing Verification

Transparent Trust Vault

15 files audited

Unlike traditional brokers, DEWIN gives US buyers complete transparency. Below are the actual government licenses, equipment score sheets, and proprietary 50-point Dolphin QA reports saved securely in our **Cloudflare R2 vault** and compiled directly for you.

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: NP- Business license.PDF
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: NP - Dolphin report 20250513.docx
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: NP - Dolphin report 20250513.docx
Secure Download

Government Business Registration

Legal

Official Vietnamese business license and corporate registration, fully verified by DEWIN legal counsel.

File: TPH - Business license.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: TPH - Dolphin report 20240806.docx
Secure Download

Napec Factory Catalog

Profile

Official manufacturer profile, dimensional product catalogs, and surface finish options.

File: VSM - Brochure.pdf
Secure Download

DEWIN Dolphin Audit Report

Dolphin Audit

Proprietary 50-point factory audit covering capacity, worker compliance, and safety standards.

File: VSM - Dolphin report 20241018.docx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: NP- QCLDM Score 20250513.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: NP- List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: NP- QCLDM Score 20250513.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: NP- List of equipment.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: TPH - List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: TPH - QCLDM Score 20240806.xlsx
Secure Download

Verified Machine & Capacity List

Equipment Log

Complete list of active machinery including CNC milling, lathes, stamping presses, and QC metrology.

File: VSM - List of equipment.xlsx
Secure Download

QA & Landed Cost Log (QCLDM)

Scorecard

50-point dimensional, quality, cost, and logistics scorecard scorecard logged by DEWIN local QA.

File: VSM - QCLDM Score 20241018.xlsx
Secure Download

On-Site Visual Audit

High-Resolution verified shop floor logs

241 photos
NP - Company information 1

NP - Company information 1

Factory Overview
NP - Company information 2

NP - Company information 2

Production Line
5S method implementation guide 1

5S method implementation guide 1

Quality Control
5S method implementation guide 2

5S method implementation guide 2

Equipment
Assembly area

Assembly area

Production Line
CMM machine

CMM machine

Quality Control
CNC milling machine 1

CNC milling machine 1

Equipment
CNC milling machine 2

CNC milling machine 2

Production Line
CNC milling machine 3

CNC milling machine 3

Quality Control
CNC milling machine 4

CNC milling machine 4

Equipment
CNC milling machine 5

CNC milling machine 5

Production Line
CNC milling machine 6

CNC milling machine 6

Quality Control

Location

Vietnam, Vietnam

Verified geographic logistics hub matching global maritime routes to HCMC and Haiphong ports.

DEWIN audit score

Not yet audited by DEWIN. This page is a directory record; request a factory audit before placing an order.

Capabilities

CNC MillingCNC TurningPrecision Machining

Equipment Logs

  • CMM machine
  • Lathe machine 1

Verified Certifications

Dewin Verified

Engage This Factory

Get an interactive landed cost quote routed directly to this verified workshop.

Request Direct RFQRequest this factory for your quote
← Back to Supplier Directory

Quick Sourcing Inquiry