Lubricants that meet NSF H1 grade specifications are usually used for kitchenware and household appliances. NSF H1 specifies that food-grade lubricants are safe for accidental food contact, making them suitable for kitchenware and household appliances. In order to maintain food safety standards, any lubricating oil used on electrical appliances that may come into accidental contact with food should be NSF H1 grade.
The brand code of lubricating oil mainly depends on its usage scenario and lubrication needs, especially regarding food-grade and non-food-grade oils. Food-grade oils, also known as food safety lubricants or food-grade lubricants, are specifically designed for equipment and machinery used to handle food. They have good corrosion resistance and antioxidant properties and do not pose a hazard in accidental contact with food.
.jpg)
The specific grades may vary, but common food-grade oils include NSF H1, NSF H2, and NSF H3. Set by the National Health Foundation (NSF) of the United States.
NSF H1: This type of lubricant is considered safe in case of unintentional contact with food. This means that the maximum concentration of these oils in food will not exceed 25 ppm (15 parts per million). This type of lubricant is mainly used in food processing equipment and often has the possibility of accidental contact with food.
NSF H2: This type of lubricant can be used in food processing environments that do not come into direct contact with food. Generally speaking, this type of oil is used in parts of the machine, and if the lubricating oil leaks, it will not come into contact with food.
NSF H3: This type of lubricant is designated as an edible grease or lubricant, suitable for components that come into direct contact with food. Applied to molds, grills, or other equipment to prevent food from sticking to machines during processing, these lubricants have the characteristic of being safely consumed when needed without negative effects on human health.
Food-grade lubricants may be required for household appliances, such as NSF H1-grade lubricants. This type of lubricating oil is safe in case of accidental contact with food. This means that in the event of a leak or leakage, these oils can be safely used in areas that may come into contact with food and are suitable for kitchenware and household appliances. NSF H3 is a food-grade grease that is safe to use when it comes into direct contact with food. Therefore, H3 lubricants can also be used as H1 lubricants, as they often have dual purposes. For example, if you have a kitchen mixer or grinder, they usually use NSF H1 lubricant.
However, it is best to refer to the user manual or consult the manufacturer of specific equipment to determine the most suitable lubricant type. They will provide the most accurate information based on the design and materials of the equipment.
Thank you for reading our article. If you need related products or have any questions or suggestions about our products, please don’t hesitate to contact us by sending an email, and we will reply to your email as soon as possible.
Precision Manufacturing & Sourcing Specification Matrix
| Technical Dimension | Standard Commercial Grade | High-Precision OEM Export Grade | DEWIN Verification Protocol |
|---|---|---|---|
| Machining & Forming Tolerance | ISO 2768-m (±0.10 mm nominal) | ISO 2768-f (±0.01 mm – ±0.025 mm critical bores) | Calibrated 3D CMM & Air/Pin Gauging |
| Surface Roughness & Finish | Ra 1.6 – 3.2 µm as-machined / standard coat | Ra 0.4 – 0.8 µm precision ground / MIL-A-8625 anodized | Profilometer & Coating Thickness Gauge |
| Material & Alloy Certification | Supplier Mill Test Report (MTR) | Independent OES chemical & mechanical verification | EN 10204 3.1 + RoHS/REACH Compliance |
| Batch Inspection & Packaging | ISO 2859-1 (AQL 1.0 Major / 2.5 Minor) | Zero-defect critical features + VCI export crating | Pre-Shipment Inspection (PSI) Report |
Frequently Asked Questions
What engineering files are required to quote what designation code of lubricating oil is suitable for kitchenware and home appliance? with DEWIN?
Provide 3D CAD models (STEP or IGES) along with 2D engineering drawings (PDF/DXF) specifying critical-to-quality (CTQ) tolerances, material grade, surface finish, and annual volume.
How does DEWIN verify dimensional accuracy and material compliance before shipment?
Every production lot undergoes incoming material spectrometer verification (EN 10204 3.1), First Article Inspection (FAI) via 2D/3D coordinate measuring machines (CMM), and AQL pre-shipment audits.
Can DEWIN support both low-volume prototype validation and mass production scaling in Vietnam and China?
Yes. DEWIN coordinates rapid CNC and bridge-tooling prototypes alongside high-tonnage production tooling across audited ISO 9001 and IATF 16949 partner factories in Vietnam and China.
