Skip to main content

🇻🇳 178 profiles · Engineering review

Vietnam Manufacturing

Vietnam – Manufacturing Plastic Injection and Die Casting Mold Factory

May 12, 2025

Injection moulding machine at Kahong, a DEWIN-audited Vietnamese factory
Production floor at Kobayashi Casting, a DEWIN-audited Vietnamese factory
Production floor at Kobayashi Casting, a DEWIN-audited Vietnamese factory.
Video: Plastic processing and die-casting production inside an audited Vietnamese factory. (@dewintech)

Polymer & Tooling Engineering Comparison Matrix

Engineering CriterionBridge / Soft Tooling (P20 / 718H)High-Volume Production Tooling (H13 / S136)Quality Control Gate
Mold Steel & Cavity Life50,000 – 100,000 shots (Pre-hardened steel)500,000 – 1,000,000+ shots (Vacuum heat-treated)Steel Hardness (HRC) & Cavity CMM Report
Dimensional ToleranceDIN 16742 TG5 / Commercial standardDIN 16742 TG3–TG4 / Fine engineering gradeT0/T1/T2 30-Piece Capability Study
Wall Thickness & Draft Angle1.5 mm – 4.0 mm wall; 1.0°–1.5° minimum draftUniform ±10% nominal wall; textured draft ≥ 2.5°Moldflow Simulation & Cross-Section Check
Resin & Regulatory ComplianceVirgin resin lot certificate + COAUL94, RoHS, REACH, FDA / ISO 10993 traceabilityDSC Melt-Flow & Moisture Analyzer Check

Frequently Asked Questions

What engineering files are required to quote vietnam – manufacturing plastic injection and die casting mold factory with DEWIN?

Provide 3D CAD models (STEP or IGES) along with 2D engineering drawings (PDF/DXF) specifying critical-to-quality (CTQ) tolerances, material grade, surface finish, and annual volume.

How does DEWIN verify dimensional accuracy and material compliance before shipment?

Every production lot undergoes incoming material spectrometer verification (EN 10204 3.1), First Article Inspection (FAI) via 2D/3D coordinate measuring machines (CMM), and AQL pre-shipment audits.

Can DEWIN support both low-volume prototype validation and mass production scaling in Vietnam and China?

Yes. DEWIN coordinates rapid CNC and bridge-tooling prototypes alongside high-tonnage production tooling across audited ISO 9001 and IATF 16949 partner factories in Vietnam and China.

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.

Upload CAD & Get Quote →

This article is part of DEWIN's technical manufacturing engineering knowledge base. Factory-specific details come from each factory's profile page — please verify current information there or with our team.

Quick Sourcing Inquiry