Skip to main content

🇻🇳 178 profiles · Engineering review

Vietnam Manufacturing

What are the common materials of sintered metal filter?

September 8, 2023

Production floor at Ontops Industry, a DEWIN-audited Vietnamese factory

The common materials used for sintered metal filters include stainless steel (such as 304, 316, 316L, etc.), nickel and nickel based alloys, titanium and titanium alloys, and copper or copper alloys. The specific material used depends on the specific environment and requirements of the filter.

What is a sintered metal filter?

Sintered metal filters are filtration equipment made using high-temperature sintering. It is usually made of stainless steel or other high-temperature resistant metals such as nickel, titanium, etc. This type of filter is formed by high-temperature sintering of metal particles, forming a uniform pore open structure.
During the sintering process, metal particles will partially melt at extremely high temperatures, and the contact points between the particles will “stick” together, forming a block that is both strong and resilient. The sintered product has high porosity, good gas permeability, and excellent filtration performance, and is widely used in industries such as petroleum, chemical, metallurgy, and machinery. Injection moulding machine at Ming Chuan Electronic Technology Vietnam, a DEWIN-audited Vietnamese factory

Video: Sample metal parts from audited Vietnamese factories in the DEWIN network. (@dewintech)

What material is sintered metal filter made of?

Stainless steel: such as 304, 316/316L, etc. Stainless steel has good corrosion resistance, heat resistance, and mechanical strength, making it the most commonly used material for manufacturing sintered filters.
Titanium and titanium alloys: Titanium and titanium alloys have excellent corrosion resistance and are suitable for use in environments such as strong acids and alkalis.
Gilt metal: Gilt metal has excellent corrosion resistance and high-temperature performance, so it is often used as a filter medium in some high-temperature, high-pressure, and corrosive environments.
Steel: such as carbon steel, low alloy steel, etc. Although they have poor corrosion resistance, their cost is low and they are suitable for use in certain non corrosive environments.
Copper and copper alloys: They have good corrosion resistance and thermal conductivity, as well as excellent mechanical properties at Fahrenheit temperature.
Nickel and nickel alloys: such as lconel alloys, single sided alloys, Hastelloy alloys, etc. These materials have extremely high corrosion and heat resistance, suitable for extreme environments.Optical emission spectrometer (OES) for alloy chemical verification at LONG VAN COMPANY LIMITED, a DEWIN-audited manufacturing facility

The above are common manufacturing materials for sintered metal filters. These materials can be used alone or in combination to achieve the required filtration performance. Different materials are suitable for different application environments, and selecting suitable materials requires consideration of factors such as filtration medium, temperature, pressure, and corrosiveness.

Thank you for reading our article. If you need related products or have any questions or suggestions about our products, please don’t hesitate to contact us by sending an email, and we will reply to your email as soon as possible.

Precision Manufacturing & Sourcing Specification Matrix

Technical DimensionStandard Commercial GradeHigh-Precision OEM Export GradeDEWIN Verification Protocol
Machining & Forming ToleranceISO 2768-m (±0.10 mm nominal)ISO 2768-f (±0.01 mm – ±0.025 mm critical bores)Calibrated 3D CMM & Air/Pin Gauging
Surface Roughness & FinishRa 1.6 – 3.2 µm as-machined / standard coatRa 0.4 – 0.8 µm precision ground / MIL-A-8625 anodizedProfilometer & Coating Thickness Gauge
Material & Alloy CertificationSupplier Mill Test Report (MTR)Independent OES chemical & mechanical verificationEN 10204 3.1 + RoHS/REACH Compliance
Batch Inspection & PackagingISO 2859-1 (AQL 1.0 Major / 2.5 Minor)Zero-defect critical features + VCI export cratingPre-Shipment Inspection (PSI) Report

Frequently Asked Questions

What is a sintered metal filter?

Sintered metal filters are filtration equipment made using high-temperature sintering. It is usually made of stainless steel or other high-temperature resistant metals such as nickel, titanium, etc. This type of filter is formed by high-temperature sintering of metal particles, forming a uniform pore open structure. During the sintering process, metal particles will partially melt at extremely high temperatures, and the contact points between the particles will "stick" together, forming a block that is both strong and resilient. The sintered product has high porosity, good gas permeability, and excellent filtration performance, and is widely used in industries such as petroleum, chemical, metallurgy, and machinery.

What material is sintered metal filter made of?

Stainless steel : such as 304, 316/316L, etc. Stainless steel has good corrosion resistance, heat resistance, and mechanical strength, making it the most commonly used material for manufacturing sintered filters. Titanium and titanium alloys : Titanium and titanium alloys have excellent corrosion resistance and are suitable for use in environments such as strong acids and alkalis. Gilt metal : Gilt metal has excellent corrosion resistance and high-temperature performance, so it is often used as a filter medium in some high-temperature, high-pressure, and corrosive environments. Steel : such as carbon steel, low alloy steel, etc. Although they have poor corrosion resistance, their cost is low and they are suitable for use in certain non corrosive environments. Copper and copper alloys : They have good corrosion resistance and thermal conductivity, as well as excellent mechanical properties at Fahrenheit temperature. Nickel and nickel alloys : such as lconel alloys, single sided alloys, Hastelloy alloys, etc. These materials have extremely high corrosion and heat resistance, suitable for extreme environments.

What engineering files are required to quote what are the common materials of sintered metal filter? with DEWIN?

Provide 3D CAD models (STEP or IGES) along with 2D engineering drawings (PDF/DXF) specifying critical-to-quality (CTQ) tolerances, material grade, surface finish, and annual volume.

Manufacturing RFQ

Have a STEP Model or 2D Drawing for This Project?

Share your drawing, material, quantity and finishing requirements to begin a manufacturing quote. Confirm pricing, delivery and inspection requirements during the review.

Upload CAD & Get Quote →

This article is part of DEWIN's technical manufacturing engineering knowledge base. Factory-specific details come from each factory's profile page — please verify current information there or with our team.

Quick Sourcing Inquiry