As a strong foreign trade company, we not only have a branch in Vietnam, but also closely cooperate with high-quality factories to provide customers with comprehensive services.
The factory we visited on site this week is highly distinctive, with nearly 36 years of experience in precision engineering. The factory was established in 1989 and currently has two workshops located in Ho Chi Minh City and Thu Duc City.
In terms of business, the factory has outstanding professional capabilities. Firstly, proficient in designing and manufacturing various types of molds; Secondly, we can design and produce professional mechanical equipment, as well as high-precision and durable tools and fixtures for our clients; Thirdly, skilled in processing precision mechanical parts; Fourthly, advanced metal powder sintering technology is used to manufacture components.
This factory mainly serves joint ventures and multinational corporations operating in Vietnam, and its products are exported to countries such as the United States, Canada, Japan, France, and Italy. To ensure product quality and meet customer needs, the factory has implemented the ISO 9001-2000 quality management system since 2004 and has obtained certifications from DNV (Norway) and UKAS (UK).
Our supply chain layout in Vietnam is well-established, and working with such excellent factories can provide customers with more efficient and high-quality services. We welcome customers to work together with us.

Precision Manufacturing & Sourcing Specification Matrix
| Technical Dimension | Standard Commercial Grade | High-Precision OEM Export Grade | DEWIN Verification Protocol |
|---|---|---|---|
| Machining & Forming Tolerance | ISO 2768-m (±0.10 mm nominal) | ISO 2768-f (±0.01 mm – ±0.025 mm critical bores) | Calibrated 3D CMM & Air/Pin Gauging |
| Surface Roughness & Finish | Ra 1.6 – 3.2 µm as-machined / standard coat | Ra 0.4 – 0.8 µm precision ground / MIL-A-8625 anodized | Profilometer & Coating Thickness Gauge |
| Material & Alloy Certification | Supplier Mill Test Report (MTR) | Independent OES chemical & mechanical verification | EN 10204 3.1 + RoHS/REACH Compliance |
| Batch Inspection & Packaging | ISO 2859-1 (AQL 1.0 Major / 2.5 Minor) | Zero-defect critical features + VCI export crating | Pre-Shipment Inspection (PSI) Report |
Frequently Asked Questions
What engineering files are required to quote vietnam supply chain: unlocking powerful factories with DEWIN?
Provide 3D CAD models (STEP or IGES) along with 2D engineering drawings (PDF/DXF) specifying critical-to-quality (CTQ) tolerances, material grade, surface finish, and annual volume.
How does DEWIN verify dimensional accuracy and material compliance before shipment?
Every production lot undergoes incoming material spectrometer verification (EN 10204 3.1), First Article Inspection (FAI) via 2D/3D coordinate measuring machines (CMM), and AQL pre-shipment audits.
Can DEWIN support both low-volume prototype validation and mass production scaling in Vietnam and China?
Yes. DEWIN coordinates rapid CNC and bridge-tooling prototypes alongside high-tonnage production tooling across audited ISO 9001 and IATF 16949 partner factories in Vietnam and China.
/Essence%20-%20Photo/Products%20(1).jpg)