
Polymer & Tooling Engineering Comparison Matrix
| Engineering Criterion | Bridge / Soft Tooling (P20 / 718H) | High-Volume Production Tooling (H13 / S136) | Quality Control Gate |
|---|---|---|---|
| Mold Steel & Cavity Life | 50,000 – 100,000 shots (Pre-hardened steel) | 500,000 – 1,000,000+ shots (Vacuum heat-treated) | Steel Hardness (HRC) & Cavity CMM Report |
| Dimensional Tolerance | DIN 16742 TG5 / Commercial standard | DIN 16742 TG3–TG4 / Fine engineering grade | T0/T1/T2 30-Piece Capability Study |
| Wall Thickness & Draft Angle | 1.5 mm – 4.0 mm wall; 1.0°–1.5° minimum draft | Uniform ±10% nominal wall; textured draft ≥ 2.5° | Moldflow Simulation & Cross-Section Check |
| Resin & Regulatory Compliance | Virgin resin lot certificate + COA | UL94, RoHS, REACH, FDA / ISO 10993 traceability | DSC Melt-Flow & Moisture Analyzer Check |
Frequently Asked Questions
What engineering files are required to quote vietnam – plastic manufacturing machinery with DEWIN?
Provide 3D CAD models (STEP or IGES) along with 2D engineering drawings (PDF/DXF) specifying critical-to-quality (CTQ) tolerances, material grade, surface finish, and annual volume.
How does DEWIN verify dimensional accuracy and material compliance before shipment?
Every production lot undergoes incoming material spectrometer verification (EN 10204 3.1), First Article Inspection (FAI) via 2D/3D coordinate measuring machines (CMM), and AQL pre-shipment audits.
Can DEWIN support both low-volume prototype validation and mass production scaling in Vietnam and China?
Yes. DEWIN coordinates rapid CNC and bridge-tooling prototypes alongside high-tonnage production tooling across audited ISO 9001 and IATF 16949 partner factories in Vietnam and China.
