The common materials used for sintered metal filters include stainless steel (such as 304, 316, 316L, etc.), nickel and nickel based alloys, titanium and titanium alloys, and copper or copper alloys. The specific material used depends on the specific environment and requirements of the filter.
Sintered metal filters are one of the important tools used in the filtration industry. It is widely used in the pharmaceutical, petrochemical, food and beverage industries. The material selection of sintered metal filters largely determines their efficiency, strength, and diversity of applications.
What is a sintered metal filter?
Sintered metal filters are filtration equipment made using high-temperature sintering. It is usually made of stainless steel or other high-temperature resistant metals such as nickel, titanium, etc. This type of filter is formed by high-temperature sintering of metal particles, forming a uniform pore-open structure.
During the sintering process, metal particles will partially melt at extremely high temperatures, and the contact points between the particles will “stick” together, forming a strong and resilient block. The sintered product has high porosity, good gas permeability, and excellent filtration performance, and is widely used in industries such as petroleum, chemical, metallurgy, and machinery.
/12-05-2025-Pictures%20-%20Name/Hydraulic%20press%201.jpg)
What material is sintered metal filter made of?
1. Stainless steel: such as 304, 316/316L, etc. Stainless steel has good corrosion resistance, heat resistance, and mechanical strength, making it the most commonly used material for manufacturing sintered filters.
2. Titanium and titanium alloys: Titanium and titanium alloys have excellent corrosion resistance and are suitable for use in environments such as strong acids and alkalis.
3. Gilt metal: Gilt metal has excellent corrosion resistance and high-temperature performance, so it is often used as a filter medium in some high-temperature, high-pressure, and corrosive environments.
4. Steel: such as carbon steel, low alloy steel, etc. Although they have poor corrosion resistance, their cost is low and they are suitable for use in specific non-corrosive environments.
5. Copper and copper alloys: They have good corrosion resistance, thermal conductivity, and excellent mechanical properties at Fahrenheit temperature.
6. Nickel and nickel alloys: such as lconel alloys, single-sided alloys, Hastelloy alloys, etc. These materials are highly corrosion and heat resistant, suitable for extreme environments.
The above are common manufacturing materials for sintered metal filters. These materials can be used alone or in combination to achieve the required filtration performance. Different materials are suitable for different application environments, and selecting suitable materials requires consideration of factors such as filtration medium, temperature, pressure, and corrosiveness.
Thank you for reading our article. If you need related products or have any questions or suggestions about our products, please don’t hesitate to contact us by sending an email, and we will reply to your email as soon as possible.
Precision Manufacturing & Sourcing Specification Matrix
| Technical Dimension | Standard Commercial Grade | High-Precision OEM Export Grade | DEWIN Verification Protocol |
|---|---|---|---|
| Machining & Forming Tolerance | ISO 2768-m (±0.10 mm nominal) | ISO 2768-f (±0.01 mm – ±0.025 mm critical bores) | Calibrated 3D CMM & Air/Pin Gauging |
| Surface Roughness & Finish | Ra 1.6 – 3.2 µm as-machined / standard coat | Ra 0.4 – 0.8 µm precision ground / MIL-A-8625 anodized | Profilometer & Coating Thickness Gauge |
| Material & Alloy Certification | Supplier Mill Test Report (MTR) | Independent OES chemical & mechanical verification | EN 10204 3.1 + RoHS/REACH Compliance |
| Batch Inspection & Packaging | ISO 2859-1 (AQL 1.0 Major / 2.5 Minor) | Zero-defect critical features + VCI export crating | Pre-Shipment Inspection (PSI) Report |
Frequently Asked Questions
What engineering files are required to quote what are the common materials of sintered metal filter? with DEWIN?
Provide 3D CAD models (STEP or IGES) along with 2D engineering drawings (PDF/DXF) specifying critical-to-quality (CTQ) tolerances, material grade, surface finish, and annual volume.
How does DEWIN verify dimensional accuracy and material compliance before shipment?
Every production lot undergoes incoming material spectrometer verification (EN 10204 3.1), First Article Inspection (FAI) via 2D/3D coordinate measuring machines (CMM), and AQL pre-shipment audits.
Can DEWIN support both low-volume prototype validation and mass production scaling in Vietnam and China?
Yes. DEWIN coordinates rapid CNC and bridge-tooling prototypes alongside high-tonnage production tooling across audited ISO 9001 and IATF 16949 partner factories in Vietnam and China.
